Seward County, Kansas · Fiscal review

Thresher Wind CUP: Benefits, Risks, and Unanswered Questions

A plain-language guide to the October 28 CUP draft, explaining its provisions, their limits, and their implications for Seward County residents.

Based on the October 28, 2026 proposed conditional use permit.

Disclaimer: Prepared by a non-attorney for informational purposes only. This explainer is not legal or tax advice. Readers should consult the original CUP and agreement documents for their exact terms.

The October 28, 2026 proposed CUP is included in this file for reference. Source links throughout this guide point to the relevant provisions.

The draft delegates broad CUP waiver authority to the County Administrator and the Planning and Zoning Administrator

The draft grants either administrator power to excuse compliance with CUP provisions without a separate BOCC decision each time, unless the board retains that authority. Section II.14.j gives this power individually to the County Administrator and the Planning and Zoning Administrator. The delegation operates within the specific decision requirements and legal limits described below.

What the draft authorizes

Section II.14.j says the two administrators may “each individually interpret, waive, and enforce, any CUP provision,” unless the BOCC elects to retain that discretion from time to time. “Each individually” does not require the two administrators to act together. “Waive” goes beyond interpreting or enforcing a requirement. The clause itself does not limit waivers to minor or technical matters or require advance board approval, public notice, or written findings for each waiver. Discretion clause, pp. 17–18.

Interpretation, enforcement, and waiver are different powers. Interpretation determines what a requirement means. Enforcement requires compliance using the available procedures and remedies. Waiver excuses compliance to the extent covered by the waiver. Approving a report because it satisfies a requirement is administration; excusing the requirement to provide the report is a waiver.

The draft BOCC resolution approves the CUP on the terms of the resolution and its attachments. Section II.14.a incorporates the exhibits, including Exhibit D’s agreement minimum terms, into the CUP. Section II.7 expressly makes its amendment and waiver rules subject to an exception for § II.14.j. The waiver authority is therefore part of the delegation the BOCC is being asked to approve. Draft resolution, pp. 1–2 · Incorporation of exhibits, p. 17 · Amendment clause, p. 14.

Boundaries stated in the draft

The draft assigns particular decisions to particular officials or bodies. Section I.3.b requires a BOCC majority vote on the road, decommissioning, and contribution agreements. Exhibit D assigns certain road disputes to the BOCC and assigns approval of the certification for releasing road security to the Road and Bridge Director. These specific decision requirements must be read together with the general waiver authority. Agreement approval, p. 6 · Road appeals, p. 72 · Road security and disputed costs, p. 74.

The packet contains two directions for resolving conflicting provisions. CUP § II.14.g gives priority to the provision most specifically applicable, followed by harmonization where reasonably possible. The incorporated development plan says the provision most favorable to the county or most restrictive to Thresher applies. Both directions matter when interpreting a conflict; the general waiver clause cannot be read in isolation from the rest of the packet. CUP conflict rule, p. 17 · Development-plan conflict rule, p. 46.

The CUP requires compliance with applicable law and remains subject to the zoning regulations. Section II.14.n also makes Planning and Zoning Administrator approvals contingent on approval by other county personnel with relevant expertise or authority. Section II.14.j allows the BOCC to retain discretion. Compliance requirements, p. 4 · Retained discretion, zoning regulations, and personnel approvals, p. 18.

What the reviewed draft omits

The draft resolution contains no express reservation narrowing § II.14.j’s waiver authority. Although the CUP assigns specific decisions to the BOCC, the reviewed packet contains no general requirement for a BOCC vote before material taxpayer protections are waived. Section II.14.j supplies no minor-matters limit, dollar threshold, or express exclusion for financial protections, and no general procedure requiring public notice or written findings for its waivers.

Why it matters to taxpayers: a waiver can leave a requirement printed in the CUP while excusing compliance with it. That can reduce the payment, work, documentation, or other performance the county requires to the extent covered by the waiver. The concern is the breadth of the delegated power and the absence of a general board-approval safeguard for material waivers.

Finding from the reviewed draft: broad administrative waiver authority is granted, and waiver of material taxpayer protections is not expressly reserved as a category to the BOCC. Specific board-decision requirements and applicable legal limits remain in place.

Revenue in county context

For illustration, 22 turbines rated at 4.5 megawatts each would provide 99 MW of installed capacity. The application anticipates commercial operation in 2029. Assuming full 99-MW buildout and commercial operation that year, the CUP’s minimum rate of $3,940/MW for 2028 increases by 3% to $4,058.20/MW in 2029. That produces a first annual contribution of approximately $401,762 before qualifying deductions and county expenses. Full buildout and a 2029 payment are not guaranteed. Application timeline · Partial-buildout and delayed-start examples.

Payment illustrations use the stated minimum rate before deductions and the CUP’s 3% compounding formula, with dollar results rounded to the nearest whole dollar unless shown otherwise. A minimum per-MW rate does not guarantee a minimum total receipt when capacity or deductions change. The calculator starts with the rounded first payment. How this compares with the county’s advertised total.

$401,762Illustrative gross contribution with full 99-MW buildout and commercial operation in 2029
1.38 millsRevenue equivalent on the assessed valuation shown in the 2027 budget
1.10%Of the county’s $36.67 million budget authority for expenditures

The same contribution equals 3.49% of the county’s $11.51 million property-tax levy. The comparisons use the adopted 2027 budget and exclude the separately listed Rural Fire District. Budget authority is the amount the county may spend, not actual spending. Future budgets and valuations may differ. [2]

No household tax reduction is promised. The county decides how to use the contributions. The mill comparison shows the payment’s size, not a proposed tax cut. [1]

What would it cost to raise comparable revenue through property taxes?

For comparison, raising approximately $402,000 annually through an additional county levy on the tax base shown in the 2027 budget would require about 1.38 mills—comparable to the illustrated first-year contribution before deductions. A levy increase would be paid by property owners; the wind project’s other benefits and potential costs require separate evaluation.

The same additional mill rate applies to taxable assessed value. Kansas assesses residential property at 11.5% of appraised value and commercial or industrial real estate at 25%. That difference produces different tax amounts for properties with the same appraised value. [5]

Annual increase from an additional 1.38 mills, with property values unchanged
Property exampleAppraised valueAssessment rateAnnual increase
Residential — per $100,000 appraised$100,00011.5%$15.87
Commercial/industrial real estate — per $100,000 appraised$100,00025%$34.50
Home appraised at the Census median value$136,50011.5%$21.66

The $136,500 benchmark is the Census Bureau’s 2020–2024 median value of owner-occupied homes in Seward County. The example assumes a county appraisal of that amount; it is not a verified median tax increase from current county assessment records. [6]

How the property-tax examples are calculated

Annual increase = taxable assessed value × 1.38 ÷ 1,000.

Residential: $100,000 × 11.5% × 1.38 ÷ 1,000 = $15.87.

Commercial real estate: $100,000 × 25% × 1.38 ÷ 1,000 = $34.50.

Median-home example: $136,500 × 11.5% × 1.38 ÷ 1,000 = $21.66255, rounded to $21.66.

These examples assume fully taxable property in the stated class. Other property classes can use different assessment percentages or valuation methods; agricultural land uses agricultural-use valuation rather than ordinary market value.

At the budget’s $290,624,043 assessed tax base, exactly 1.38 mills would levy $401,061.18. Matching the unrounded $401,761.80 first-payment calculation would require approximately 1.382411 mills. The property-tax examples use the rounded 1.38-mill rate throughout and compare one year of revenue.

The ten-year figure needs the same context

With commercial operation in 2029, all 99 MW throughout, and 3% annual increases, ten contributions total approximately $4.61 million—an average of $460,575 per year, before deductions and county expenses. This is the sum of future payments, not discounted to today’s dollars. It is not a guaranteed minimum. Read contribution terms.

How does this compare with the county’s advertised $4,605,480?

Both figures use ten payments from 2029 through 2038 and assume all 99 MW count throughout. Applying the CUP’s stated 3% compounding formula gives $4,605,748.79. Multiplying the whole-dollar per-MW rates printed in the CUP’s table by 99 MW gives the county’s advertised $4,605,480. The difference is $268.79 over ten years; both are approximately $4.61 million before deductions.

The main illustration uses the application’s anticipated 2029 start. Rates increase by calendar year even before operations begin. These totals exclude the separate $287,000 initial payment.

The CUP does not require Thresher to build or complete the project. If the project never reaches commercial operation, annual contributions do not begin. If fewer turbines are built, the capacity used to calculate payments may be smaller. The $4.61 million figure is therefore a full-project illustration, not a guaranteed payment total. The $287,000 initial payment is a separate obligation tied to the CUP’s effective date. Read the no-development-obligation clause · See what payments are required and what remains conditional.

The initial $287,000 payment for county costs and impacts is separate from recurring revenue. Future project property taxes and contribution adjustments require separate analysis to avoid double-counting. [1]

Would the 3% annual increase keep pace with inflation?

At 3% annual inflation, the 3% payment increase would preserve purchasing power. Higher inflation would reduce what the payment buys; lower inflation would increase it, assuming unchanged capacity and no deductions. The CUP specifies a fixed 3% increase rather than an adjustment to actual inflation. Read the annual-payment terms.

For context, U.S. consumer prices rose at a compounded average of 3.11% per year from 2015 to 2025. The rate was 4.46% over 2020–2025 and 1.77% over 2015–2020. The 3% increase is close to that ten-year rate, but the shorter periods show how much inflation can vary. These are historical comparisons, not forecasts. [4]

The Consumer Price Index measures household prices. County legal, road-repair, and removal costs may rise at different rates.

What would different inflation rates mean over the payment period?

Assume 99 MW throughout, a calculated first payment of $401,761.80 (approximately $401,762) in 2029, and no deductions. The tenth payment in 2038 would be approximately $524,208 after nine annual 3% increases. Its purchasing power would depend on inflation:

Hypothetical constant inflation from the first payment to the tenth
Annual inflationTenth payment
in 2029 dollars
Change in purchasing power
2%$438,6349.2% higher
3%$401,762Unchanged
4%$368,3028.3% lower

These scenarios compare the gross payment’s purchasing power with the first payment, before deductions and county costs. No inflation rate is assigned a probability.

Which inflation measure and calculation are used?

The historical comparison uses BLS annual-average CPI-U, U.S. city average, all items, not seasonally adjusted. Published index values are 237.017 for 2015, 258.811 for 2020, and 321.943 for 2025. The comparison ends in 2025 because a full-year 2026 average is not yet available.

“Compounded average” means the constant yearly rate that produces the same total price increase over the stated period. This matches the compounding method used for the contribution.

Average annual inflation = (ending CPI ÷ starting CPI)^(1 ÷ years) − 1.

Tenth payment in 2029 dollars = $401,761.80 × [1.03 ÷ (1 + assumed inflation)]^9, rounded to the nearest dollar.

BLS calculated its published 2025 annual average from 11 months because October data were unavailable during the federal shutdown. The figures here use that published average. Sources: BLS annual CPI table and BLS explanation of the 2025 calculation.

When do payments begin—and what if fewer turbines are built?

What the CUP says

Annual contributions begin in December of the year the project reaches commercial operation (COD), for a total of ten consecutive annual payments. Exhibit D bases the amount on “nameplate installed wind generating capacity,” at a minimum rate of $3,940 per MW for 2028, increasing 3% each subsequent calendar year, before qualifying deductions. The formula uses capacity, not the amount of electricity sold. Read the annual-payment terms — PDF pages 65–66.

What payments are guaranteed?

The CUP does not require Thresher to build or complete the project. Section I.2.a expressly states that it creates no obligation or promise to pursue or complete any portion of the project. If the project never reaches commercial operation (COD), annual contributions do not begin. If only part of the project is built, the capacity counted toward payments may be smaller. No-development-obligation clause — PDF page 4.

The $4.61 million total is therefore not guaranteed. That ten-year illustration assumes COD in 2029, the full 99 MW counted throughout, 3% annual increases, and no qualifying deductions. The CUP does not promise that total if the project is never built or only partly completed, and it does not provide a minimum annual contribution that must be paid even if the project never reaches COD.

The $287,000 initial payment is a separate required payment under the proposed CUP. Section II.1.a makes it due within 45 days after the CUP’s effective date, subject to § II.2’s approved-invoice and payment-instructions conditions. Its trigger does not depend on COD. Initial-payment terms — PDF page 11 · Payment conditions — PDF page 11.

Payments beyond $287,000 can become due when their stated conditions are met. Annual contributions begin with project COD and depend on the capacity counted and applicable deductions. Specified legal-expense reimbursements depend on qualifying County costs and the reimbursement conditions; they repay expenses rather than represent entirely new revenue. Later-year supplemental contributions and other reimbursements or remedies have their own triggers. These obligations do not establish a fixed minimum of additional annual revenue if the project never reaches COD. Annual and later-year contribution terms — PDF pages 65–66 · Expense-reimbursement terms · Default procedures and remedies.

Calculating payments if construction occurs in stages

The draft provides one project-level sequence of ten annual payments based on installed nameplate capacity. It does not specify the COD milestone for partial operation, when a turbine enters the capacity calculation, the annual capacity measurement date, or a new ten-year payment period for later-added turbines. These details affect a phased project’s calculation. The examples below illustrate the payment terms; they are not a construction forecast.

The interpretation rules and the definitions in the reviewed documents

The reviewed zoning regulations and application do not supply the missing COD milestone or installed-capacity measurement rule. Page 9 of the CUP requires confirmation that the conditions preceding COD have been met; it does not define the production milestone itself.

Sections II.14.c–d provide rules for interpreting capitalized terms: terms in the main CUP follow its stated hierarchy of CUP definitions, consistent exhibit definitions, zoning definitions, and zoning interpretation rules; terms in an exhibit are defined under that exhibit. Zoning § 1-104 directs ordinary or customary meaning and context for undefined words. These rules give a basis for interpretation even where an express definition is missing. They do not themselves specify the production milestone or capacity measurement date for these scenarios.

Exhibit E’s neighbor agreement separately defines an “Operations Date” by first production of electricity in commercial quantities. It does not expressly identify that date as the COD trigger for the county contribution. The neighbor agreement’s definition therefore supplies no express county-payment trigger.

Payment obligations under different construction and production scenarios

These scenarios compare the same payment terms at different levels and stages of completion.

Six scenarios: payment terms and their effect on county revenue
ScenarioWhat the CUP saysEffect on revenue and calculation limits
1. The project never reaches COD. Nothing is built, or the project stops before reaching COD.Annual contributions do not begin. The separate $287,000 initial payment is tied to the CUP’s effective date, subject to its payment conditions.The county receives no annual contribution for a year before COD.
2. A permanently smaller project. Only some of the planned 22 turbines are ever installed and brought into production.Thresher has no obligation to complete all 22. Annual contributions use installed capacity.Less capacity counted at the same per-MW rate produces a smaller payment.
3. Construction and production in stages. Some turbines produce while others remain unbuilt, under construction, undergoing testing, or waiting for infrastructure.The first annual contribution is due in December of the project’s COD year.The draft does not specify whether the first producing group establishes project COD. That omission affects when the county’s ten-payment period begins.
4. All 22 are physically installed, but only some are capable of producing electricity. Assume project COD has occurred. The remaining turbines still require connections, testing, or other work.The formula uses installed nameplate capacity. It does not expressly limit payment to turbines that have begun producing electricity.The draft supplies no express test for counting physically installed turbines that are not yet capable of production, and no annual measurement date. The amount owed depends on that interpretation.
5. Additional turbines begin producing after payments have started. These may be newly installed turbines or previously installed turbines that finish testing or connection work.The CUP specifies ten consecutive annual payments beginning in the project’s COD year. It does not expressly give each later turbine a new ten-payment period.Later capacity is subject to the project’s existing payment period, with no express new ten-payment term for each turbine. The draft does not specify when previously uncounted capacity enters an annual calculation. Production by an already-counted turbine adds no new nameplate capacity.
6. The full project is completed at the outset. Assume project COD occurs in 2029 and all 22 turbines count toward payment.At 4.5 MW per turbine, 99 MW × $4,058.20/MW = $401,761.80, or approximately $401,762 before deductions.This calculation assumes the stated COD year and full capacity qualify. It illustrates the full-project payment; it does not guarantee completion or the amount ultimately received.

What the capacity counted means in dollars

Annual contribution = capacity counted (MW) × applicable annual rate − qualifying deductions.

These examples apply the calculated 2029 minimum rate of $4,058.20/MW to different amounts of capacity, assuming 4.5 MW per turbine, that the annual-payment obligation has begun, and that the listed capacity counts toward payment.

Annual payment illustrations at the calculated 2029 rate
Turbines countedCapacity countedContribution
before deductions
1045 MW$182,619
2299 MW$401,762

Is the first annual contribution reduced if commercial operation begins late in the year? Assuming project COD has been established, the CUP specifies a payment in December of that year. It does not expressly provide for prorating that payment based on the number of months of operation. The stated payment formula contains no reduction based on the number of months operated in that first year.

How does a later commercial-operation year affect payments?

These examples assume project COD occurs in the stated year and show how the schedule and minimum rate change.

  • The payment schedule moves: the main illustration assumes COD in 2029 and payments from December 2029 through December 2038. If COD instead occurs in 2030, the ten payments would run from December 2030 through December 2039.
  • The per-MW rate keeps rising during the delay: the clause specifies cumulative 3% annual escalation from the 2028 base even if COD occurs later. The formula gives $4,179.946/MW in 2030. If all 99 MW count, the first payment would be $413,814.654—approximately $413,815—before deductions. The printed whole-dollar rate table and the compounding formula produce slightly different totals. Formula and printed-table comparison.
  • No separate catch-up payment is specified: if COD is first established in 2030, the clause does not provide a separate annual contribution for 2029 or earlier years.
What payment or recourse applies if fewer than 22 turbines are built—or none are completed?

The CUP does not require Thresher to build or complete the project. Section I.2.a expressly states that it creates no obligation or promise to pursue or complete any portion of the project. Building fewer than 22 turbines, or not completing the project, is therefore not by itself a breach of a promise to build all 22. Other payment, repair, restoration, and compliance obligations remain governed by their own terms. No-development-obligation clause — PDF page 4.

The CUP expressly acknowledges that County benefits will be reduced if the entire project is not developed and operated for its contemplated useful life. Section II.1 then requires a $287,000 initial payment, due within 45 days after the CUP’s effective date, and specified reimbursements of County legal expenses. These payments are subject to the CUP’s payment conditions, including invoicing. The initial-payment trigger does not depend on COD or completion of all 22 turbines.

The CUP does not specify an additional payment per unbuilt turbine or guarantee annual contributions equal to the 22-turbine illustration. The initial payment is not stated to replace lost annual contributions dollar for dollar.

Ending the permit does not automatically erase Thresher’s obligations. Section II.13 says that, after the CUP terminates or expires, Thresher remains liable for County costs arising from damages caused by breaches of the CUP or regulations and for obligations that reasonably survive, including decommissioning and restoration, applicable road-use obligations, and payments due to the County. It states a three-year survival period for the obligations in that paragraph, while preserving County rights and remedies under other agreements or documents. This preserves applicable obligations; it does not guarantee the projected annual contributions or payment for turbines never built. Read the survival clause — PDF page 16.

Permit and development-plan deadlines: § II.10 addresses failure to begin defined construction within three years and cessation of the permitted use for six months, subject to its stated terms and the BOCC’s authority to agree otherwise. Development-plan approval has a separate one-year construction deadline and one possible one-year extension. If that plan is voided, § II.10 requires construction and use to cease even while the CUP remains in effect, unless the BOCC agrees otherwise. Read both deadlines. Section II.12 also allows revocation or termination following a default under its procedures.

These protections may require enforcement. If the parties disagree about a breach, the work required, amounts owed, or which obligations survive, the CUP provides notice and applicable cure procedures and directs disputes to a court of competent jurisdiction. Those procedures can delay performance or payment and require county staff time and legal expense. Dispute provision — PDF page 14 · Disputes and default procedures — PDF page 15.

What could reduce the annual contribution?

The $401,762 illustration is the contribution before the reductions listed in Exhibit D § 2. The draft provides ten annual contributions beginning in the commercial-operation year, lists tax-related reductions, and separately provides revenue-shortfall protection for operating years 11–20. These are distinct payment provisions. Read Exhibit D §§ 1–2 — PDF pages 65–66.

The reduction clause covers “payments due under this Agreement.” It is not limited to the first ten contributions; continued payments under the extended-exemption provision must also be read with it. The years 11–20 make-up provision begins “Notwithstanding any other provision herein,” giving that protection priority over conflicting payment terms. How the later-year payments work.

The agreement lists possible reductions; it does not establish an actual deduction amount. The discussion below reports the payment terms. It does not determine which taxes Thresher will owe or which exemptions apply to particular property or purchases.

Payment illustration: a $100,000 reduction from the illustrated $401,762 contribution would leave a $301,762 payment. This explains the effect of a deduction, not a forecast that such a deduction will occur.

If Thresher signs a higher-rate agreement with Meade or Gray, Seward’s agreement must be amended to match

Exhibit D § 3 protects Seward if Thresher signs a new contribution agreement or amends an existing one with Meade or Gray County at a higher annual rate per megawatt than Seward’s. Seward County and Thresher must then amend Seward’s agreement to match that annual per-megawatt payment structure.

The matching provision contains inconsistent references. It refers to payments “set forth in Section 3,” although the annual-payment terms are in Section 1, and then names an agreement with “Seward County” as the match even though the trigger concerns Meade or Gray. The stated trigger is a higher payment elsewhere; the inconsistent references create room for dispute about implementing that protection. Read the parity clause, PDF p. 66.

The five reduction categories listed in the draft
  1. Property taxes: real or personal property tax due on property in Kansas, owned by Thresher Wind and associated with operating the facility.
  2. Specified sales or use taxes: Kansas taxes due on purchases for construction or enlargement of the facility, and specified machinery or equipment used in production or handling its output.
  3. Other Kansas state or local taxes: taxes imposed on the facility’s income, operations, or property, excluding Kansas income tax, franchise tax, and sales/use tax from this category. Specified sales/use taxes are listed separately in item 2.
  4. Changes to specified tax benefits: amendments after the agreement date to the Kansas laws or regulations named in § 2(d) that reduce benefits available to Thresher Wind or the facility.
  5. Mortgage registration tax: listed in § 2(e).

These are the draft’s categories, not findings that Thresher owes each tax or qualifies for each benefit. Listing a tax in the agreement does not itself impose that tax.

The reduction clause and the years 11–20 county-revenue calculation

The reduction clause applies to payments due under the agreement and lists specified taxes imposed on Thresher by Kansas or its governmental subdivisions. It does not restrict the list to taxes levied for Seward County or expressly limit deductions to the first ten payments.

The years 11–20 calculation is a separate make-up payment with express priority over conflicting terms. It counts only taxes on the wind project that are levied for Seward County government itself. For a property-tax bill, that means the county government’s portion, excluding the amounts for USD 483 and other taxing entities. If the county’s portion falls below the agreement’s benchmark, Thresher pays the difference. See the dollar example below.

This distinction describes which amounts the two provisions address. The reviewed draft does not establish a shared tax bill or a deduction against several counties’ payments. No such deduction is included as a projected taxpayer cost in this guide.

A contribution reduction is different from a county expense

A deduction reduces the money Thresher pays the county. A county expense is money the county spends. Both affect the county’s net benefit, and they are separate entries in the guide’s financial examples.

Section 2 lists tax-related reductions. It does not list landowner rent, road-repair spending, decommissioning deposits, legal or financing expenses, the initial $287,000 county payment, or contributions under a separate school agreement as deductions from the annual contribution.

How the draft handles deduction amounts and disputes

No general deduction cap: the reduction paragraph specifies no annual cap or minimum payment remaining after deductions. The separate years 11–20 make-up obligation has express priority over conflicting payment terms. Its protection must be considered alongside the broader deduction language.

Calculation details: the reduction clause does not specify which contribution year absorbs a pre-operation tax, how later tax refunds affect an earlier reduction, or a detailed formula for valuing the loss of a listed tax benefit. These omissions limit what can be calculated from the draft alone; they do not establish that any particular deduction will occur.

Disputes: Exhibit D § 4 requires written notice, a meeting within ten days, and good-faith negotiation before the stated route to legal remedies. A disputed reduction can require county time and legal expense to resolve.

Years 11–20: county taxes plus a make-up payment if needed

The county counts its own portion of taxes on the wind project. Under the second paragraph of Exhibit D § 2, if that amount is below the agreement’s payment benchmark in an operating year from 11 through 20, Thresher must pay the difference. The obligation depends on the project remaining in operation.

This paragraph begins “Notwithstanding any other provision herein.” That gives the years 11–20 make-up obligation priority over conflicting payment provisions, including the general reduction language.

For property taxes, the amount counted is the portion levied for Seward County government itself. Amounts for USD 483 and other taxing entities are excluded, even if collected on the same tax bill. “Taxes on the wind project” is a description of what is being taxed, not the name of a separate or special tax.

Example: $300,000 in county property taxes plus a $100,000 make-up payment

Suppose the agreement’s benchmark for a year is $400,000, and the county government’s portion of property taxes on Thresher’s wind-project property is $300,000:

  • County property taxes: $300,000. This is the county government’s own portion, excluding school taxes and amounts for other taxing entities.
  • Thresher’s additional payment: $100,000. This makes up the difference between $300,000 and the $400,000 benchmark.
  • Total received by county government: $400,000. The county receives the property taxes plus the make-up payment, rather than a full $400,000 contribution on top of those taxes.

These are illustrative amounts, not a tax estimate or a stated payment schedule. The draft measures taxes “levied”—the amount imposed—not taxes actually collected. This example assumes the $300,000 is both levied and collected.

After operating year 20, this make-up obligation ends even if the project continues operating. Section 2 no longer requires Thresher to supplement county tax revenue up to the agreement’s benchmark. County receipts can therefore fall below that benchmark. Whether lower receipts produce a budget gap or additional taxpayer burden depends on county spending, other revenues, and future decisions.

A separate rule addresses an exemption extending beyond year ten. Exhibit D § 1 applies if, after the agreement’s execution date, the project becomes exempt from property taxes for years beyond year ten. It requires continued annual contributions until the earlier of the exemption ending and the project becoming taxable, or the project being decommissioned and no longer operating. That provision has no express year-20 cutoff. These continued payments remain subject to the agreement’s payment terms, including the reductions and the overriding years 11–20 protection.

The extended-exemption clause states starting rates of $5,295/MW for a 2028 commercial start or $5,454/MW for a 2029 start, followed by 3% annual increases. Those are contractual payment terms; the clause does not determine the project’s exemption eligibility.

The benchmark: § 2 refers to the “amounts provided for in this Agreement” and supplies no separate year-by-year benchmark table for all of years 11–20. The amount requires interpretation with the payment and escalation terms.

Does the assessment cover the complete project?

What benefits would the wind project provide to Seward County and its residents, what costs and risks would remain, and does the available evidence show that the benefits outweigh them? Answering that question requires understanding the supporting infrastructure as well as the turbines.

The October 28 CUP packet covers a defined part of the project: 22 turbines, gravel access roads, and underground collection lines. Its development plan excludes substations from its approved improvements and requires missing transmission-equipment information with the specified construction or site-work application. The fiscal assessment therefore concerns this defined Seward CUP and its obligations. CUP scope · Development-plan terms.

Component or reviewWhat the CUP packet establishes
Turbines and access roadsThe CUP includes 22 turbines and gravel access roads. The development plan lists a ground-to-blade-tip height of 609 feet for the described turbines. CUP scope · Turbine specifications.
Underground collection linesIncluded in the CUP. The development plan describes private lines connecting turbines to substations, with separate requirements for lines in public roads or rights-of-way. Collection-line terms.
SubstationsThe development plan says they were not included in the submitted map and are not among its approved improvements. The application describes four collector substations outside Seward County. Application, pp. 11–13. Development-plan wording.
Transmission equipmentThe development plan says information was missing apart from underground collection-line routes. It requires that information with an application for construction, improvements, or site work. Missing-information requirement.
Further reviewThe development plan requires updates addressing missing elements before work begins and says those updates require Planning Commission approval. Review requirement.

These findings describe the reviewed packet, not the status of every approval for the broader development. The records reviewed do not establish the routes, ownership, separate approvals, or county financial responsibility for facilities outside this CUP.

Supporting infrastructure: what this permit covers and why it matters
  • Locations and scope: this CUP includes the project’s private collection lines and access roads on the permitted property. The application places four collector substations outside Seward County; the CUP does not approve those substations.
  • Costs outside this CUP: the reviewed packet does not allocate all costs of the broader development’s substations, transmission connections, and grid upgrades. Those costs cannot be assigned to Seward taxpayers from this CUP alone.
  • Development-plan review: the draft requires missing plan elements to be submitted for Planning Commission approval before the specified site work. Staff-only approval of those missing elements is expressly excluded.
  • Protection follows the covered work: the CUP’s road, insurance, indemnity, and restoration provisions apply within their stated scope. They do not establish comprehensive coverage for every facility in the broader development.
  • Operating dependencies: annual contributions begin with COD. Any infrastructure delay that postpones COD also postpones the start of those contributions; the draft provides no annual contribution for a year before COD.

The application describes four collector substations outside Seward County, with a 34.5-kV collection system stepped up to 345 kV. That description establishes the proposed connection arrangement, not its approval status or a county obligation to pay for it. Application, PDF pp. 11–13.

How do county finances relate to benefits and risks for residents?

County receipts are one part of the assessment. Private lease income, employment, and local business activity may also benefit residents. The amounts and distribution of those benefits have not been quantified here.

Effects on neighboring property, land use, roads, and emergency services also matter to residents. The draft includes these operating protections:

  • Residence setbacks: at least 1,000 feet from each defined Occupied Residence, increasing to 1,900 feet for an Occupied Residence on Non-Participating Land.
  • Sound: turbine sound must not exceed 50 dBA outside or inside an Occupied Residence on Non-Participating Land.
  • Shadow flicker: no more than 30 hours annually at the exterior of those residences.
  • Lighting: Thresher must diligently pursue approval of a light-mitigation system for all towers, install an approved system as soon as possible after construction commencement, and operate it as continuously as possible after commercial operation.

Which residences qualify: “Occupied Residence” means a residence occupied as of September 16, 2025. “Non-Participating Land” means Seward County land for which, as of the CUP’s effective date, no owner of the fee-title surface estate has entered a contractual agreement with or for Thresher’s benefit. Those definitions determine where the stated protections apply. The administrator waiver authority and landowner enforcement-waiver provision also affect how the conditions are enforced. Setbacks, sound, and flicker — p. 5 · Lighting and enforcement waiver — p. 6.

The draft assigns specified road and liability responsibilities but does not quantify the remaining effects on property values, service costs, or individual households. Turbine height describes the project’s scale, not the dollar value of those effects.

The economic question: how do the county’s receipts and private benefits compare with the costs borne by the county, neighboring owners, and other residents? The payment illustrations answer part of that question; the reviewed documents do not supply a complete valuation of those benefits and costs.

Thresher’s payment obligations and the limits of county protections

“Proposed CUP” means the October 28, 2026 conditional use permit packet, including Exhibit D’s minimum terms for the three future agreements.

Open the explanations below for conditions, exceptions, and links to the CUP wording.

Selected payment and protection terms in the proposed CUP
SubjectProposed obligation or remedyLimits and conditionsTaxpayer significance
Initial county paymentPay $287,000 within 45 days after the CUP’s effective date. CUP § II.1.a.A one-time payment, subject to § II.2’s approved-invoice and payment-instructions conditions; separate from annual contributions and later legal-cost reimbursements.Offsets county costs and impacts once due; the fixed amount does not track the county’s eventual total costs.
Annual contributionMake ten annual payments beginning in the commercial-operation year, based on installed capacity and a minimum rate of $3,940/MW for 2028, increasing 3% annually before deductions. Contribution terms.The reduction clause applies broadly to payments under the agreement. The years 11–20 make-up obligation has priority over conflicting terms and ends after year 20. Extended exemption has a separate payment rule. Later-year terms.Provides revenue whose amount changes with capacity and deductions. No annual contribution is due before COD. After year 20, county tax revenue can fall below the benchmark without a make-up payment under § 2. Timing examples · Deduction effects.
Permitting legal costsReimburse 50% of specified permitting legal costs above $287,000, and 100% of specified covered-claim and enforcement legal costs. CUP § II.1.b–d.The county retains its share of the 50% category. Eligibility, itemized invoices, good-faith disputes, and special timing conditions limit reimbursement. Details.Leaves half of the specified excess permitting legal costs with the county, plus excluded expenses. Payment conditions and disputes affect county cash flow.
Defense and covered claimsDefend and indemnify the county for listed claims, including property-owner challenges to the legality of County Permitting and claims arising from Thresher’s permitting breaches, legal violations, or negligence. CUP § II.3.Excludes county negligence, willful misconduct, or legal violations to the extent finally determined by a court. Separate county co-counsel is at county expense while Thresher properly controls the defense. Details and property-owner examples.Transfers covered claim costs to Thresher. The county retains excluded liability and specified separate-counsel costs; recovery depends on coverage and collection.
Enforcement and collectionProvide county remedies for default, including damages, specified self-help reimbursement, and reasonable enforcement costs. CUP § II.12.Notice, cure periods, and cost-recovery conditions apply. Exhibit D contains different dispute and remedy procedures. Details.Provides ways to seek performance and recovery, with procedures that can require county time and expense before payment arrives.
Project road damageRestore covered roads; reimburse specified emergency repairs; provide at least $2 million through a bond, parent guarantee, or letter of credit before “Construction Activities on the Roads.” Maintain at least $7 million in aggregate liability insurance during construction. Road terms.Security release requires certification of commercial operation, payment of incurred road obligations, and no outstanding county payment claims, approved by the Road and Bridge Director. Claim terms remain for negotiation. Security and insurance details.Places covered repair costs on Thresher. The $2 million is security, not a stated repair-cost cap. Disputed costs determined due by the BOCC must be paid within ten days. Dispute terms.
Ongoing project insuranceMaintain the liability insurance described in Exhibit C under § I.2.s. The certificate lists $1 million per occurrence and a $2 million general aggregate. CUP requirement · Certificate.The maintenance obligation is separate from construction-period road coverage. A certificate is not the policy and does not itself confer rights on the county.Requires continuing coverage. The certificate alone grants the county no policy rights; the road terms separately require additional-insured status during construction. Details.
Removal and restorationEstablish a bank fund with the county and bank named in its documentation; fund estimated removal costs less estimated salvage before construction on each property. Restoration terms.Estimates reset every seven years. A county objection within 60 days leads to an independent engineer paid by Thresher. County access follows the agreement’s default and cure terms. Details.The fund supports cleanup; its balance is not a stated cap on Thresher’s duty. Salvage deductions reduce the deposit, including the draft’s addition of county recovery costs to the salvage deduction. Actual sufficiency depends on costs and recoveries.
Ownership changesAssign CUP obligations before and after a transfer to the respective parties; a partial assignee takes only the assigned obligations. CUP § II.6.Affiliate transfers and qualifying credit-rated transfers can proceed on notice. Other unaffiliated transfers require county consent, which cannot be unreasonably withheld, conditioned, or delayed.Places post-transfer CUP duties on the successor for the assigned portion. The original developer’s resources are not a continuing guarantee of the successor’s performance.

Source: proposed CUP, PDF pp. 11–16 and 65–75. The table reports the reviewed obligations and their taxpayer implications. The linked source index quotes the provisions. Actual losses, insurance recoveries, and funding adequacy depend on costs and instruments beyond the stated requirements.

Conditions behind the overview

Cost-sharing: which county expenses does Thresher pay?
  • Initial payment: § II.1.a requires $287,000 within 45 days after the CUP’s effective date. Section II.2 also requires an approved invoice and payment instructions. This is separate from the annual contribution; the reimbursement invoice timetable below should not be substituted for the initial-payment trigger.
  • 50% reimbursement: § II.1.b covers 50% of county attorney’s fees and costs above $287,000 related to “County Permitting,” except where the specified 100% provisions apply.
  • 100% reimbursement: § II.1.c covers reasonable attorney’s fees and costs incurred after the effective date under § II.3.a (covered claims) or § II.12.q (specified dispute and enforcement costs), subject to those provisions’ limits.
  • Documentation and scope: § II.1.d limits reimbursement to qualifying attorney’s fees and costs directly attributable to the project. It requires itemized invoices, names, rates, dates, time entries, and no block billing. The wording also refers to out-of-pocket costs incurred and paid by the county.
  • Timing and disputes: payment is generally due 45 days after Thresher receives an invoice, unless reasonably disputed in good faith. For the 50% category, payment is not due sooner than 90 days after the county delivers proposed versions of all three agreements after the effective date, or if the county is in violation or CUP Default of § I.3.b.

Taxpayer effect: the county retains its share of eligible costs and expenses outside the reimbursement language. Disputed invoices also require time and money to resolve, delaying recovery.

Indemnity: which claims and defense costs are covered?

Indemnity here means Thresher’s obligation to defend the county and bear covered claims, losses, liabilities, and reasonable legal costs. Section II.3.a lists six categories, including Thresher’s permitting breaches, specified violations or misconduct, certain property-description and notice information, certain Thresher challenges, and third-party challenges to County Permitting.

Will Thresher pay for the county’s legal defense if a property owner sues? Yes, when the suit brings a covered claim against the county. For example, if an owner sues Seward County challenging the legality of its project approval, § II.3.a.vi requires Thresher to defend the county and bear covered legal costs. This is a defense obligation, not merely a promise to pay a judgment after the county loses. Naming the county as a defendant does not by itself trigger coverage; the claim must fall within one of the listed categories.

Who hires and pays the lawyers? Thresher has the right to provide and control the county’s defense, using counsel reasonably satisfactory to the county and meeting the conditions below. While it properly provides that defense, the county pays for any separate co-counsel it chooses to retain. If the county incurs covered reasonable legal fees itself, § II.1.c provides 100% reimbursement, subject to the invoice, dispute, and coverage terms; that is not a promise to pay every county legal bill or the expressly excluded separate co-counsel expense.

  • Property-owner challenges to the permit: a property owner suing the county is a third party. Section II.3.a.vi covers claims against the county related to the validity, enforceability, or legality of County Permitting. This includes a property owner’s challenge to the legality of the county’s project approval, subject to the county-fault exclusion below.
  • Property-owner damage claims: §§ II.3.a.i–iii cover claims against the county arising from or related to Thresher’s permitting failures or breaches, specified violations of law, or negligence or willful misconduct. A property owner’s damage claim tied to those grounds falls within the listed coverage. The clause does not make every claimed loss of property value, noise impact, or other project effect a covered claim merely because the claimant owns property in or near the project.
  • Property descriptions and notice information: § II.3.a.iv also covers claims concerning the accuracy of specified property and ownership information supplied by Thresher or its selected vendor and relied on solely by the county, including information for properties entitled to written notice.
  • Who controls the defense: for covered third-party claims, Thresher may assume the defense with counsel reasonably satisfactory to the county if it meets the notice, actual-conflict, and diligent-defense conditions.
  • Separate county counsel: while Thresher properly conducts that defense, the county may retain separate co-counsel, but the CUP puts that expense solely on the county without reimbursement.
  • County-fault exclusion: § II.3.b excludes coverage to the extent a claim arises from county negligence, willful misconduct, or violation of law, solely to the extent finally determined by a court. An allegation of county fault is not itself that final determination.
  • County insurance: for the information-accuracy claims identified in § II.3.a.iv, the CUP states that the county has specified insurance of at least $500,000 as of the effective date, requires it to maintain that coverage before commercial operation, and requires timely pursuit of available coverage. The stated obligation concerns these specified claims.

County insurance expense: § II.3.b states that the county already carries the specified coverage and requires it to maintain that coverage, or comparable replacement coverage, before COD. Maintaining coverage is a county obligation. The draft identifies no additional premium and contains no express provision specifically reimbursing county insurance premiums. The $287,000 initial payment addresses county costs broadly. Any incremental insurance expense depends on the county’s existing policy and the cost of satisfying the requirement.

Taxpayer effect: Thresher must defend the county and bear covered losses, including covered claims brought by property owners. The provision protects the county; it does not promise compensation to every affected property owner. Exclusions and specified separate-counsel expenses remain with the county, and a coverage or payment dispute can delay recovery.

Enforcement: how would the county require performance or collect money?
  • Notice and time to correct a default: § II.12 generally requires written notice and an opportunity to cure. Undisputed monetary claims have a 45-day period measured from the later specified trigger; other defaults follow different rules. Section II.12.c excludes a cure period for certain failures to satisfy pre-construction or pre-COD conditions, subject to the administrator provision stated there.
  • Available remedies: the CUP lists fines, actual damages, county performance of certain unfulfilled obligations (“self-help”), suspension, and revocation or termination subject to the stated requirements. It also provides specified reasonable dispute/enforcement costs and 15% annual interest on overdue amounts.
  • Cost recovery: § II.12.q is subject to § II.3 and the invoice and reimbursement requirements in § II.1.
  • The agreement procedures differ: contribution terms call for notice and negotiation; removal terms call for negotiation and mediation before formal court action, with mediator fees split equally and each party bearing its other mediation costs.
  • Disputed road costs: road § 15 calls for written notice and a good-faith meeting about a disputed charge. The BOCC then determines the dispute after giving Thresher a reasonable opportunity to present its reasons. Thresher must pay an amount the BOCC determines is due within ten days. Road § 16 separately provides notice, a reasonable opportunity to cure, and court remedies. Road cost disputes, pp. 74–75.
  • Different court remedies: the CUP describes cumulative remedies. The road terms instead specify court orders requiring performance or preventing a breach as the exclusive remedies. Both sets of terms and the packet’s conflict rules must be considered when interpreting a road dispute. Exhibit D’s general attorney-fee provision expressly yields to CUP §§ II.1–3 when they conflict.

Taxpayer effect: the county must administer the applicable notice, cure, and recovery procedures and commit resources during a dispute. Residents are not given enforcement rights under the CUP itself; that is distinct from any rights they may have outside it.

Roads and cleanup: what money would actually be available?

Road repair and security

Thresher must restore covered roads at its expense, with specified emergency-repair reimbursement within 30 days of an itemized invoice. Before “Construction Activities on the Roads,” it must provide a performance/payment bond, parent guarantee, or letter of credit of at least $2 million. This is security for performance and payment, not a stated cap on repair responsibility. The road terms cover use of existing roads during construction, reconstruction, and decommissioning (§ 5).

The security remains until all release conditions are met. Thresher must certify that the project is commercially operational, all obligations incurred under the road agreement have been paid, and the county has no outstanding payment or reimbursement claims under it. The Road and Bridge Director must approve that certification; approval cannot be unreasonably withheld, conditioned, or delayed. Other security terms and the process for making claims remain for negotiation. Security and release conditions, p. 74.

The road terms also require construction-period commercial general liability insurance of at least $7 million in the aggregate, naming the county and consultant as additional insureds. That coverage is separate from the $2 million financial backing. An insurance limit is the stated coverage ceiling, not a cash deposit available for every road expense.

Road-review expenses: Exhibit D’s road § 1.r requires reimbursement of reasonable out-of-pocket county expenses, including pre- and post-construction inventories and consultant engineering costs. A negotiated maximum allowance may not be less than $175,000 in aggregate, plus $10,000 a month if construction exceeds 12 months. This is an expense-reimbursement provision, not an unconditional extra $175,000 contribution. Road reimbursement terms, p. 71.

Separate ongoing insurance requirement: CUP § I.2.s requires Thresher to maintain the liability insurance described in Exhibit C during the CUP term. The certificate lists $1 million per occurrence and a $2 million general aggregate for July 1, 2026–July 1, 2027. The certificate covers that policy period; the CUP’s maintenance obligation continues beyond it. It expressly confers no rights on the certificate holder; naming the county as certificate holder does not establish additional-insured status. Maintenance requirement, p. 6 · Insurance certificate, p. 64.

Removal, restoration, and access to the fund

Exhibit D requires a restoration fund at a federally chartered bank, with the county and bank named as parties in its documentation. Thresher must contribute estimated removal costs less estimated salvage before construction on each project property. Estimates reset every seven years. The dollar amount depends on those estimates rather than a fixed deposit stated in the packet.

The county can challenge the amount. It has 60 days to object to the net restoration amount determined by Thresher. A timely objection leads to a mutually selected independent engineer with suitable wind-industry experience, who determines the amount. Thresher pays the engineer’s fees. Fund and estimate-review terms, pp. 68–69.

County access follows a default. The decommissioning terms define default as failure to begin or resume satisfying the removal obligations within 60 days after written county notice. They allow additional cure time when completion cannot reasonably occur within 60 days and Thresher diligently pursues the cure, subject to the stated force-majeure delays. The county may draw on the fund following an Event of Default. Force majeure does not excuse or delay payment obligations, including financial security. Default and force-majeure terms, pp. 67–69.

The fund supports the cleanup duty; its balance is not a stated limit on that duty. After Thresher supplies documentation acceptable to the county showing that it has fulfilled its decommissioning obligations, the county must issue a Certificate of Completion. The decommissioning agreement ends when Thresher receives that certificate. Completion and release, p. 68.

The written calculation reduces the deposit for county recovery costs. The clause says to increase estimated salvage by certain county costs of obtaining the salvage proceeds, then subtracts estimated salvage when calculating the fund. As written, a larger recovery-cost allowance produces a smaller deposit, all other inputs unchanged. That reduces the money placed in the fund before those recovery costs arise. Restoration-fund calculation, p. 68.

Taxpayer exposure is tied to uncovered costs and collection. The draft assigns specified claims, repair work, and restoration duties to Thresher. County exposure remains for its retained share of costs, exclusions, and amounts it cannot recover. The draft supplies no probability or dollar estimate for future litigation or losses.

Reimbursement delays can still strain county cash and staff time, even when the developer or insurer ultimately pays the cost.

What an unrecovered expense would mean

The documents reviewed do not support reliable estimates of future litigation or other costs. The examples below show how hypothetical unrecovered expenses compare with the contribution.

One-year comparison assuming the full $401,762 contribution is received
Hypothetical unrecovered county costAmount remaining
$0$401,762
$100,000$301,762
$250,000$151,762
$500,000−$98,238

These are scenarios, not forecasts or a worst-case estimate. A $250,000 unrecovered expense would absorb about 62% of the first annual contribution. The comparison covers one year and excludes other project receipts; it does not establish the project’s lifetime fiscal result.

What commitments and costs does this draft place on the county?

The draft provides for CUP approval first, followed by the road, decommissioning, and contribution agreements before defined construction begins. It does not make execution of all three agreements a condition for the CUP itself to take effect. County commitments would therefore begin before every agreement detail is settled. Read the agreement-sequence clause.

What does CUP approval commit the county to before the three agreements are signed?

The resolution identifies adoption as the CUP’s effective date. If adopted as written, it grants the conditional use permit subject to its requirements. Section I.3.b says the later agreements must be acceptable to both parties in their respective reasonable discretion, consistent with the corresponding Meade and Gray agreements, and include at least Exhibit D’s terms. Section II.14.a incorporates the exhibits into the CUP; § II.3.a.v expressly recognizes agreement terms included in the CUP while the separate agreements remain unexecuted. The later negotiations would therefore begin with terms already adopted. Resolution, PDF pp. 1–2 · Unexecuted-agreement terms, p. 12 · Incorporation of exhibits, p. 17.

What begins with CUP approval, and what depends on later events?
SubjectWhat the proposed CUP provides
Cooperation and later agreementsThe county and Thresher agree to cooperate in good faith and execute additional documents and acts necessary or appropriate to implement the CUP. The three agreements require later BOCC approval on the terms described above. § II.5, p. 13 · § I.3.b, p. 6.
County review and administrationThe county must review specified compliant submissions without unreasonable withholding, conditions, or delay. The CUP also establishes transfer-consent rules and dispute/default procedures for both parties. These provisions are not generally postponed until all three agreements are signed. § I.3.e, pp. 7–8 · § II.6 · § II.12.
County insuranceThe county represents that it has specified coverage as of the effective date and must maintain it before COD. The requirement does not wait for the other agreements. The draft specifies no additional premium. Insurance obligation and possible expense.
Construction and financial securityThe three agreements must be entered into before defined construction commencement, along with other required approvals and written county confirmation. Specified preliminary activities are excluded from that construction definition. Road security and restoration deposits have their own construction-related triggers; CUP approval alone does not establish that funds are available. § I.3.a–b, p. 6 · § I.3.e.viii, p. 8 · Funding terms.
Initial and annual paymentsThe $287,000 initial payment is tied to the CUP’s effective date and payment conditions, not execution of all three agreements. Annual contributions instead begin in the project’s COD year, subject to the capacity and deduction terms. Payment obligations and conditions.
50% legal-cost reimbursementAmong other conditions, this reimbursement is not due sooner than 90 days after the county delivers proposed versions of all three agreements after the effective date, or while the county is in violation or CUP Default of § I.3.b. Delivery of proposals is different from execution. § II.1.d, p. 11.
Prior Cimarron approvalsSection II.16 ties termination of the prior CUP and related approvals to approval of this CUP and all required agreements and permit approvals needed to start construction. It uses approval, rather than simply execution, as the condition. § II.16, p. 18.

County discretion under the draft: § I.3.b requires mutually acceptable terms, reasonable discretion, consistency with the corresponding Meade and Gray agreements, and at least Exhibit D’s minimum terms. Sections II.5 and II.11 require cooperation and preserve the stated legal limits on county authority. These provisions govern the county’s remaining approval decisions; the draft gives no express unrestricted right to abandon the agreement process. Disputes over those duties follow the CUP’s dispute provisions. § I.3.b, p. 6 · § II.5, p. 13 · § II.11, pp. 14–15.

If the parties do not reach the three required agreements: defined construction cannot proceed under the stated prerequisites. A delay in reaching those agreements does not itself cancel the CUP or the county’s commitments. Section II.5 also says the county need not incur expediting or other costs beyond personnel costs budgeted in the Commission’s discretion. County administration and costs, p. 13.

The CUP and development plan have separate construction deadlines

  • CUP: § II.10 provides for expiration if defined construction has not begun by the third anniversary of the CUP’s effective date, unless the BOCC agrees otherwise.
  • Development plan: the incorporated zoning excerpt, § 20-105, requires construction to begin within one year of Planning Commission approval. That commission may grant one one-year extension following a written request explaining the delay and expected start.

Exhibit B identifies the development plan as approved February 23, 2026, and requires updates for missing elements before specified site work. The three-year CUP deadline does not itself establish that development-plan approval remains valid for that entire period. Section II.10 says that if the development plan is voided for some or all of the property, construction and use must cease there while the CUP remains in effect, unless the BOCC agrees otherwise. Applying these rules to an actual start date requires the plan’s approval, extension, and amendment record.

Approval starts county commitments before construction and annual contribution revenue. Construction prerequisites, both approval deadlines, cooperation duties, reimbursement conditions, and default procedures govern that period.

What does the Good Neighbor Agreement mean for taxpayers?

It provides private compensation, not county revenue. Exhibit E is a proposed agreement between Thresher and a neighboring property owner. Before defined construction commencement, CUP § I.3.f requires Thresher to offer it to owners of occupied residences on nonparticipating land within one mile of a planned tower. Owners may decline or negotiate more favorable terms.

Payment: the form provides $500 annually, with no stated annual increase. The first payment is due within 60 days of the “Operations Date,” with later payments due on its anniversary. Payment requires a completed W-9. The form defines that date by first production of wind energy in commercial quantities.

What the owner accepts: the owner acknowledges the described construction impacts and agrees the compensation is adequate for them. The form states that its obligations run with the land, burden the property, and bind later owners and other successors. It allows Thresher to assign the agreement without the owner’s consent.

Duration and termination: the stated term is 50 years from the Operations Date. If operation ceases continuously for five years and Thresher and its successors have abandoned development or operation, the owner may request termination in writing. Thresher must deliver the termination and quitclaim in recordable form within 45 days of that request.

These are private payments and property commitments, separate from county revenue. The payment schedule is in Exhibit E’s own Exhibit B, which is separate from the CUP’s development-plan Exhibit B. The neighbor agreement’s Operations Date is also separate from the county-contribution definition issue described under payment timing.

Who may interpret or waive CUP conditions?

Administrative discretion is a central concern: § II.14.j delegates broad waiver authority to either administrator, subject to the draft’s specific decision requirements and applicable legal limits. The reviewed packet contains no general requirement for a BOCC vote before material taxpayer protections are waived. Read the findings on waiver authority and stated boundaries.

Landowner waivers: § I.2.u says the county will not enforce a violation of a provision of § I.2 when Thresher supplies sufficient documentation that all fee-title surface owners of the affected land have permanently and fully waived the right to county enforcement of that violation. Although placed under “Local Contractors,” the wording refers to § I.2 as a whole. The text therefore reaches the conditions in § I.2, not only the local-contractor provision. Its stated effect is to stop county enforcement of the documented violation for the affected land; it is not a waiver of every countywide obligation. Landowner-waiver wording, p. 6.

  1. Administrative waiver authority: the reviewed draft grants broad waiver authority and does not reserve waiver of material taxpayer protections as a category to the BOCC. A valid waiver reduces what the county requires to the extent covered by it. Authority and stated boundaries.
  2. Costs retained by the county: these include its half of the specified excess permitting legal costs, excluded claims and expenses, and separate co-counsel when Thresher properly controls a covered defense. Reimbursement conditions also create a period in which the county has incurred costs before it receives payment. Cost-sharing · Indemnity and exclusions.
  3. Financial backing: the road terms require at least $2 million in specified security before construction activities on the roads. Restoration funding is based on estimated removal costs less estimated salvage, with an independent-engineer process for a timely county objection. The security and fund support Thresher’s duties; their amounts are not stated caps on repair or cleanup obligations. Sufficiency depends on actual costs and recoveries. Funding and access terms.
  4. Changes over time: the contribution rate rises 3% each calendar year, restoration estimates reset every seven years, and road security can be released after the stated certification and approval. CUP transfer terms assign obligations before and after transfer to the respective parties; a partial successor takes only the assigned duties. Section II.6 allocates CUP duties but does not itself specify continuation of each separate guarantee, insurance policy, or bank arrangement after transfer. These mechanisms affect the amount and source of protection at different project stages. Inflation comparison · Transfer terms.
  5. Meade and Gray references: § I.3.b requires consistency with corresponding agreements for this project, and Exhibit D supplies a higher-payment matching provision. The reviewed packet does not attach those county agreements or identify their controlling versions. The matching clause also contains the inconsistent references described above. Matching-payment terms.

The taxpayer assessment turns on receipts, retained costs, and enforceable protection. The draft provides payments, cost-sharing, financial backing, and remedies. It also leaves the county with specified expenses and depends on collection when obligations come due. The unresolved economic question is whether the receipts and resident benefits outweigh those costs and exposures; the documents provide no complete dollar comparison.

Sources, assumptions, and limits

  1. October 28, 2026 proposed CUP. Browse the CUP topic index and source excerpts · Open the reviewed 78-page PDF · County source. The index links to quoted provisions and original PDF pages. The terms are proposals, not evidence of executed agreements or deposited funds.
  2. Adopted Seward County 2027 budget, certificate page 1. Download the reviewed budget copy (PDF). County expenditure authority $36,672,382; ad valorem levy $11,507,727; assessed valuation $293,854,895 less stated TIF adjustment $3,230,852 = $290,624,043. Rural Fire is separate. County budget index.
  3. Mill calculation. Kansas Department of Revenue: property-tax formula. One mill is $1 per $1,000 of assessed value. Valuation, not market value, is the denominator.
  4. Historical inflation. Calculated from BLS annual-average CPI-U, U.S. city average, using 2015, 2020, and 2025 index values. Calculation and 2025 data note. Accessed October 30, 2026.
  5. Property-tax assessment and calculation. Kansas Department of Revenue: property classifications and assessment percentages and property-tax formula. Residential: 11.5%; commercial/industrial real property: 25%. Calculation assumptions. Accessed October 30, 2026.
  6. Median-home benchmark. U.S. Census Bureau QuickFacts, Seward County, Kansas: median value of owner-occupied housing units, 2020–2024, $136,500. This historical survey estimate is used as an illustrative appraisal, not a current county tax-roll median. Accessed October 30, 2026.
  7. Application and timeline. The county-posted Thresher CUP and development-plan application, PDF pp. 6–8, anticipates commercial operation in 2029 and states that the timeline is subject to change. This article uses 2029 as its main payment illustration, not as a guaranteed operating date.
  8. Referenced zoning regulations. County-posted 201-page zoning regulations, including § 1-104’s interpretation rules and the wind-facility provisions. Reviewed with the county-posted application and application form for COD and installed-capacity definitions. Findings and limits. Reviewed November 1, 2026.
Show the calculations

2029 rate = $3,940/MW × 1.03 = $4,058.20/MW. First annual contribution = 22 × 4.5 MW × $4,058.20/MW = $401,761.80 (approximately $401,762).

2029–2038 sum = $401,761.80 × [(1.03^10 − 1) ÷ 0.03] = $4,605,748.79. Average = $460,574.88 per year. Calculations retain full precision before rounding the displayed results.

One mill = $290,624,043 ÷ 1,000 = $290,624.043. Contribution equivalent = $401,761.80 ÷ $290,624.043 = approximately 1.382411 mills.

Budget share = $401,761.80 ÷ $36,672,382 × 100 = approximately 1.095543%. County levy share = $401,761.80 ÷ $11,507,727 × 100 = approximately 3.491235%.

The ten-year annual average equals about 1.58 mills on that same reference valuation. Two mills would equal about $581,248 per year. Different payment years, capacity, or assessed valuation would change the comparison. The future tax base is not forecast here.

View the budget certificate used for these comparisonsAdopted 2027 Seward County budget certificate. County totals: expenditure authority 36,672,382 dollars, property-tax levy 11,507,727 dollars, assessed valuation after TIF adjustment 290,624,043 dollars. Rural Fire is listed separately.

Scope of this assessment: the October 28 draft resolution, CUP conditions, incorporated exhibits, and cited supporting documents. Obligations are reported as written; economic examples are identified as calculations or scenarios. Actual funding instruments, full insurance policies, independent cost estimates, and quantified litigation probabilities are outside the reviewed record. Those evidence limits prevent a complete net-cost estimate; they do not change the requirements stated in the draft.

Original CUP document

The unchanged 78-page October 28, 2026 proposed CUP is included in this file, along with the article, topic excerpts, keyword search, and reviewed county budget.

Open the included CUP PDF · Save the CUP PDF · Search the CUP text

Open this HTML in a browser after downloading it. Opening or saving the included CUP PDF and using keyword search require JavaScript. PDF page links may open at the beginning in some viewers; the page numbers are also shown beside the links.

← Return to the single-page guide

Thresher CUP: topic index and source wording

October 28, 2026 proposed conditional use permit packet · 78 PDF pages · Reference companion prepared October 30, 2026.

These are source excerpts, not the article’s interpretation. Quoted wording is extracted from the reviewed PDF. Page headers and footers are omitted from the topic excerpts, and whitespace is normalized; apparent drafting errors are not corrected. PDF extraction can affect spacing and reading order. Use the original PDF to confirm wording and layout.

Open the full reviewed PDF · County source. Page numbers below refer to the 78-page PDF sequence, not an exhibit’s internal numbering. Some PDF viewers may open at the beginning; enter the stated page number if needed.

Quoted provisions

Select a heading to expand the wording. Links from the article open the selected topic automatically when scripting is enabled.

Infrastructure included in the Seward CUP CUP § I.1

Source wording · PDF page 4

1. Description of the CUP Real Property; Project; Use.

a. Real Property : This CUP regards the real property that is described in Appendix A to the Development Plan (“Property”), a visual aid of which Property is in Appendix F to the Development Plan, but Development Plan Appendix A controls over any conflict with Development Plan Appendix F as to Property description . No other real property is granted or allowed rights or uses pursuant to this CUP.

b. Project and Project Property: The “Project” means the Property, and the following improvements and infrastructure and uses as might be located on or under said Property : the proposed construction of the CWECS includes twenty-two wind turbines , gravel access roads, and underground collection lines. No other infrastructure is included within this CUP.

c. Use: The CUP permitted use is limited to a CWECS, as defined in the Zoning Regulations and as further defined and limited by the terms of the County Permitting.

d. Improvements and Infrastructure . No other improvements or infrastructure or use is allowed , permitted or included pursuant to this CUP. Only to the extent and as set forth in the Zoning Regulations, to the extent any Project specifics (including without limitation described by type, technology, materials, color, dimensions, location, other appearance, or potential negative impact to property or persons beyond the Property boundaries) are not permitted as set forth in the County Permitting or are not expressly included in the Application, any such Project development remains subject to County approval.

Read surrounding text: Page 4 text. Return to the obligations table.

Missing development-plan elements and required further review Exhibit B — Development Plan introduction

Source wording · PDF page 46

This document constitutes the entire Thresher Wind Project Development Plan text approved by the Planning Commission, meaning no other DP rights, terms, or changes, are approved by the Planning Commission at this time. All DP rights and terms remain subject to all other applicable Seward County Zoning Regulations, as well as applicable federal and state laws and regulations (collectively, “Laws”). If any conflict between any Law or this DP or the CUP relying on this DP, the most favorable to the County or most restrictive to Thresher will apply. The DP assumes the Application accuracy and completeness of all required information without any independent verification by Seward County, and the County may elect in its sole discretion to void any pertinent term of this DP that in part was based on any inaccurate or incomplete portion of the Application. Because several required DP elements are missing from the Application, the DP must be updated pursuant to Regulation 20-105 before any improvement or other site work or grading of land included in this DP may occur, which DP updates are subject to Planning Commission approval (the updates are not minor adjustments subject only to Zoning Administrator review).

Read surrounding text: Page 46 text. Return to the obligations table.

Utilities and private collection lines Exhibit B — Development Plan § 20-103.2.h

Source wording · PDF page 48

h. Location of all existing and proposed utilities (sanitary sewage systems water systems, storm drainage systems, gas lines, telephone lines and electrical power lines); Thresher Response: Appendix F. No proposed utilities included in the Application, so the DP does not grant any rights to construct utilities. Utilities are not interpreted to include the Project’s private collection lines that only connect turbines to substations. Note that collection lines within public land, roads or ROW are regulated elsewhere in this DP or its related CUP.

Read surrounding text: Page 48 text. Return to the obligations table.

Substations, turbine dimensions, and missing transmission information Exhibit B — Development Plan, additional requirements 3–4

Source wording · PDF page 50 · PDF page 51

3. Location of all existing buildings, structures, homes within 1/2 mile of the project boundary, electrical transmission lines and facilities, and utilities, utility easements, underground pipelines and underground utilities within the project boundary; property lines for each property under separate ownership included within the proposed CWECS or CSECS boundaries with key identifying each owner; location of all collectors, turbines, substations connecting power lines and other structures to be used as part of the operation. Thresher Response: Appendix F. Appendix F does not include any substations or other structures to be used as part of the operation beyond wind turbines and underground collection lines, so no other wind project or operation improvements are included in this DP.

4. For CWECS provide information detailing the type, size, maximum and minimum height, rotor size, rotor material, color, rated power output, performance, safety and noise characteristics of each proposed wind turbine model, tower, and electrical transmission equipment. Provide tower/turbine details that assure the tower shall not be lattice/type or other design that provide perches. Thresher Response: Section 1.4, Appendix F (Application typo on page 5 says “G” instead of “F”). Pertinent Text from Application: “Turbine Specifications: While a wind turbine model has not been definitively selected for the project, approximate specifications are as follows: Type: Steel tube Size: o Maximum Height: 185.5 m / 609ft o Minimum Height: 185.5 m / 609ft o Rotor Diameter: 163m / 535ft o Rotor Material: Fiberglass and structural elements o Hub Height: 104m / 341ft o Total Height (Ground to Tip): 185.5m / 609ft Color: White or off-white Rated Power Output: 4,500 kW Ground Clearance: 22.5m / 73ft Performance: Outstanding performance as a leader in wind turbine manufacturing Safety: Aerodynamic braking through full blade feathering with 3 pitch cylinders Noise: Low noise blade design. Primary Turbine Sites: 22 in Seward County” The above turbine specifications are approved and incorporated into the DP. No changes to these specifications are approved or incorporated info the DP. No electrical transmission equipment information was provided in the Application other than proposed routes of underground collection lines in Appendix F, so the DP requires the missing electrical transmission equipment information to be identified as part of any application to construct any improvement or other site work or grading of land included in this DP.

Read surrounding text: Page 50 text · Page 51 text. Return to the obligations table.

Tax-related payment reductions and years 11–20 protection Exhibit D — Contribution Agreement Minimum Terms, § 2

Source wording · PDF page 65 · PDF page 66

2. Annual Payment Exceptions, Reduction . If any tax is imposed on Thresher by the State of Kansas any of its governmental subdivisions, the amount of the payments due under this Agreement shall be reduced by the amount of tax imposed: (a) real or personal property tax due with respect to property located in Kansas, owned by Thresher Wind and associated with the operation of the facility; (b) any amount of Kansas sales or use tax due with respect to (i) property purchased for use in either the construction or enlargement of the facility or (ii) any purchase of machinery and/or equipment used either (x) as an integral or essential part of the integrated production operations of the facility or (y) for the handling, movement or storage of the output of the facility; (c) any Kansas state or local (other than Kansas income tax, the Kansas franchise tax or the Kansas sales and use tax) is imposed on the income, operations or property of the facility; (d) the Kansas statutes (or the regulations thereunder) are amended after the date of this Agreement so as to reduce the tax benefits available to Thresher Wind and/or the facility under K.S.A. 79 -32,160a; K.S.A. 74 -50,132; K.S.A. 79 -3606(cc); K.S.A. 74 -50,115; K.S.A. 79 -3606(kk); K.S.A. 79 -3606(fff) or K.S.A. 79 -201 (Eleventh); or (e) any mortgage registration tax. Notwithstanding any other provision herein, if in any one year between years 11 and 20 of the Project’s operation the amount of taxes levied for Seward County (excluding taxes levied for USD 483 and any other taxing entity) related to the Project are less than the amounts provided for in this Agreement, Thresher Wind shall pay to Seward County the difference between the amounts provided for in this Agreement and the amount of taxes levied for Seward County. This provision is contingent upon the Project being in operation

Read surrounding text: Page 65 text · Page 66 text. Return to the obligations table.

No obligation to pursue or complete the project CUP § I.2.a

Source wording · PDF page 4

a. No Development Obligation. Thresher will appropriately and responsibly construct and operate as an approved CWECS. But, this CUP does not create any obligation or promise of Thresher to pursue or complete any portion of the Project.

Read surrounding text: Page 4 text. Return to the obligations table.

Cost-sharing and reimbursement CUP § II.1

Source wording · PDF page 11

1. Payments Due to County. Because the benefits to the County will be reduced if Thresher does not develop and operate the entire contemplated Project for its contemplated useful life, and due to the unique nature and potential impacts of the Project, considerable County resources have been expended and might further be expended unique to County resources involved regarding historically typical land uses or use proposals within the County, i ncluding without limitation, creating, implementing and monitoring County Permitting of the Project, additional County personnel time or education involved, and outsourcing some County roles; Thresher shall pay the County:

a. Initial Payment. $287,000, due within 45 days after the Effective Date. b. 50% Reimbursements. Except as provided below in CUP §§ II.1.c. and d., reimbursement of 50% of County’s attorney’s fees and costs in excess of $287,000 and related to the County Permitting. c. 100 % Reimbursements. Reimbursement of 100% of County’s reasonable attorney’s fees and costs incurred after the Effective Date pursuant to CUP §§ II.3.a or II.12.q.

d. Reimbursement Requirements. For reimbursement of attorney’s fees and costs under CUP §§ II.1.b. and c., payments are due to County 45 days after Thresher’s receipt of an invoice (which may be delivered via email), unless the amount is disputed in good faith that Thresher reasonably believes to be excessive, unreasonable, duplicative, incorrectly billed, inadequately documented, or not reimbursable under this Agreement , including by providing County with the clear and specific reason for the dispute and Thresher’s calculation of the proper invoice amount. The parties shall work in good faith to resolve any disputed amounts documented, and out -of-pocket costs incurred and paid by the County. Reimbursable costs shall be limited to fees and costs that are attorney’s fees and costs in connection with the review, processing, negotiation, including but not limited to issuance, administration, or enforcement of County Permitting, and directly attributable to the Project and would not have been incurred but for the Project. Thresher shall have no obligation to reimburse any cost unless the County provides a copy of the applicable invoice containing the following information or restrictions: (i) the name of each attorney or professional providing services and such person’s hourly rate; (ii) An itemized invoice with time entries describing the work performed, the date of service, and the time expended for each task. To the extent the County claims any information is exempt from disclosure under the Kansas Open Records Act, the invoice shall identify the basis for such claim and provide sufficient information for Thresher to evaluate the charge; and (iii) Block Billing shall not be permitted. But, no payment pursuant to CUP § II.1.b. is due for fees or costs (iii) sooner than 90 days after County delivers after the Effective Date its proposed versions of all three County Agreements, or (iv) if County is in violation or CUP Default of CUP § I.3.b.

Read surrounding text: Page 11 text. Return to the obligations table.

Indemnity, defense control, exclusions, and county insurance CUP § II.3

Source wording · PDF page 11 · PDF page 12 · PDF page 13

3. Claims and Indemnification.

a. Thresher Indemnification of County. Thresher shall indemnify, defend, and hold the County harmless from and against any and all Disputes, losses, damages, liabilities, judgments, awards and costs (including reasonable attorney’s fees and costs) (each a “Claim”) incurred by or sought against the County, to the extent any Claim arises out of or is related to any:

i. Thresher Failure, Default or Breach. F ailure, default, or breach by Thresher of any County Permitting;

ii. Thresher Violation of Law. Violation of applicable law by Thresher or its employees , contractors or agents;

iii. Thresher Conduct. Negligence or willful misconduct by Thresher or its employees or agents; or

iv. Accuracy. Accuracy of information for the legal descriptions of the involved real property and parties with interests in said real property, both the real property subject to this CUP and also real property and parties for which written notice was required ; which information was received from or on behalf of Thresher and County relied solely on Thresher and its selected vendor; or

v. Thresher Dispute or Claim. Thresher Dispute or Claim brought against the County in any way related to the validity, enforceability, or legality of any County Permitting documents or rights (for avoidance of doubt including without limitation County Agreement terms included in the CUP despite that County Agreements are not executed), for which Thresher had actual knowledge of and a reasonable opportunity to investigate, verify, and notify the County of on or before the Effective Date; or

vi. Third-party Dispute or Claim. Third-party Dispute or Claim brought against the County in any way related to the validity, enforceability, or legality of County Permitting. This paragraph pertains only to third -party Claims: For third-party Claims under CUP §II.3.a, Thresher will have the right to contest and assume the defense of the County against any Claim with counsel of its choice reasonably satisfactory to the County so long as (A) Thresher notifies the County in writing within thirty (30) days after the County has given a Claim notice (or by such earlier date as may be necessary under applicable procedural rules in order to file a timely appearance and response or other required pleading) of its intent to conduct such defense, (B) the County has not been advised by counsel that an actual conflict exists between the County and Thresher in connection with the defense of the third party Claim (other than any conflict or potential conflict resulting solely from Thresher’s indemnification o bligations under this CUP), and (C) Thresher conducts the defense of the third-party Claim diligently. So long as Thresher is conducting the defense of the third -party Claim in accordance with this paragraph, the County may retain separate co-counsel, at the County’s sole cost and expense (without reimbursement for such expenses, either pursuant to this CUP or otherwise), and participate in the defense of the third party Claim, it being understood, however, t hat Thresher shall control such defense.

b. No Obligation to Indemnify, Defend or Hold Harmless . Provided, however, that Thresher shall have no obligation to indemnify, defend, or hold harmless the County to the extent a Claim arises from the negligence, willful misconduct, or violation of law by the County solely to the extent finally determined by a court of competent jurisdiction . As of the Effective Date, the County represents and warrants to Thresher that it maintains general liability and errors and omissions insurance coverage that insures the County as to all Claims made or makeable under CUP §II.3.a.iv. above in the minimum amount of $500,000.00 (“County Insurance”), and County agrees to maintain the County Insurance (or comparable replacement insurance coverage in no less than the above-described amount and for the same above-described Claims) at all times prior to COD; and County shall file a claim for and pursue all available coverage under the County Insurance for such Claim in a t imely manner. County is not obligated to use County Insurance for any costs, liabilities, or Disputes regarding any Thresher obligations except as described herein.

Read surrounding text: Page 11 text · Page 12 text · Page 13 text. Return to the obligations table.

CUP default procedures and remedies CUP § II.12

Source wording · PDF page 15 · PDF page 16

12. Enforcement; Remedies. Except the County and Thresher; other persons, entities or groups, including, but not limited to, Seward County citizens, Project host landowners, other owners of real property, and Project opponents or proponents, have no rights under this CUP and do not possess enforcement rights in this CUP. Upon a Dispute related to this CUP, a “CUP Default” of County or of Thresher may be declared by the other, only after the other has:

a. Written Notice. Delivered written notice to the entity proposed to be in CUP Default, which notice shall specifically describe the Dispute , the pertinent cure period pursuant to this CUP , and the Dispute resolution(s) acceptable to the party delivering the notice, and

b. Cure Period. Waited the cure period and the Dispute is not fully resolved. The cure period after the notice effective date for a Dispute related to this CUP to avoid becoming a CUP Default is:

c. No Cure Period. There is no cure period for Thresher failure to complete with §I.3.e.viii. or §I.3.i. if such Default relating to §I.3.e.viii. or §I.3.i . is deemed valid by the Planning and Zoning Administrator.

d. Right to Void. 45 days if County claims a right to void a CUP term pursuant to CUP §II.15.

e. Risk of Material Harm. If County in good faith reasonably determines that the Dispute could put persons or property at risk of material harm, then the cure period for Developer to remove that risk of material harm will be a temporary cure period County reasonably determines in good faith and includes in the notice.

f. Monetary Claim. If County claims any monetary payment is due from Thresher that Thresher does not in good faith reasonably dispute , the cure period for Thresher to pay the amount in full is 45 days after the later of (i) the payment due date, and (ii) the date that County delivers Thresher with written notice of an invoice.

g. Other. Otherwise if the cure period is not governed by the above then the cure period is 45 days after the written notice effective date, unless the nature of the Dispute requires more than 45 to cure then the cure period is extended day -for-day past 45 days by the number of days that the Dispute could be fully resolved provided that the entit y commence cure within 10 days of the notice effective date and diligently good faith pursues the cure to completion.

h. No Cure Period Extension. As to any Thresher obligation to make a payment, the cure period is not extended for any force majeure or similar claim, including without limitation amounts owed to the County or to any third party for insurance or other monetary obligations. The County has discretion to extend the cure period if Thresher is diligently working in good faith pursuing the cure to completion. Upon a CUP Default by the County or Thresher, the other may pursue all remedies available pursuant to this CUP, at law and in equity for said CUP Default, which remedies are cumulative and not mutually exclusive. County’s remedies for Thresher CUP Default include without limitation:

i. Imposing Fines. Imposing fines established in any of the County Permitting or as County might otherwise reasonably establish,

j. Actual Damages. County’s actual damages,

k. Self Help. The County may, following written notice of a Thresher CUP Default and expiration of any applicable cure period, perform or cause to be performed any obligation that Thresher has failed to perform and that is reasonably necessary to protect public health, saf ety, or property (“Self-Help”). Thresher shall reimburse the County for the actual, reasonable, and documented third-party costs incurred in exercising such Self-Help remedy,

l. Costs of Self Help. County’s costs due to Self-Help remedy, shall be paid to County 45 days after the effective date of County written notice and invoice to Developer providing reasonable detail of the costs and damages, (e) suspend any Thresher right arising from the County Permitting,

m. Suspension of Proceedings. S uspend any proceedings or other efforts in process regarding or related to any County Permitting,

n. Suspension. Suspend the CUP permitted use and Project,

o. Revocation or Termination of CUP. R evoke or terminate the CUP provided that such process include any additional CUP revocation or termination requirements pursuant to the Regulations,

p. Revocation or Termination of County Permitting. Revocation or termination of any other County Permitting pursuant to the Regulations and other terms of the County Permitting, and

q. Reasonable Costs. Reasonable costs incurred related to the Dispute, CUP Default, cure or pursuing any remedy, including without limitation reasonable attorney’s fees and costs, subject to §II.3, and

r. Failure to Pay. F or Thresher’s failure to pay an amount when due pursuant to any County Permitting or an amount due because of a Thresher CUP Default, interest accruing at 15% per annum beginning on the day after the payment due date irrespective of when CUP Default occurs. Upon cure of any Thresher CUP Default the County in its sole discretion may require evidence of cure, or else the County may pursue such evidence at the cost of Thresher.

Read surrounding text: Page 15 text · Page 16 text. Return to the obligations table.

Thresher’s annual contribution, deductions, parity, and enforcement Exhibit D — Contribution Agreement Minimum Terms, §§ 1–4

Source wording · PDF page 65 · PDF page 66

1. Annual Payment. Thresher will provide an annual payment to the County Treasurer in December each calendar year beginning December of the calendar year in which the Project COD, which shall not be less than $3,940/MW of nameplate installed wind generating capacity if COD occurs in 2028, escalating at a rate of 3% compounding cumulatively each subsequent calendar year irrespective of whether COD occurs later than 2028, for a total of ten consecutive annual payments, and as illustrated below: Year December Payment 2029 $4,058/MW 2030 $4,180/MW 2031 $4,305/MW 2032 $4,434/MW 2033 $4,567/MW 2034 $4,704/MW 2035 $4,845/MW 2036 $4,991/MW 2037 $5,141/MW 2038 $5,295/MW In the event that after the execution date of this Agreement the Project becomes exempt from ad valorem property tax for years beyond year ten (10), Thresher shall continue making annual payments beginning in the amount of $5,295/MW of installed wind generating capacity if the Project commences commercial operation in 2028 or $5,454/MW of installed wind generating capacity if the Project commences commercial operation in 2029 and, in each case, escalating at a rate of 3% compounding cumulatively each subsequent calendar year, until the earlier of the date the Project is decommissioned and no longer in operation or the date that such ad valorem property tax exemption is terminated and the Project becomes subject to ad valorem property tax. In the event the Project becomes exempt from ad valorem property taxes for years beyond year ten (10) then payments shall be paid to the County Treasurer in December. The County may direct each Contribution to any taxing jurisdiction, general County fund, or specific fund or funds as may be directed by the County from time to time; provided, however, that the County hereby acknowledges and agrees that it is the County’s intent to distribute the Contributions hereunder in such a way as the County determines to be in the best interests of the residents of the County.

2. Annual Payment Exceptions, Reduction . If any tax is imposed on Thresher by the State of Kansas any of its governmental subdivisions, the amount of the payments due under this Agreement shall be reduced by the amount of tax imposed: (a) real or personal property tax due with respect to property located in Kansas, owned by Thresher Wind and associated with the operation of the facility; (b) any amount of Kansas sales or use tax due with respect to (i) property purchased for use in either the construction or enlargement of the facility or (ii) any purchase of machinery and/or equipment used either (x) as an integral or essential part of the integrated production operations of the facility or (y) for the handling, movement or storage of the output of the facility; (c) any Kansas state or local (other than Kansas income tax, the Kansas franchise tax or the Kansas sales and use tax) is imposed on the income, operations or property of the facility; (d) the Kansas statutes (or the regulations thereunder) are amended after the date of this Agreement so as to reduce the tax benefits available to Thresher Wind and/or the facility under K.S.A. 79 -32,160a; K.S.A. 74 -50,132; K.S.A. 79 -3606(cc); K.S.A. 74 -50,115; K.S.A. 79 -3606(kk); K.S.A. 79 -3606(fff) or K.S.A. 79 -201 (Eleventh); or (e) any mortgage registration tax. Notwithstanding any other provision herein, if in any one year between years 11 and 20 of the Project’s operation the amount of taxes levied for Seward County (excluding taxes levied for USD 483 and any other taxing entity) related to the Project are less than the amounts provided for in this Agreement, Thresher Wind shall pay to Seward County the difference between the amounts provided for in this Agreement and the amount of taxes levied for Seward County. This provision is contingent upon the Project being in operation

3. Parity with Meade and Gray County. If Thresher executes a Contribution Agreement or amends a Contribution Agreement with the Board of County commissioners of Meade County or Gray County, Kansas related to the construction of this Project where the annual, per -megawatt payment exceeds Annual Payment per -megawatt set forth in this Agreement, then the Parties hereby agree to amend this Agreement so that the payments set forth in Section 3 will match the annual, per -megawatt payment structure within the Contribution Agreement with Seward County, as applicable.

4. Enforcement. In the event of any dispute arising under this Agreement or claim of any breach or default under this Agreement, one Party will first send the other Party written notice of the claim or dispute. Within ten (10) days following the receipt of a written notice from either Party identifying such dispute or claim, the Parties shall meet, negotiate and attempt, in good faith, to resolve the dispute or claim quickly, informally and inexpensively. If the Parties are unable to resolve a dispute or claim arising here under within thirty (30) days of initiating such discussions, or within forty (40) days after notice of the dispute, either Party may seek any and all remedies available to it at law or in equity.

Read surrounding text: Page 65 text · Page 66 text. Return to the obligations table.

Road restoration, emergency repairs, financial backing, and remedies Exhibit D — Road Use Agreement Minimum Terms, §§ 8–16

Source wording · PDF page 73 · PDF page 74 · PDF page 75

8. Repairs and Restoration . Following the Post -Construction Inventory and evaluation of the damage, Thresher shall, at its sole expense, restore the Roads to a condition not less than the condition that existed as demonstrated by the Pre -Construction Inventory in accordance with the results of the Consultant’s Post-Construction Inventory.

9. Emergency Repairs . Thresher shall, as soon as reasonably possible and not later than 24 hours after becoming aware of any emergency or hazardous conditions on the Roads, notify the Consultant and Road and Bridge Director of any such conditions and, unless directed otherwise by Consultant or Road and Bridge Director, shall repair or restore such conditions at Thresher’s sole expense if such condition arises out of Thresher’s use of the Roads, with respect to whether such condition also results from deferred maintenance by the County during the course of Thresher’s use of the Roads. If any such condition is not corrected by Thresher within such 24 hours period after Thresher’s receipt of such notice, the County may cause emergency road and bridge repair to be performed by County personnel or qualified contractors, and Thresher shall, within 30 days following receipt of an itemized invoice for the costs of said repairs, reimburse the County for all reasonable repair costs, including overtime for County personnel, incurred by the County for said repairs.

10. Security Required . Prior to commencement of Construction Activities on the Roads, Thresher shall provide security to the County in the amount not less than $2,000,000 and in the form of a performance and payment bond, Parent Guaranty or letter of credit (the “Security”).

11. Costs. All costs and expenses of maintaining the Security, including the fees and expenses of the Security, and the costs and expenses of making distributions out of the Security, shall be borne by Thresher.

12. Term of the Security . The Security shall continue until the delivery by Thresher to the County of written notice certifying that the Project is commercially operational, that all obligations incurred by Thresher in the performance of this Agreement have been paid, and that the County has no outstanding claims for payments or reimbursements arising from this Agreement, and the Road and Bridge Director’s approval of such certification, which shall not be unreasonably withheld, conditioned or delayed.

13. Separate Agreement . All other terms and conditions concerning the Security, and the provisions for making claims against the Security, shall be negotiated in good faith between the County and Thresher.

14. Required Insurance . Thresher shall, upon CCD of the Project and for the period of construction of the Project, maintain in full force and effect, commercial general liability insurance naming Seward County and the Consultant as additional insureds in the aggregate amount not less than $7,000,000.00. 15 .Disputed Costs. In the event Thresher Wind challenges all or part of an amount invoiced or for which the County otherwise seeks reimbursement, Thresher Wind shall provide a written notice of any amount disputed and the basis for such dispute to the County. The County and Thresher Wind shall then meet and confer in good faith and in a reasonable manner to analyze, discuss and resolve the dispute. Thresher Wind shall not dispute any cost with respect to any activity with respect to the Thresher Wind project of which Threshe r Wind had knowledge at the time it was ongoing or included within this Agreement unless Thresher Wind immediately brought the dispute to the attention of the County and, unless directed by Road and Bridge Director otherwise, Thresher Wind suspended all construction activities to which the cost related. In the event Thresher Wind disputes its liability for any cost, such dispute shall be resolved by the Seward County Commission after providing Thresher Wind a reasonable opportunity to present the reasons for the dispute. Thresher Wind shall pay any disputed amount determined by the Seward County Board of Commissioners to be due within 10 days of such determination.

16. Remedies and Enforcement. The Parties acknowledge that money damages would not be an adequate remedy for any breach or threatened breach of this Agreement. Each of the Parties hereto covenant and agree that in the event of default of any of the terms, provisions or conditions of this Agreement by any Party (the “Defaulting Party”), which default is not caused by the Party seeking to enforce said provisions (the “Non -Defaulting Party”), and after notice and reasonable opportunity to cure has been provided to the Defaulting Party, then in such an event, the Non -Defaulting Party shall have the right to seek specific performance and/or injunctive relief to remedy or prevent any breach or threatened breach of this Agreement. The remedies of specific performance and/or injunctive relief shall be exclusive of any other remedy available at law or equity.

Read surrounding text: Page 73 text · Page 74 text · Page 75 text. Return to the obligations table.

Restoration fund, salvage calculation, and access after default Exhibit D — Decommissioning Agreement Minimum Terms, § 6

Source wording · PDF page 68 · PDF page 69

6. Decommissioning Restoration Fund . Upon commencement of construction of the Project , Thresher Wind shall establish a fund (“Restoration Fund”) at a federally chartered bank to secure Thresher Wind’s Decommissioning obligations, the documentation shall list the financial institution and County as parties. In the event of a Default, the County may use the Restoration Fund to take steps necessary to fulfill the defaulter’s obligations. Thresher Wind shall contribute the estimated cost of its Decommissioning obligations to the County prior to the start of construction for each of the properties in the Project, net of any estimated salvage value of Thresher Wind’s equipment, facilities and improvements located on each of the Project properties (“Net Restoration Amount”), but that estimated salvage value will be increased by any amount reasonably estimated that the County might incur during the time period until the Restoration Fund amount is re-set as part of the County actually receiving the salvage proceeds (examples include costs to pay off liens, to acquire ownership of the assets, and to m anage the salvaging and Decommissioning process) . T he Net Restoration Amount shall be re -set every seven (7) years after it is initially set, based on new estimates of the cost of removal and salvage value of Thresher Wind’s equipment, facilities and improvements located on the Project properties located within the County. The County shall have sixty (60) days to serve notice that it disagrees with the Net Restoration Amount determined by Thresher Wind. If the County serves such notice then the Parties will mutually agree on an independent engineer with suitable experience in the wind industry (the “Independent Engineer”) to determine the Net Restoration Amount. The fees of the Independent Engineer shall be paid by Thresher Wind. In the Event of Default, the County may draw upon or otherwise access the Restoration Fund to complete or cause to be completed the decommissioning.

Read surrounding text: Page 68 text · Page 69 text. Return to the obligations table.

Transfer of CUP rights and obligations CUP § II.6

Source wording · PDF page 13 · PDF page 14

6. Transferability. Thresher (or any of its successors or assigns) may wholly or partially assign the rights, obligations, and interests under this CUP to an affiliated entity upon written notice to the County. Upon such an assignment, the assignor party will be subject to the requirements of this CUP prior to the date of assignment or transfer and the assignee party will be subject to the requirements of this CUP after the assignment date. Thresher (or any of its successors or assigns) may wholly or partially assign the rights, obligations, and interests under this CUP to an unaffiliated entity i) with the written consent of the County, which shall not be unreasonably withheld, conditioned, or delayed or ii) upon notice to the County in the event the assignee entity holds a senior long term debt rating from Standard & Poor’s Rating Group, a division of McGraw Hill, Inc. (“Standard & Poor’s”), of at least BBB- (or its equivalent) or from Moody’s Investors Service, Inc. (“Moody’s”) of at least Baa 3 (or its equivalent). Upon Thresher ’s (and any of its successors or assigns) whole or partial assignment or transfer of this CUP, the assignor entity will be subject to the requirements of this CUP prior to the date of assignment or transfer and the assignee entity will be subject to requirements of this CUP after the assignment or transfer date. If Thresher (or any of its successors or assigns) partially assigns any of the rights, obligations, and/or interests under this CUP, then the assignee shall only be subject to the terms, conditions, and obligations relating to the portions of this CUP that are assigned and shall not be subject to any terms, conditions, and obligations that the assignor retained under this CUP, including any consequences for default(s) or violation(s) of obligations. Any attempted assignment in contravention of this provision shall be void ab initio.

Read surrounding text: Page 13 text · Page 14 text. Return to the obligations table.

Timing and terms of the three county agreements CUP § I.3.b

Source wording · PDF page 6

b. County Agreements . After obtaining the approved CUP and prior to CCD: Thresher and the BOCC (by simple majority vote approval) will enter into a Road Use and Maintenance Agreement, Decommissioning Agreement, and Contribution Agreement (collectively, “ County Agreements”), on terms acceptable to both parties in their respective reasonable discretion and consistent with the corresponding Meade and Gray County agreements for the Thresher Wind project, but County and Thresher already agree that the County Agreements will include at least the terms on attached Exhibit D.

Read surrounding text: Page 6 text. Return to the obligations table.

Decommissioning negotiation and mediation Exhibit D — Decommissioning Agreement Minimum Terms, § 7

Source wording · PDF page 69

7. Mediation; Enforcement. The Parties will attempt in good faith to resolve all disputes under this Agreement promptly by negotiation. If a dispute cannot be resolved within sixty (60) days of the dispute arising through direct negotiations of the Parties, either Party may initiate mediation as provided herein. Such dispute shall be submitted to any mutually agreeable mediator prior to proceeding with any formal court action. If the parties are unable to agree, the American Arbitration Association shall appoint a mediator. The media tion shall take place at a neutral site. All negotiations and mediation procedures shall be treated as and considered as compromise and settlement negotiations for the purpose of the Federal Rules of Evidence and state rules of evidence. The Parties shall equally split the cost of the mediator. For costs of mediation, other than the cost of the mediator, each Party shall bear its own costs.

Read surrounding text: Page 69 text. Return to the obligations table.

Attorney fees under the county agreements Exhibit D — All County Agreements Minimum Terms

Source wording · PDF page 75

CU2025-02 All County Agreements Minimum Terms Except as otherwise provided in CUP §II 1 -3 which terms control if any conflict with this paragraph: , Thresher Wind shall reimburse the County’s reasonable attorney fees in the event a formal court action is brought for the enforcement or defense of this Agreement: (1) because of a default or dispute between the Parties, and the County is the prevailing party; or (2) due to a third party claim, only to the extent such action arises directly from Thresher Wind’s breach of this Agreement or wrongful act or omissions.

Read surrounding text: Page 75 text. Return to the obligations table.

Separate agreement procedures

Exhibit D contains different procedures and fee provisions. Read them alongside CUP §§ II.1–3 and II.12, rather than assuming a single procedure applies to every dispute.

Search or browse the full PDF text

Search is literal and ignores capitalization. It searches extracted text, including attachments. Map results are flagged because their text is unreliable; opening one shows the map image. Scanned images, maps, and text split by PDF spacing may not match; a missing result does not establish that a provision is absent.

Browse maps: Page 56 · Page 57 · Page 58 · Page 59 · Page 60 · Page 61 · Page 62 · Page 63.

Browse all 78 pages - text and map images
PDF page 1

Open original PDF at page 1

DRAFT
Page 1 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
RESOLUTION NO. 2026-XX [NTD: County would assign if BOCC adopts] 
(CUP 2025-02 Thresher Wind -Wind Energy Conversion System) 
 
RESOLUTION OF THE BOARD OF SEWARD COUNTY COMMISSIONERS 
WHEREAS, the Board of Seward County Commissioners (“ BOCC”) of Seward County, Kansas 
(“County”) by the powers vested in it by adopted Seward County Zoning Regulations effective January 2008, and 
as amended January 2025, (“Zoning Regulations”); and 
WHEREAS, a conditional use permit was requested by Thresher Wind LLC (“ Thresher”), for the 
development, construction, and use of a  Commercial Wind Energy Conversion System (“CWECS”) as defined 
in the Zoning Regulations, which CWECS request is described in and limited to the Thresher Commercial Wind 
Energy Conversion System Permit Application dated September 16, 2025 including all its attachments  with a 
total of 91 pages (“Application”); and 
WHEREAS, pursuant to said Zoning Regulations in effect as of the Effective Date (certain pertinent parts 
are attached as Exhibit A), the BOCC has the authority to approve applications for County conditional use permits; 
and 
WHEREAS, a public hearing was held on the Application by the Seward County Planning Commission 
(“Planning Commission”) beginning on December 8, 2025, and continued through and including February 23, 
2026, after due notice in accordance with the Zoning Regulations; and  
WHEREAS, as a result of said public hearing, the Planning Commission recommended approval of a 
conditional use permit, with conditions, and as provided in § 20-103 and § 27-104.8(C) of the Zoning Regulations 
also approved the “Development Plan” attached as Exhibit B; and 
WHEREAS, in accordance with the Zoning Regulations, valid protest petitions were timely filed with the 
office of the County Clerk; and 
WHEREAS, the Planning Commission’s full record regarding the Application, public hearing, and 
Planning Commission deliberation, findings and decision -making was submitted to the BOCC , and the BOCC 
allowed expansion of the record (collectively, the “Record”); and 
WHEREAS, the Application and Record have been received and considered by the BOCC.  
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF 
SEWARD COUNTY, KANSAS: 
That, on a motion properly made and seconded, a vote of the BOCC is recorded as follows, pursuant to 
Kansas law and the Zoning Regulations, ordering and approving a conditional use permi t, such that such 
conditional use permit is hereby approved on the terms and conditions of this Resolution No. 2 026-XX [NTD: 
County would assign if BOCC adopts ] including its attachments  (collectively, “CUP”), which CUP totals ___ 
pages [NTD: County would complete from adopted version], which votes are recorded: 
 
Chairman Steven A. Helm Yes ☐ No ☐ Abstain ☐ Absent ☐ 
Commission Vice Chair Todd Stanton Yes ☐ No ☐ Abstain ☐ Absent ☐ 
Commissioner Clay Louderback Yes ☐ No ☐ Abstain ☐ Absent ☐ 
1
PDF page 2

Open original PDF at page 2

DRAFT
Page 2 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Commissioner Jairo Vazquez  Yes ☐ No ☐ Abstain ☐ Absent ☐ 
Commissioner John Mettlen Yes ☐ No ☐ Abstain ☐ Absent ☐ 
ADOPTED BY THE BOARD OF COUNTY COMMISSIONERS, SEWARD COUNTY, KANSAS, THIS 
___TH DAY OF _________________, 2026 (“Effective Date”).  
BOARD OF COUNTY COMMISSIONERS OF SEWARD 
COUNTY, KANSAS 
____________________________________ 
Steven A. Helm, Chairman 
ATTEST: 
       ____________________________________ 
__________________________________  Todd Stanton, Commission Vice Chair 
Stacia Long, County Clerk 
____________________________________ 
Clay Louderback, Commissioner 
 
____________________________________ 
Jairo Vazquez, Commissioner 
 
____________________________________ 
John Mettlen, Commissioner 
 
2
PDF page 3

Open original PDF at page 3

DRAFT
Page 3 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Attachments Index: 
 
Appendix I: CUP Terms and Conditions – Specific to Application and Project (7 pages) 
Appendix II: County General Fixed Terms and Conditions (8 pages) 
Exhibit A: Select Zoning Regulations (15 pages)  
Exhibit B: Thresher Development Plan (18 pages)  
Exhibit C: Certificate of Liability Insurance (1 page)  
Exhibit D: County Agreement Minimum Terms (15 pages) 
Exhibit E: Good Neighbor Agreement Form (3 pages) 
 
 
 
3
PDF page 4

Open original PDF at page 4

DRAFT
Page 4 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Appendix I: CUP Terms and Conditions – Specific to Application and Project 
1. Description of the CUP Real Property; Project; Use.   
a. Real Property : This CUP regards the real property that is described in Appendix A to the 
Development Plan  (“Property”), a visual aid of which Property is in Appendix F to the 
Development Plan, but Development Plan Appendix A controls over any conflict with 
Development Plan Appendix F as to Property description . No other real property is granted or 
allowed rights or uses pursuant to this CUP.  
b. Project and Project Property: The “Project” means the Property, and the following improvements 
and infrastructure and uses as might be located on or under said Property : the proposed 
construction of the CWECS includes twenty-two wind turbines , gravel access roads, and 
underground collection lines. No other infrastructure is included within this CUP. 
c. Use: The CUP permitted use is limited to a CWECS, as defined in the Zoning Regulations and as 
further defined and limited by the terms of the County Permitting. 
d. Improvements and Infrastructure . No other improvements or infrastructure or use is allowed , 
permitted or included pursuant to this CUP. Only to the extent and as set forth in the Zoning 
Regulations, to the extent any Project specifics (including without limitation described by type, 
technology, materials, color, dimensions, location, other appearance, or potential negative impact 
to property or persons beyond the Property boundaries) are not permitted as set forth in the County 
Permitting or are not expressly included in the Application, any such Project development remains 
subject to County approval. 
2. Certain CUP Terms and Conditions Not Limited to a Specific Phase or Timeframe.  Thresher shall, at all 
times during the term of this CUP, adhere to the following terms: 
a. No Development Obligation. Thresher will appropriately and responsibly construct and operate 
as an approved CWECS. But, this CUP does not create any obligation or promise of Thresher to 
pursue or complete any portion of the Project.  
b. Compliance. The Project must be owned, developed, constructed, operated, modified and 
decommissioned in compliance with, and Thresher shall adhere to strict conformance to all 
requirements, terms, standards set forth in:  
i. Laws. All applicable local (including, without limitation, the Regulations and other County 
codes, regulations, requirements, policies, forms, and practices), state and federal law, 
statutes, ordinances, rules, regulations, judgment, orders, and other governmental entity 
requirements (collectively, “Laws”), and  
ii. County Permitting. All County Permitting; and 
Thresher will obtain all permits, licenses, and orders required to construct or conduct any and all 
permitted uses of the Project. At any time the Planning and Zoning Administrator may require 
Thresher to provide the County with sufficient evidence in the County’s sole but reasonable 
discretion of compliance with this CUP.  
4
PDF page 5

Open original PDF at page 5

DRAFT
Page 5 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
c. Ground Clearance. The turbine blades shall have a minimum ground clearance of 40 feet at the 
lowest point of rotation and calculated for all directions. 
d. Tower Siting. Towers shall be sited in the locations identified and depicted on Development Plan 
Appendix F, but to accommodate any desired micro-siting those Tower locations may be adjusted 
up to 100’ in any direction. 
e. Tower Setback – Public Roadway. Towers shall be setback from public roadway a minimum of 
one times the tip height plus 75 feet from the road centerline.  
f. Tower Setback – Overhead Utilities. Towers shall be setback from existing overhead utilities a 
minimum of one times the tip height plus 40 feet. 
g. Tower Setback – Occupied Residence. Towers shall be setback a minimum of 1,000 feet from  
each Occupied Residence.  “Occupied Residence” means a residence that was occupied as of 
September 16, 2025. 
h. Tower Setback – Occupied Residence, Non -Participating Land. Towers shall be setback a 
minimum of 1,900 feet from each Occupied Residence located on Non-Participating Land. “Non-
Participating Land” means all land in Seward County for which as of the Effective Date no owner 
of that Seward County land’s fee title surface estate has entered into any contractual agreements 
with or for the benefit of Thresher.  
i. Tower Setback – Property Lines, Non -Participating Land. Towers shall be setback from  all 
property lines of Non-Participating Land a minimum of 500 feet from the nearest tip of the rotor 
to said property line.  
j. Tower Setback – Sound. Towers shall be setback so that sound from turbines is not greater than 
50 dBA  both at the exterior and also inside of each Occupied Residence located on Non -
Participating Land.  
k. Tower Setback – Shadow Flicker. Towers shall be setback so that shadow flicker from turbines is 
limited to no more than 30 hours annually at the exterior of each Occupied Residence located on 
Non-Participating Land. 
l. Landscaping, Screening, and Fencing . There are no requirements for landscaping, screening, or 
fencing beyond what is provided for in the Development Plan and the County Agreements. 
 
m. Sound. Thresher will use a low sound blade design in its turbine model as detailed in the 
Development Plan .  Upon request by the County, Thresher will cause  a sound report to be 
prepared pursuant to established industry standard methodologies, that identifies current decibel 
levels surrounding the project site and the decibel levels and source sound if development occurs. 
 
n. Turbine Technology. Thresher may adjust the turbine model as technologies may change from 
time of approval to time of construction, provided that the model or technology still complies 
with the County Permitting. Upon finalizing the model, Thresher shall notify the Planning and 
Zoning Administrator.  
o. Electrical Lines. Electrical lines shall be installed underground unless factors related to culturally 
sensitive areas dictate above ground installation.   Subject to the Road Use and Maintenance 
5
PDF page 6

Open original PDF at page 6

DRAFT
Page 6 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Agreement: Thresher may adjust the location of underground electrical collection lines and access 
roads, so long as such facilities are installed upon the Property , and Thresher will construct all 
access roads to be gravel and a minimum of 16 feet wide to accommodate emergency vehicle 
traffic. 
p. Wetlands; Drainage. Thresher will avoid jurisdictional wetlands in the design unless there is no 
reasonable alternative. Additionally, effects on drainage patterns will be minimized. The project 
will comply with all United States Army Corp of Engineer (“USACE”) requirements.  
q. Fill. Thresher will not introduce fill within FEMA regulated floodplains, unless approved by 
County. 
r. Signage. Thresher signage will be installed identifying the facility owner, operator and emergency 
contact information at all entrances. Signage will conform to the Seward County Sign Regulations 
Article 24. 
s. Certificate of Liability Insurance. Thresher agrees to maintain the liability insurance described in 
the certificate attached as Exhibit C, by an insurer with a minimum AM Best credit rating of A-. 
t. Light Mitigation Technology System. In addition to CUP § I.2.b., Thresher will diligently and in 
good faith (i) pursue approval of a l ight mitigation technology system for all Towers, (ii) install 
any approved system  as soon as possible  after CCD, and (iii) operate any approved system  as 
continuously as possible after COD.  
u. Local Contractors. Thresher will make a reasonable effort to use local contractors when feasible in 
the construction and maintenance of the Project.  But, a landowner can elect to waive, meaning 
County will not enforce, a Thresher violation of a provision of this CUP § I.2, if Thresher provides 
County sufficient written documentation for the County’s reliance that 100% of fee title surface 
estate owners of said land have permanently and fully waived for the benefit of the Project any 
right to County enforcement of said violation. 
3. Additional Specific Prerequisites to Construction or Operations.  Thresher shall abide by the following 
terms, and remain in compliance with all County Permitting for the CUP duration: 
a. Construction Plans. Thresher will submit the full Project construction plans to the County 60 days 
prior to the first day any change of elevation, grading, other earthwork (excepting geotechnical 
investigations, surveying, soil sampling, clearing, grubbing, and installation of erosion control 
measures), or other construction activity, commences related to the Project on any of the Property 
(the “Construction Commencement Date” or “CCD”).  
b. County Agreements . After obtaining the approved CUP and prior to CCD: Thresher and the 
BOCC (by simple majority vote approval) will enter into a Road Use and Maintenance 
Agreement, Decommissioning Agreement, and Contribution Agreement (collectively, “ County 
Agreements”), on terms acceptable to both parties in their respective reasonable discretion and 
consistent with the corresponding Meade and Gray County agreements for the Thresher Wind 
project, but County and Thresher already agree that the County Agreements will include at least 
the terms on attached Exhibit D. 
c. Development Plan.  The Development Plan must be followed ; and its terms and obligations do 
not end, expire, reduce or change after COD.  
6
PDF page 7

Open original PDF at page 7

DRAFT
Page 7 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
 
d. County Permitting. Thresher shall obtain from the County all County permitting and approvals 
required regarding the Project, including but not limited to the plans and other County permitting 
and approvals described in CUP § I.3.e. (such permitting and approvals, along with this CUP , 
Development Plan , the Zoning Regulations, and the County Agreements , collectively, the 
“County Permitting”).  
e. Certain County Permitting Due by CCD.  Thresher shall submit to the County the following plans, 
wildlife information and compliance report at least 90 days in advance of planned CCD, for  that 
County Permitting to be accepted as final on behalf of the County by CCD; and the County shall 
not unreasonably withhold, condition, or delay its response and acceptance if what is submitted 
meets the CUP requirements: 
 
i. Traffic and Road Use Plan. Thresher shall coordinate with the County Planning & Zoning 
Administrator and the Road & Bridge Department to ensure an adequate Traffic and Road 
Use Plan and incorporate input if it is commercially reasonable.  This plan shall comply 
with Article 27 -104.8(D) of the Zoning Regulations,  information detailing anticipated 
volume and designated route for constructing traffic, including oversized loads and heavy 
equipment, with proposed methods of assurance regarding maintenance and repair to 
public roads, bridges or culverts during the cons truction. Provide information regarding 
the traffic control plan for designated routes or construction activities within road right-of-
way in accordance with the Uniform Manual for Traffic Control Devices. Provide plans 
and drawings that detail the construction details for installation of entrances, road crossings 
or right-of-way encroachment, detail anticipated volume and routes for facility operational 
traffic. This plan may be included in the road use and maintenance agreement referenced 
above in § I.3.b. 
ii. Emergency Response Plan . Thresher shall coordinate with the Fire Chief to ensure an 
adequate Emergency Response Plan and incorporate input if it is commercially reasonable.  
This plan shall include a safety plan, in accordance with Article 27-104.8(G) & (H) of the 
Zoning Regulations, detailing expected public agency/emergency services support during 
emergencies, including training services and equipment (as necessary) for local County 
personnel, and identifying potential fire risks associated with the project and demonstrate 
compliance with applicable federal, state, and local fire codes, including but not limited to 
the National Fire Protection Association, Kansas State Fire Marshal, and County 
Emergency Management.  Thresher will coordinate with emergency services in Seward 
County such as the local fire department and emergency management services to put forth 
this plan, which will include: 
1. A safety plan detailing expected public agency/emergency services support during 
emergencies, including training services and equipment for local County personnel, 
and 
2. Identify potential fire risks associated with the project and demonstrate compliance 
with applicable Federal, State, and local fire codes, including, but not limited to, 
the National Fire Protection Association, Kansas State Fire Marshal, and Seward 
County Emergency Management. 
7
PDF page 8

Open original PDF at page 8

DRAFT
Page 8 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
3. Any other reasonable information that Thresher, the Fire Chief or the Planning and 
Zoning Administrator deems appropriate. 
iii. Dust and Weed Control Plan . Thresher shall coordinate with the County Planning & 
Zoning Administrator to ensure an adequate Dust and Weed Control Use Plan  as 
additionally required by Article 27 -104.8(J) of the Zoning Regulations,  and incorporate 
input if it is commercially reasonable.   
iv. Water.  Thresher shall coordinate with the County Planning & Zoning Administrator to 
ensure an adequate Water Plan for any potential water needs, ensuring best practices are 
employed. Thresher shall incorporate County Planning & Zoning Administrator input if 
commercially reasonable. 
v. Security.  Thresher shall coordinate with the County Planning & Zoning Administrator to 
ensure an adequate Security Plan and incorporate input if commercially reasonable, 
detailing security measures, access control, and security response protocols to be in place 
for all phases of the Project timeline. 
vi. Wildlife. Thresher shall provide the County Planning & Zoning Administrator written 
documentation from the Kansas Department of Wildlife and Park s (“KDWP”) indicating 
that Thresher has contacted the agency regarding the proposed Project. The document 
should state KDWP has been contacted by the applicant regarding the proposal and has 
reviewed or is currently reviewing the proposal for any concerns regarding threatened or 
endangered species. Thresher shall deliver a binding written verification from Thresher for 
County's reliance that the Project has followed a tiered approach as outlined in the U.S. 
Fish and Wildlife Services (“USFWS”) guidelines and is in compliance with and agrees to 
remain in compliance with all applicable federal, state, and local environmental laws.   
vii. Acknowledgement of Phase One Environmental Report. Thresher has provided and County 
confirms it is accepted as final , a Phase One Environmental Screening Report in 
accordance with industry standards as required by Article 27 -104.8(E) of the Zoning 
Regulations. 
viii. Pre-CCD Compliance Report. Before CCD, Thresher shall d eliver a binding written 
verification from Thresher for County's reliance covering up until the CCD: of compliance 
with § I.2.b., and of compliance with all County Permitting necessary to commence CCD; 
including copies of all associated permits, approvals and similar required by governmental 
entities to construct the Project (including without limitation all environmental permits and 
stormwater prevention permits) (“Pre-CCD Compliance Report”). The County’s Planning 
& Zoning Administrator shall review the Pre -CCD Compliance Report and confirm in 
writing whether all pre -CCD requirements under the County Permitting are satisfied and 
Thresher may commence CCD.  Such review and confirmation shall  be completed 
expediently and shall not be unreasonably withheld , conditioned, or delayed.  No change 
of elevation, grading, other earthwork,  earth disturbances or Project construction 
(excepting clearing, grubbing, and installation of erosion control measures) may occur until 
the County’s Planning & Zoning Administrator has expressly in writing confirmed that all 
pre-CCD County Permitting requirements have been satisfied and CCD may begin.   
f. Good Neighbor Agreements. Prior to CCD of the Project, Thresher will offer a Good Neighbor 
Agreement in the form of Exhibit E , to the owners of each Occupied Residence located (i) on 
8
PDF page 9

Open original PDF at page 9

DRAFT
Page 9 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Non-Participating Land and also (ii) within one (1) mile of a planned Tower. This Agreement 
does not limit negotiation by said Occupied Residence owners for more favorable terms beyond 
what is provided in Exhibit E. This paragraph does not constitute an interference with, or waiver, 
of property rights or right to contract, and property owners remains free to choose whether to 
enter into a Good Neighbor Agreement. 
g. Construction Disturbances. Without the prior consent of the County (such consent not to be 
unreasonably withheld, conditioned, or delayed, but subject to any non -waivable provisions of 
the Zoning Regulations or other County laws), blasting  and drilling shall only be conducted 
during 7:00 AM to 7:00 PM.  
h. County Updates. Thresher shall provide an update to the County within 20 days as requested by 
the County through COD, with all pertinent information related to the Project, including progress 
on Project, whether the Project’s timetable is on schedule, status of construction, anticipated COD 
date changes, and other pertinent Project information that the County might request from time -
to-time, on any form that the County might request from time-to-time. 
i. Pre-COD. Thresher shall provide any additional copies of all environmental permits required by 
State and Federal agencies, relevant stormwater prevention permits received from State agencies, 
and copies of all associated permits required to construct the Project from any other governmental 
entity between CCD and COD .  Thresher shall confirm that all COD County Permitting 
requirements and conditions precedent have occurred.  
4. Additional Specific Post-COD Requirements.  Thresher shall at all times during the term of this CUP after 
COD, abide by the following terms: 
a. As-Built Plans.  Within 6 months after COD, Thresher will submit to the County  the complete 
Project as -built plans, certified for the County’s reliance by the third party professional 
responsible for said plans as to (A) any change in the as -built plans from the pre -construction 
plans provided to the County, and (B) any actual changes to the infrastructure shown on said as-
built plans compared to prior plans or descriptions provided to the County. 
b. Personal Property Information.  Thresher shall comply with K.S.A. 79 -306; and irrespective of 
whether Thresher is required by Kansas law to comply with K.S.A. 79-306 Thresher will deliver 
to the County Appraiser a tax rendition  as described in K.S.A. 79 -306 from or on behalf of 
Thresher by a qualified professional for County's reliance, inclusive of the “retail cost when new” 
calculation as required by the Kansas Constitution Art 11 §1, of all Project commercial and 
industrial machinery and equipment with its situs in the County  for the purpose of property 
taxation. The first verification will be delivered on or before March 15  following COD , and 
annually thereafter only to reflect any change in personal property from the last verification. 
c. Traffic. Traffic during operations will be minimal and limited to maintenance , repairs,  and 
groundskeeping.  
d. Project Report. Annually from the COD through the end of decommissioning and restoration, 
Thresher will provide County with a Project report in a form reasonably required by County. 
e. Subsequent Improvements and Use. Regarding any Project development, construction, 
infrastructure, improvements, personal property, operations, or modifications, not contained in 
County Permitting and occurring after COD excluding repairs or maintenance (collectively, 
9
PDF page 10

Open original PDF at page 10

DRAFT
Page 10 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
“Subsequent Improvements and Use”), the County has the right to implement the current Zoning 
Regulations or modify the County Permitting terms at the time of permit application  for any 
Subsequent Improvements and Use.  Subsequent Improvements and Use are not permitted by this 
CUP and instead require Thresher to provide the County Administrator and County Counselor 
with sufficient advance prior notice  of and application for such proposed Subsequent 
Improvements and Use for County to determine and implement its requirements. 
5. Additional Specific Decommissioning/Restoration/Abandonment/Financial  Security Terms . Thresher 
shall at all times during the term of this CUP adhere to all provisions in Article 27-104.8(K) of the Zoning 
Regulations, § 3.1 of the Application , and the Decommissioning Agreement , which regard 
decommissioning. 
 
10
PDF page 11

Open original PDF at page 11

DRAFT
Page 11 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
Appendix II: County General Fixed Terms and Conditions 
1. Payments Due to County. Because the benefits to the County will be reduced if Thresher does not develop 
and operate the entire contemplated Project for its contemplated useful life, and due to the unique nature 
and potential impacts of the Project, considerable County resources have been expended and might further 
be expended unique to County resources involved regarding historically typical land uses or use proposals 
within the County, i ncluding without limitation,  creating, implementing and monitoring County 
Permitting of the Project, additional County personnel time or education involved, and outsourcing some 
County roles; Thresher shall pay the County: 
a. Initial Payment. $287,000, due within 45 days after the Effective Date. 
b. 50% Reimbursements. Except as provided below in CUP §§ II.1.c. and d., reimbursement of 50% 
of County’s attorney’s fees and costs in excess of $287,000 and related to the County Permitting.  
c. 100 % Reimbursements. Reimbursement of 100% of County’s reasonable attorney’s fees and costs 
incurred after the Effective Date pursuant to CUP §§ II.3.a or II.12.q.  
d. Reimbursement Requirements. For reimbursement of attorney’s fees and costs  under CUP §§ 
II.1.b. and c., payments are due to County 45 days after Thresher’s receipt of an invoice (which 
may be delivered via email), unless the amount is disputed in good faith that Thresher reasonably 
believes to be excessive, unreasonable, duplicative, incorrectly billed, inadequately documented, 
or not reimbursable under this Agreement , including by providing County with the clear and 
specific reason for the dispute and Thresher’s calculation of the proper invoice amount. The parties 
shall work in good faith to resolve any disputed amounts  documented, and out -of-pocket costs 
incurred and paid by the County. Reimbursable costs shall be limited to fees and  costs that are 
attorney’s fees and costs in connection with the review, processing, negotiation, including but not 
limited to issuance, administration, or enforcement of County Permitting, and directly attributable 
to the Project and would not have been incurred but for the Project. Thresher shall have no 
obligation to reimburse any cost unless the County provides a copy of the applicable invoice 
containing the following information or restrictions: (i) the name of each attorney or professional 
providing services and such person’s hourly rate;  (ii) An itemized invoice with time entries 
describing the work performed, the date of service, and the time expended for each task. To the 
extent the County claims any information is exempt from disclosure under the Kansas Open 
Records Act, the invoice shall identify the basis for such claim and provide sufficient information 
for Thresher to evaluate the charge; and (iii) Block Billing shall not be permitted.  But, no payment 
pursuant to CUP § II.1.b. is due for fees or costs (iii) sooner than 90 days after County delivers 
after the Effective Date its proposed versions of all three County Agreements, or (iv) if County is 
in violation or CUP Default of CUP § I.3.b.  
2. Payment Conditions.  All p ayments, reimbursements, or other money due to County  are due by wire 
transfer unless sufficient wire transfer instructions and information are not provided to Thresher, otherwise 
payments are due by check once Thresher is provided sufficient check completion and delivery 
instructions, and said payments are due only after Thresher’s receipt of an invoice that has approved for 
payment on behalf of County. 
3. Claims and Indemnification. 
a. Thresher Indemnification of County. Thresher shall indemnify, defend, and hold the County 
harmless from and against any and all Disputes, losses, damages, liabilities, judgments, awards 
11
PDF page 12

Open original PDF at page 12

DRAFT
Page 12 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
and costs (including reasonable attorney’s fees and costs) (each a “Claim”) incurred by or sought 
against the County, to the extent any Claim arises out of or is related to any:  
i. Thresher Failure, Default or Breach. F ailure, default, or breach by Thresher of any 
County Permitting;  
ii. Thresher Violation of Law. Violation of applicable law by Thresher or its employees , 
contractors or agents;  
iii. Thresher Conduct. Negligence or willful misconduct by Thresher or its employees or 
agents; or 
iv. Accuracy. Accuracy of information for the legal descriptions of the involved real property 
and parties with interests in said real property, both the real property subject to this CUP 
and also real property and parties for which written notice was required ; which 
information was received from or on behalf of Thresher  and County relied solely on 
Thresher and its selected vendor; or 
v. Thresher Dispute or Claim. Thresher Dispute or Claim brought against the County in any 
way related to the validity, enforceability, or legality of any County Permitting 
documents or rights (for avoidance of doubt including without limitation County 
Agreement terms included in the CUP despite that County Agreements are not executed), 
for which Thresher had actual knowledge of and a reasonable opportunity to investigate, 
verify, and notify the County of on or before the Effective Date; or   
vi. Third-party Dispute or Claim. Third-party Dispute or Claim brought against the County 
in any way related to the validity, enforceability, or legality of County Permitting.   
This paragraph pertains only to third -party Claims: For third-party Claims under CUP 
§II.3.a, Thresher will have the right to contest and assume the defense of the County against 
any Claim with counsel of its choice reasonably satisfactory to the County so long as 
(A) Thresher notifies the County in writing within thirty (30) days after the County has 
given a Claim notice (or by such earlier date as may be necessary under applicable 
procedural rules in order to file a timely appearance and response or other required 
pleading) of its intent to conduct such defense, (B) the  County has not been advised by 
counsel that an actual conflict exists between the County and Thresher in connection with 
the defense of the third party Claim (other than any conflict or potential conflict resulting 
solely from Thresher’s indemnification o bligations under this CUP), and (C)  Thresher 
conducts the defense of the third-party Claim diligently. So long as Thresher is conducting 
the defense of the third -party Claim in accordance with this paragraph, the County may 
retain separate co-counsel, at the County’s sole cost and expense (without reimbursement 
for such expenses, either pursuant to this CUP or otherwise), and participate in the defense 
of the third party Claim, it being understood, however, t hat Thresher shall control such 
defense. 
b. No Obligation to Indemnify, Defend or Hold Harmless . Provided, however, that Thresher shall 
have no obligation to indemnify, defend, or hold harmless the County to the extent a Claim arises 
from the negligence, willful misconduct, or violation of law by the County  solely to the extent 
finally determined by a court of competent jurisdiction . As of the Effective Date, the County 
represents and warrants to Thresher that it maintains general liability and errors and omissions 
insurance coverage that insures the County as to all Claims made or makeable under CUP 
12
PDF page 13

Open original PDF at page 13

DRAFT
Page 13 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
§II.3.a.iv. above in the minimum amount of $500,000.00 (“County Insurance”), and County agrees 
to maintain the County Insurance (or comparable replacement insurance coverage in no less than 
the above-described amount and for the same above-described Claims) at all times prior to COD; 
and County shall file a claim for and pursue all available coverage under the County Insurance for 
such Claim in a t imely manner. County is not obligated to use County Insurance for any costs, 
liabilities, or Disputes regarding any Thresher obligations except as described herein. 
 
4. Compliance Report. County may reasonably request a  Compliance Report from time to time and Thresher 
shall provide it within 45 days of receipt of a request , confirming as of the Compliance Report date  any 
of the following provisions on a request form document provided by the County: (a) the Thresher entity; 
(b) the respondent’s notice information; (c) any known default, breach, violation or failure of any County 
Permitting; (d) the full set of CUP provisions; (e) the total amount of all payments due to the County and 
any due to Thresher; (f) whether the Project has ceased operations; and (g) whether Thresher identifies 
any provision of any County Permitting as fully performed or no long applicable. Thresher’s failure to 
deliver a Compliance Report when due is deemed that Thresher delivered a Compliance Report confirming 
the express terms included in the requested document received by Thresher from the County provided that 
all of the relevant documentation was also attached to the request form document. 
5. Cooperation. The County and Thresher agree to communicate and cooperate in good faith regarding this 
CUP and the County Agreements. Both the County and Thresher shall execute and deliver such additional 
documents and instruments and to perform such additional acts as may be necessary or appropriate to 
effectuate, carry out and perform all of the terms, provisions and conditions of this CUP. As mentioned in 
CUP §  II.1 above, County personnel time and resources to implement and monitor all of the County 
Permitting (which might include personnel obtaining additional advice on topics beyond their experience), 
to participate in cooperation, and to respond to proposed transfers,  will be unprecedented and incurred 
prior to County receipt of material benefits due to the CUP, so for that reason , notwithstanding any 
provision in the County Permitting to the contrary: the due course timing for County administration of 
County Permitting including review of and response to information or inquiries from Thresher might occur 
on a timeline different than otherwise anticipated  or desired, as County has no obligation to incur 
expediting or other costs beyond personnel cos ts budgeted in the County Commission’s sole discretion 
from time-to-time.  Thresher is advised to communicate, submit information and requests, and coordinate, 
sufficiently in advance to allow County abundant time to meet any Thresher desired timelines. 
6. Transferability. Thresher (or any of its successors or assigns) may wholly or partially assign the rights, 
obligations, and interests under this CUP to an affiliated entity upon written notice to the County. Upon 
such an assignment, the assignor party will be subject to the requirements of this CUP prior to the date of 
assignment or transfer and the assignee party will be subject to the requirements of this CUP after the 
assignment date. Thresher (or any of its successors or assigns) may wholly or partially assign the rights, 
obligations, and interests under this CUP to an unaffiliated entity i) with the written consent of the County, 
which shall not be unreasonably withheld, conditioned, or delayed or ii) upon notice to the County in the 
event the assignee entity holds a senior long term debt rating from Standard & Poor’s Rating Group, a 
division of McGraw Hill, Inc. (“Standard & Poor’s”), of at least BBB- (or its equivalent) or from Moody’s 
Investors Service, Inc. (“Moody’s”) of at least Baa 3 (or its equivalent). Upon Thresher ’s (and any of its 
successors or assigns) whole or partial assignment or transfer of this CUP, the assignor entity will be 
subject to the requirements of this CUP prior to the date of assignment or transfer and the assignee entity 
will be subject to requirements of this CUP after the assignment or transfer date. If Thresher (or any of its 
successors or assigns) partially assigns any of the rights, obligations, and/or interests under this CUP, then 
the assignee shall only be subject to the terms, conditions, and obligations relating to the portions of this 
CUP that are assigned and shall not be subject to any terms, conditions, and obligations that the assignor 
13
PDF page 14

Open original PDF at page 14

DRAFT
Page 14 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
retained under this CUP, including any consequences for default(s) or violation(s) of obligations. Any 
attempted assignment in contravention of this provision shall be void ab initio.  
7. Amendments. Except as allowed by, and subject to, CUP §II.14.j: this CUP may be amended, 
supplemented, modified or waived (a) prior to COD, only pursuant to the Zoning Regulations in effect as 
of the Effective Date; while (b) after COD, only pursuant to the then-current Zoning Regulations. 
8. Register of Deeds. County may require or cause notice of the CUP to be recorded and indexed with the 
Seward County Register of Deeds against the Property.  
9. Notices. Any notice which is personally served shall be effective upon the date of service. Any notice given. 
by U.S. Mail shall be deemed effectively given, if deposited in the U.S. Mail, registered or certified with 
return receipt requested, postage prepaid and addressed as provided above, on the date of receipt, refusal 
or non-delivery indicated on the return receipt. In addition, either Party may send notices by facsimile or 
by a nationally recognized overnight courier service which provides written proof of d elivery (such as 
United Parcel Service or Federal Express). Any notice sent by facsimile shall be effective upon 
confirmation of receipt in a legible form, and any notice sent by a nationally recognized overnight courier 
service shall be effective on the date of delivery to the Party at its address specified below as set forth in 
the courier’s delivery receipt. Either party may, by notice to the other from time to time in the manner 
provided herein, specify a different address for notice purpose. 
If to Thresher: 
Project Manager 
Thresher Wind LLC 
One South Wacker Drive  
Suite 1500 
Chicago, IL 60606 
 
If to the County: 
Seward County Clerk 
515 N Washington, Suite 100 
Liberal, KS 67901 
 Seward County Administrator 
515 N Washington, Suite 204 
Liberal, KS 67901 
 
10. Duration of CUP. In accordance with Zoning Regulation Article 27-105, and subject to earlier termination 
as provided in this CUP, the CUP will be valid for the life of the Project and through decommissioning 
activities; provided, that this CUP is automatically expired, void, and revoked by the County if  (a) the 
CCD does not occur by the third anniversary date of the CUP Effective Date, or (b) if the particular use 
ceases to exist for a period of six months as set forth in Zoning Regulation Article 27-105, unless otherwise 
agreed to by the Board of County Commissioners. If the Development Plan is voided as to all or some of 
the Property, Project construction and use must cease while the CUP remains in effect unless otherwise 
agreed to by the Board of County Commissioners, and Zoning Regulation Article 20-107 applies. 
11. Governing Law; Disputes. This CUP shall be governed by and construed in accordance with the laws of 
the State of Kansas without regard to conflicts of laws provisions. This CUP is subject to cash basis and 
budget law limitations and any other limits on the authority of the County Commission to impose or grant 
terms extending into the future. Venue is only proper in Kansas state district court located in Seward 
County, Kansas, or  federal district court located in Wichita, Kansas. All disputes, actions, suit s, 
proceedings, challenges and claims arising out of, relating to, or in connection with this CUP, including, 
without limitation, with respect to its execution, validity, application, interpretation, performance, failure, 
14
PDF page 15

Open original PDF at page 15

DRAFT
Page 15 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
default, breach, termination or enforcement (each a “Dispute”), shall be resolved by a court of competent 
jurisdiction in accordance with this CUP.  
12. Enforcement; Remedies. Except the County and Thresher; other persons, entities or groups, including, but 
not limited to, Seward County citizens, Project host landowners, other owners of real property, and Project 
opponents or proponents, have no rights under this CUP and do not possess enforcement rights in this 
CUP.  
Upon a Dispute related to this CUP, a “CUP Default” of County or of Thresher may be declared by the 
other, only after the other has: 
a. Written Notice. Delivered written notice to the entity proposed to be in CUP Default, which notice 
shall specifically describe the Dispute , the pertinent cure period pursuant to this CUP , and the 
Dispute resolution(s) acceptable to the party delivering the notice, and  
b. Cure Period. Waited the cure period and the Dispute is not fully resolved. 
The cure period after the notice effective date for a Dispute related to this CUP to avoid becoming a CUP 
Default is: 
c. No Cure Period. There is no cure period for Thresher failure to complete with §I.3.e.viii. or §I.3.i. 
if such Default relating to §I.3.e.viii. or §I.3.i . is deemed valid by the Planning and Zoning 
Administrator. 
d. Right to Void. 45 days if County claims a right to void a CUP term pursuant to CUP §II.15. 
e. Risk of Material Harm. If County in good faith reasonably determines that the Dispute could put 
persons or property at risk of material harm, then the cure period for Developer to remove that risk 
of material harm will be a temporary cure period County reasonably determines in good faith and 
includes in the notice. 
f. Monetary Claim. If County claims any monetary payment is due from Thresher that Thresher does 
not in good faith reasonably dispute , the cure period for Thresher to pay the amount in full is 45 
days after the later of (i) the payment due date, and (ii) the date that County delivers Thresher with 
written notice of an invoice.  
g. Other. Otherwise if the cure period is not governed by the above then the cure period is 45 days 
after the written notice effective date, unless the nature of the Dispute requires more than 45 to 
cure then the cure period is extended day -for-day past 45 days by the number of days that the 
Dispute could be fully resolved provided that the entit y commence cure within 10 days of the 
notice effective date and diligently good faith pursues the cure to completion. 
h. No Cure Period Extension. As to any Thresher obligation to make a payment, the cure period is 
not extended for any force majeure or similar claim, including without limitation amounts owed 
to the County or to any third party for insurance or other monetary obligations.   
The County has discretion to extend the cure period if Thresher is diligently working in good faith 
pursuing the cure to completion.  Upon a CUP Default by the County or Thresher, the other  may 
pursue all remedies available pursuant to this CUP, at law and in equity for said CUP Default, which 
15
PDF page 16

Open original PDF at page 16

DRAFT
Page 16 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
remedies are cumulative and not mutually exclusive. County’s remedies for Thresher CUP Default 
include without limitation: 
i. Imposing Fines. Imposing fines established in any of the County Permitting or as County might 
otherwise reasonably establish,  
j. Actual Damages. County’s actual damages,  
k. Self Help. The County may, following written notice of a Thresher CUP Default and expiration of 
any applicable cure period, perform or cause to be performed any obligation that Thresher has 
failed to perform and that is reasonably necessary to protect public health, saf ety, or property 
(“Self-Help”).  Thresher shall reimburse the County for the actual, reasonable, and documented 
third-party costs incurred in exercising such Self-Help remedy,  
l. Costs of Self Help. County’s costs due to Self-Help remedy, shall be paid to County 45 days after 
the effective date of County written notice and invoice to Developer providing reasonable detail 
of the costs and damages, (e) suspend any Thresher right arising from the County Permitting,  
m. Suspension of Proceedings. S uspend any proceedings or other efforts in process regarding or 
related to any County Permitting,  
n. Suspension. Suspend the CUP permitted use and Project,  
o. Revocation or Termination of CUP. R evoke or terminate the CUP provided that such process 
include any additional CUP revocation or termination requirements pursuant to the Regulations,  
p. Revocation or Termination of County Permitting. Revocation or termination of any other County 
Permitting pursuant to the Regulations and other terms of the County Permitting, and  
q. Reasonable Costs. Reasonable costs incurred related to the Dispute, CUP Default, cure or pursuing 
any remedy, including without limitation reasonable attorney’s fees and costs, subject to §II.3,  and 
r. Failure to Pay. F or Thresher’s failure to pay an amount when due  pursuant to any County 
Permitting or an amount due because of a Thresher CUP Default, interest accruing at 15% per 
annum beginning on the day after the payment due date irrespective of when CUP Default occurs. 
Upon cure of any Thresher CUP Default the County in its sole discretion may require evidence of 
cure, or else the County may pursue such evidence at the cost of Thresher. 
13. CUP Provisions Surviving Termination or Expiration. If this CUP is terminated for any reason or expires, 
Thresher shall remain liable to County for any cost incurred by the County for any damages resulting from 
a breach of any condition of the CUP or any Regulation, and for completion of any Thresher obligation 
that reasonably survives the CUP termination or expiration (for example without limitation, completing 
all decommissioning and restoration obligations, completing all pertinent road use and regulation terms, 
completing all payments due to County). The obligations set forth in this paragraph shall survive 
termination or expiration of this CUP for a period of three (3) years , but this sentence does not waive or 
modify any County right or remedy pursuant to any other agreement or document.  
14. CUP Interpretation.  
16
PDF page 17

Open original PDF at page 17

DRAFT
Page 17 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
a. Recitals, Appendices and Exhibits. Recitals, Appendices, and Exhibits attached are 
incorporated by reference into this CUP as if fully set forth, and are intended to be 
construed as part of this CUP’s terms and conditions.  
b. Thresher. “Thresher” means the original Applicant and CUP grantee, or upon a permitted 
transfer complying with CUP § II.6., then the transferee. 
c. Capitalized Terms in CUP. Capitalized terms used in this CUP including CUP Appendices 
I and II but excluding in any of its Exhibits, are defined: 
i. Defined in CUP. In this CUP without its Exhibits; 
ii. Defined Most Consistently in Exhibits. If not defined in this CUP without its Exhibits, then 
as defined most consistently within the CUP Exhibits; 
iii. Defined in Regulations. If not defined in this CUP including any of its Exhibits, then in the 
Regulations; or 
iv. Defined Interpretation and Construction Provisions. If not defined pursuant to the above 
definition rules, then as defined in the interpretation and construction provisions and rules 
of the Regulations.  
d. Capitalized Terms in Exhibits . Capitalized terms used in an Exhibit to this CUP are 
defined pursuant to the terms of that specific Exhibit document. 
e. Invalidity. Should any claim by anyone other than the County cause any section, clause, 
or provision of this CUP be declared invalid or unconstitutional by any court of competent 
jurisdiction, the same will not affect the validity of this CUP as a whole, or any part 
thereof, other than the part so declared to be invalid or unconstitutional,  the County may 
amend or reform the CUP as necessary to include a sufficient replacement provision 
acceptable to the County in its sole but reasonable discretion. 
f. County Authority. This CUP does not waive or limit the County’s police power, home 
rule, regulatory authority, or any other County authority or discretion or any County 
liability limitations, pursuant to applicable law from time-to-time. 
g. Conflict Resolution. In the event of any conflict (i) of terms within this CUP, or (ii) 
between this CUP and any of the Application, Regulations, other Law, or County 
Permitting; the conflict shall be resolved by giving effect to the provision most specifically 
applicable to the subject matter at issue.  If the conflict cannot be resolved on that basis, 
the applicable provisions shall be interpreted, to the extent reasonably possible, in a 
manner that gives effect to each without creating a conflict.  
h. Provisions Not Expressly Approved. Any Application provision not expressly approved 
or allowed pursuant to this CUP is not assumed to be approved by this CUP. 
i. Time. Time is of the essence of each provision and obligation of or related to this CUP. 
j. Discretion. The Seward County Administrator or Planning and Zoning Administrator may 
each individually interpret, waive, and enforce, any CUP provision; unless the BOCC 
17
PDF page 18

Open original PDF at page 18

DRAFT
Page 18 of 18 
version 10.28.26 draft subject to Seward County Commission review and consideration 
 
elects to retain any of that discretion from time -to-time.  If a County Permitting role is 
assigned to any County personnel who is unwilling or unable to perform the role or 
perform the role without additional support, the Seward County Administrator has 
authority to perform or cause the role to be performed by one or more other or additional 
County personnel or contractors. 
k. CUP Construed Against County. No phrase, sentence, clause, provision, or section of this 
CUP will be construed against the County as a result of the County having acted as the 
primary drafter thereof. 
l. Subject to Regulations. This CUP incorporates the terms and conditions of any required 
provisions of the Application or Regulations and remains subject to the Regulations. 
m. Headings. Headings of CUP sections and sub -sections are merely for organizational 
convenience and do not affect the interpretation of the CUP text. 
n. Approval from Planning and Zoning Administrator. To the extent that Thresher needs to 
obtain approval from the Planning and Zoning Administrator related to any County 
Permitting Documentation, such approval will be contingent on approval of any other 
County personnel with the applicable skill, experience, or powers over the subject matter 
at issue. 
o. Level of Detail . The Parties agree that the varying levels of details do not indicate a 
limitation of County discretion when interpreting or enforcing the provisions of County 
Permitting Documentation.  
15.  County Assumptions. The CUP assumes the Application accuracy and completeness of all required 
information without any independent verification by Seward County, and the County may elect in its sole 
discretion to void any pertinent term of this CUP that in part was based on any inaccurate or incomplete 
portion of the Application, if the County determines part of the Application is inaccurate or incomplete 
then County will provide notice to Thresher of that Dispute, specifying the issue to resolve. If the county 
voids any pertinent term of this CUP then the remainder of the CUP shall not be affected by such finding, 
and a provision shall be deemed added as may be possible to accurately reflect the intention of the parties 
and so as to make the provision accurate and complete.  
16. Termination of Prior  Agreements. Upon the approval of this CUP and the approval of all required 
Agreements and permit approvals needed to start construction  shall result in the  termination and shall 
supersede all terms and rights granted by the prior Conditional Use Permit for Cimarron Wind Project, 
LLC and all other related County approvals are terminated and void. 
18
PDF page 19

Open original PDF at page 19

EXHIBIT A: SELECT ZONING REGULATIONS
20-103 Development Plan
Application for a “Planned” district, a "PUD" Planned Unit Development or a Conditional
Use and development plan approval shall be made in accordance with the procedures
outlined in Article 32 of these Regulations. The application shall include a development
plan that describes the applicant's intentions for the use and development of the property.
The development plan shall include and/or display the following information:
1. 
A topographic survey indicating the legal description, property boundary, existing
contours, existing utilities and easements, and natural and manmade features of the
property.
2. 
A development plan, drawn to the same scale as the topographic survey, indicating:
a. 
existing contours (shown as dashed lines).
b. 
proposed contours (shown as solid lines)
c. 
location and orientation of all existing and proposed buildings.
d. 
areas to be used for parking, including the number and arrangement of stalls.
e. 
areas to be developed for screening, including the location of plant
materials, and screening structures and features.
f. 
pedestrian and vehicular circulation, and their relationship to existing
streets, alleys and public right-of-way.
g. 
points of ingress and egress
h. 
location of all existing and proposed utilities (sanitary sewage systems, water
systems, storm drainage systems, gas lines, telephone lines and electrical power
lines).
i. 
drainage controls (retention or detention ponds).
j. 
location, size and characteristics of identification and business signs.
k. 
lighting layout, appurtenances, and intensity of illumination.
l. 
proposed finished floor elevations of all buildings and structures.
3. 
A statement of intent shall accompany the preliminary development plan to explain
the measures used to achieve compatibility of the proposed development with surrounding
properties through the planning of the site and the location and design of structures.
20-105 Development Plan – Phasing, Time Restrictions
The applicant may proceed with construction based on the entire development plan, or
may elect to develop the property in phases. The applicant may submit the development
plan separately for the first and each successive phase of construction, or for all of the
project with a depiction of the phasing sequence; however, all “Planned” districts, "PUD"s
and Conditional Uses approved with a development plan shall have construction begun
with one (1) year of said approval by the Seward County Planning Commission. The
19
PDF page 20

Open original PDF at page 20

applicant may request a one (1) year extension of this time restriction by submitting a
request in writing to the Seward County Planning Commission stating the reasons
construction has not begun and at what time construction is expected to begin. If the
Seward County Planning Commission agrees, the one (1) year extension may be granted
one time but shall not be granted for any longer period.
The Seward County Planning Commission shall review the development plan and shall act
on said plan in a reasonable time period. Upon approval by the Seward County Planning
Commission, the development plan shall be filed for record in the office of the Zoning
Administrator.
After the development plan has been approved, and when in the course of carrying out the
development plan, minor adjustments are requested by the applicant and such
adjustments conform to the minimum standards established by the approved
development plan for building coverage, parking spaces, points of ingress and/or egress,
heights, setbacks and/or other requirements, such adjustments may be made by the
Zoning Administrator. If the requested adjustments are deemed by the Zoning
Administrator to exceed the minimum standards established by the approved development
plan, the revised development plan must be submitted and approved by the Seward
County Planning Commission before any further work can proceed. Said revised
development plan shall not require another public hearing unless the Seward County
Planning Commission determines that the revisions requested are so significant that the
public interest will be protected only by conducting a public hearing on said revised
development plan. Regardless of whether a public hearing is required or not, at no time
shall the Conditional Use previously approved be subject to disapproval. The only issue in
said review shall be the requested revisions to the previously approved development plan.
Those properties granted a Conditional Use Permit at the time of adoption of these
Regulations and which do not have an approved Development Plan may submit a
Development Plan at any time for administrative approval by the Zoning Administrator,
including to propose an enlargement, expansion or other improvement of said use as
permitted by these Regulations. If the Zoning Administrator deems the proposal beyond
his/her authority, the owner may submit the proposed Development Plan to the Seward
County Planning Commission as outlined in the paragraph above.
Article 24 – Sign Regulations
Sections:
24-101 Purpose and Scope
24-102 Objectives
24-103 Definitions
24-104 General Sign Requirements
24-105 Procedural Requirements
24-106 Design and Construction Standards
20
PDF page 21

Open original PDF at page 21

24-107 District Regulations
24-108 Nonconforming Signs
24-101 Purpose and Scope: The purpose of this Article is to encourage the effective use of
signs as a means of communication; to maintain and enhance the aesthetic environment
and the ability of Seward County and the City of Kismet to attract sources of economic
development and growth; to improve pedestrian and vehicular safety; to eliminate
excessive and confusing signage; to promote compatibility of signage with nearby public
and private property; to enable the fair and consistent enforcement of this Article by
governing the placement, use and structural quality of outdoor signs and other advertising
and identification devices together with their appurtenant and auxiliary apparatus.
After the effective date of these Regulations, no sign shall be erected, constructed,
reconstructed or otherwise altered without first obtaining a separate sign permit. Such sign
permit shall be legally issued only when in compliance with the regulations set forth in this
Article.
24-102  Objectives: This Article is found to be necessary and proper to the following
objectives:
1. 
To protect the general public from damage and injury which may be caused
by the faulty and unregulated construction of signs.
2. 
To prevent the obstruction of traffic visibility and confusion with traffic
control devices resulting from improperly placed and designed signs.
3. 
To ensure the visual quality of signs and preserve and promote aesthetic
quality in Seward County and the City of Kismet, Kansas.
24-103 Definitions: For the purpose of this Article, certain terms, phrases and words used
throughout this Article shall have the meaning assigned them in this section:
1. 
General:
a. 
ABANDONED SIGN: Any sign, including off-site signs unless owned and
operated by a bona fide billboard company, which no longer directs a
potential customer to or exhorts any person, or advertises a bona fide
business, project, product, service or activity.
b. 
DAMAGED SIGN: Any sign, including off-premise signs, damaged by any
means, more than fifty percent (50%) of its value.
c. 
FACADE: The entire exterior surface of a particular side of a structure or
establishment to be considered in the calculation of the maximum
gross surface area of a wall, roof or projecting sign or signs.
d. 
INDIRECTLY ILLUMINATED SIGN: Any sign which is partially or
completely illuminated at any time by a light source separate from the
sign housing which is so shielded as to not be visible at eye level.
21
PDF page 22

Open original PDF at page 22

e. 
MARQUEE: A permanent roofed structure attached to and supported by
the building and projecting over public property.
f. 
OFF-PREMISES SIGN: A sign delivering a message or advertisement
other than the name, occupation or nature of the activities conducted
on the premises or the products sold or manufactured thereon, and
shall include all billboard signs and political signs with a gross surface
area of more than thirty-two (32) square feet.
g. 
ON-PREMISES SIGN: A sign which carries only advertisement that is
incidental to a lawful use of the premises on which it is located,
including signs or sign devices indicating the business transacted,
services rendered, goods sold or produced on the premises, the rental
or lease of products or building space, and/or name of the person, firm
or corporation occupying the premises.
h. 
OWNER: Any person(s), firm(s), corporation(s), or any other legal entity
having legal title to or sufficient proprietary interest in a tract of land
(including leasehold interests) or a sign.
i. 
SEMI-ILLUMINATED SIGN: Any sign located on a building which building
face is uniformly illuminated over its entire area, including the area of
the sign, by use of electric or other artificial light. Semi-illuminated
signs shall be permitted in any location where illuminated signs are
permitted.
j. 
SIGN: Any advertising device or surface placed out-of-doors, on or off
premises, or placed inside a building when in view of the general public,
which conveys
information or identification. Included in this definition of "sign" shall
be any structure used for said display and all sign supports.
k. 
SIGN, GROSS SURFACE AREA OF: The gross surface area of a sign shall
be the sum of all surface areas of the sign faces that are visible from the
traveled way to which they face; except that ground or pole signs
designed as double-faced signs shall have only one face of the sign be
considered in determining the sign area. Each surface area shall
include the total area within a single continuous perimeter enclosing
the extreme limits of the sign elements.
l. 
SIGN AREA, MAXIMUM TOTAL GROSS SURFACE AREA: Maximum
allowed square footage of sign area permitted per zoning lot.
m. SIGN, HEIGHT: The height of a sign as measured from ground level at
the foundation of the sign to the highest element of the sign.
n. 
SIGN SETBACK: The horizontal distance between a sign and a front
and/or side lot line, as measured from that part of the sign, including its
extremities and supports, nearest to any point on an imaginary vertical
plane projecting from the front and/or side lot line.
o. 
SIGN STRUCTURE: An element or assemblage of elements which
supports or is capable of supporting a sign. A sign structure may be
22
PDF page 23

Open original PDF at page 23

free-standing, attached to a building, an integral part of the building, or
combination thereof.
p. 
VISIBILITY TRIANGLE: The triangular area formed by the intersecting
street right-of-way lines and a straight line joining said street right-of-
way lines at points which are thirty (30) feet distant from the point of
intersection, measured along said right-of-way lines.
q. 
ZONING ADMINISTRATOR: See Article 1.
2. 
Classification of Signs:
a. 
Functional Types of Signs:
(1)  
ADVERTISING SIGN: A sign which directs the attention of the
public to a business, commodity, service or entertainment
conducted, sold, or furnished at a location OTHER than the
premises on which the sign is located or to which it is affixed.
An advertising sign is also known as a billboard.
(2) 
ADVERTISING DECORATION: Any sign which has attached
various sign materials used for temporary display and
decoration, including streamers, banners, pennants,
pinwheels, commercial flags, bunting, and similar devices.
(3) 
BILLBOARD: An off-premise sign, or portion thereof, consisting
of outdoor signs which advertise, promote, or otherwise
disseminate information pertaining to goods, products, or
services, including charitable services, political services or
appeals, not related to goods, products, or services which
comprise a primary use on the premises where the sign is
located. Such signs include, but are not limited to:
(a) 
Poster panels or bulletins normally mounted on a
building wall or freestanding structure with advertising
copy in the form of pasted paper.
(b) 
Multi-prism signs, which are poster panels or bulletins
normally mounted on a building wall or freestanding
structure with advertising copy in the form of pasted
paper and alternating advertising message on the one
(1) display area.
(c) 
Painted bulletins, where the advertiser's message is
painted directly on the background of a wall-mounted
or freestanding display area.
(d) 
Off-premise signs on motor vehicles, trailers or other
structures not otherwise defined herein, when such
motor vehicle, trailer or other structure is used for
advertising purposes.
23
PDF page 24

Open original PDF at page 24

(4) 
BULLETIN BOARD SIGN: An on-premise sign containing the name of the
institution or organization, which may include names of persons
connected with it, announcing persons, events or activities occurring at
the institution or organization. Such signs may also present a greeting or
similar message.
(5) 
BUSINESS SIGN: A sign which directs attention to a business or
profession conducted, or to a commodity or service sold, offered or
manufactured, or to an entertainment offered on the premises where
the sign is located.
(6) 
CONSTRUCTION SIGN: A temporary on-premise sign indicating the
names of architects, engineers, landscape architects, contractors,
similar artisans, and financiers involved in the design and construction
of a structure or project during the period of construction.
(7) 
DIRECTIONAL SIGN: An on-premise sign containing words or symbols
indicating an entrance to, or exit from, a building as well as the location
of parking, loading, restrooms, and emergency entrances which are for
the convenience of the public.
(8) 
FARM/RANCH DIRECTIONAL SIGN: An off-site sign which provides
direction to the headquarters of the farm or ranch.
(9) 
FIRST AMENDMENT SIGN: A sign which gives a non-commercial opinion
of the sign owner and which is located on the property owned or
occupied by the owner of the sign.
(10) IDENTIFICATION SIGN: An on-premise sign giving the name and
address of a building, business, development or establishment.
(11) NAMEPLATE SIGN: An on-premise sign giving the name and/or address
of the owner or occupant of a building or premises on which it is
located, and where applicable, a professional title. Or in the case of a
farm or ranch, or a rural residence, a sign giving the name of the owner
or occupant, or of the farm or ranch, or other such similar identifying
name.
(12) OFFICIAL SIGN: A sign erected, maintained and owned by a public
entity within its own jurisdiction or, for a city or affiliated entity, within
three (3) miles of the city limits.
(13) POLITICAL SIGN: A sign pertaining to the announcement of an
individual being a candidate for an elective political office, or
addressing a position with respect to an official ballot question
appearing before the electorate. Any such sign exceeding thirty-two (32)
square feet of gross surface area shall be classified as an off-site sign
and regulated accordingly.
(14) PROJECT DIRECTORY SIGN: An on-premise sign containing the names
and locations, in list or map form, of the individual components making
up a planned unit development, shopping center, or similar project.
24
PDF page 25

Open original PDF at page 25

(15) PROJECT TITLE SIGN: An on-premise sign which carries the overall
name of a residential subdivision, shopping center, industrial park,
medical complex, unified development, manufactured home park, and
similar projects. A project title sign shall also include signs placed prior
to actual development designating the location as the “Future Home
Of...”, or similar message.
(16) REAL ESTATE SIGN: An on-premises sign displayed for the purpose of
offering real property for sale, lease or rent.
(17) REAL ESTATE DIRECTIONAL SIGN: 
An off-premise sign which
provides direction to the location where real estate is offered for sale or
lease.
(18) RURAL BUSINESS DIRECTIONAL SIGN: An off-premise sign which
provides direction to the location of a business.
(19) SERVICE SIGN: A sign which is owned by and displays information on a
non-profit, service, charitable and/or religious organization or group.
(20) SPECIAL SIGN: Any sign classified as a farm/ranch directional sign,
rural business sign and/or a service sign. These signs are permitted only
so long as they remain allowable under the Kansas Highway Advertising
Control Act as administered by the Kansas Department of
Transportation.
(21) TEMPORARY SIGN: Any on-premise sign, including, but not limited to,
signs of lightweight cardboard, airborne, plastic or paper material,
intended to be displayed for not more than sixty (60) days.
b. 
Structural Types of Signs:
(1) 
ARCH SIGN: Any sign located at the drive entrance to a farm, ranch or
rural residence, either adjacent to or arched over the drive entrance.
(2) 
AWNING SIGN: Any sign affixed directly on, painted on or attached to an
awning.
(3) 
CANOPY SIGN: Any sign affixed directly on, painted on or
attached to a canopy.
(4) 
COMMERCIAL BALLOON SIGN: An on-premise, temporary sign that is
inflated and exceeds five (5) square feet in area, as measured at the
largest cross-section, designed to advertise a specific product or
service sold, produced or conducted on the premises, on which
advertising copy, logos, symbols or emblems may or may not be
printed, painted or attached. Commercial balloon signs may be
tethered or mounted to a structure or the ground.
(5) 
DOUBLE-FACED SIGN: A sign having two faces or sides designed for
use as a sign message area.
(6) 
GROUND SIGN: A sign placed upon, or supported by the ground
independently of any building or structure on the property. This includes
25
PDF page 26

Open original PDF at page 26

a sign supported on poles or posts, whose base of the face is less than
six (6) feet above ground level.
(7) 
MARQUEE SIGN: Any sign mounted on, painted on or supported by a
marquee.
(8) 
POLE SIGN: A sign whose base of the face is six (6) feet or more above
ground level and is supported by poles or posts.
(9) 
PORTABLE SIGN: An on-site sign designed in such a manner to be
readily movable and not permanently attached to the property. Any non-
permanent sign not classed as a temporary sign shall be deemed to be
a portable sign.
(10) PROJECTING SIGN: Any sign that is wholly or partially attached to and
dependent upon a building for support and which projects more than
one (1) foot beyond the face of said building.
(11) ROOF SIGN: A sign mounted and supported wholly upon or over the
roof of any structure.
(12) WALL SIGN: A sign attached to or painted on a wall in such a manner
that the exposed face of the sign is in a plane approximately parallel to
the plane of the wall.
24-104 General Sign Requirements:
1. 
Traffic Safety: No sign shall be maintained at any location where it may
interfere with the view of, or where it may obstruct view of, or interfere with,
mislead or confuse traffic. Nor shall any sign be placed in the visibility
triangle as defined in these Regulations, or project into said area unless the
bottom edge of the projecting sign is at least ten (10) feet above the
centerline grade of the intersecting streets and the sign supports are
constructed to minimize the obstruction of the view of traffic.
2. 
Clearance from Electrical Power Lines: No metal ground sign shall be located
within eight (8) feet vertically and eight (8) feet horizontally of electrical wire
or conductors in free air carrying more than 48 volts, without regard to
whether or not such wires or conductors are insulated or otherwise
protected.
3. 
Illuminated Signs: Illuminated signs shall be shaded wherever necessary to
avoid casting bright light upon property located in any residential district or
upon any public street or park.
4. 
Use of Spotlights And Floodlights for Illumination: It shall be unlawful for any
person to have any sign which is wholly or partially illuminated by floodlights
or spotlights that interfere with the vision of pedestrians or vehicular traffic.
5. 
Flashing or Moving Signs: No flashing signs, rotating or moving signs,
animated signs, signs with moving lights, or signs which create the illusion of
movement shall be permitted. A sign whereon the current time and/or
temperature is indicated by intermittent lighting shall not be deemed to be a
26
PDF page 27

Open original PDF at page 27

flashing sign if the lighting changes are limited to the numerals indicating the
time and/or temperature not more often than five (5) seconds.
6. 
Signs Not To Be Located Within Public Right-of-Way: Any signs and supports
which are located upon or over the public right-of-way, including streets,
alleys and parkways, shall be prohibited; provided, however, the following
exceptions shall be allowed:
a. 
Signs and supports required by governmental authority.
b. 
Signs on commercial vehicles or commercial trailers which
denote the name and address of a bona fide business which
owns or leases said vehicle when these vehicles are lawfully
operated or parked and not used expressly for the purpose of
advertising a product, service or activity.
c. 
A temporary sign located on public property used to announce
a special event or activity when written authorization is granted
by the Zoning Administrator that the sign will not constitute a
traffic hazard or nuisance, and the sign is located in a proper
zone. The Zoning Administrator may utilize the opinions of
both the Sheriff and the County Engineer in making a
determination under this provision.
7. 
Obstruction to Exit: No sign shall be erected so as to obstruct any fire
escape, required exit, window, or door opening intended as a means of
egress.
8. 
Obstruction to Ventilation: No sign shall be erected which interferes with any
opening required for ventilation.
9. 
Signs on Trees or Utility Poles: No sign shall be attached to a tree or utility
pole whether on public or private property.
10. 
Corner and Through Lots: On corner and through lots, each lot line that abuts
a street or highway shall be considered a separate street frontage. On corner
and through lots, restrictions that are phrased in terms of "signs per zoning
lot" shall be deemed to permit the allowable number of signs facing each
street or highway that abuts the lot.
11. 
Maintenance Required: Signs shall be maintained so as to be structurally
sound and in a safe condition, and shall be kept in a state of undeteriorated
appearance by means of painting, sealing or coating and repair or
replacement of damaged parts, panels or lights. In addition, the premises
surrounding all ground signs shall be maintained by the owner thereof in a
sanitary and uncluttered condition, free and clear of all noxious substances,
rubbish, litter and weeds.
12. 
Clearance Drop Zone for Pole Signs: Pole signs shall be located so as to
provide a clearance drop zone in all directions such that the pole sign would
fall on the property on which it is located. This requires that the pole sign be
27
PDF page 28

Open original PDF at page 28

setback from all property lines a minimum distance equal to the height of the
pole sign.
13. 
Classification of Signs:
a. 
Functional Types:
(1) 
Advertising Sign or Billboard Sign
(2) 
Advertising Decoration Sign
(3) 
Bulletin Board Sign
(4) 
Business Sign
(5) 
Construction Sign
(6) 
Directional Sign
(7) 
Farm/Ranch Directional Sign
(8) 
First Amendment Sign
(9) 
Identification Sign
(10) 
Nameplate Sign
(11) 
Official Sign
(12) 
Political Sign
(13) 
Project Directory Sign
(14) 
Project Title Sign
(15) 
Real Estate Sign
(16) 
Real Estate Directional Sign
(17) 
Service Sign
(18) 
Special Sign
(19) 
Temporary Sign
b. 
Structural Types:
(1) 
Arch Sign
(2) 
Awning Sign
(3) 
Canopy Sign
(4) 
Commercial Balloon Sign
(5) 
Ground Sign
(6) 
Marquee Sign
(7) 
Pole Sign
(8) 
Portable Sign
(9) 
Projecting Sign
(10) 
Roof Sign
(11) 
Wall Sign
24-105 Procedural Requirements:
1. 
Permit: Except for signs listed in section 24-105 (6) of this section, no sign
shall be painted, constructed, erected, repainted, remodeled, relocated, or
28
PDF page 29

Open original PDF at page 29

expanded unless such sign complies with the requirements of these
Regulations. A sign permit shall be obtained from the Zoning Administrator
prior to construction of any sign. Fees for sign permits shall be as established
by resolution of the Governing Body.
2. 
Application for Permit: Application for a permit shall be made in writing upon
forms provided by the Zoning Administrator and shall contain, or have
attached, such information as the Zoning Administrator shall deem
necessary to show full compliance with this and all other applicable laws
and regulations of Seward County, Kansas. This may include drawings
indicating the sign legend or advertising message, location, dimensions,
construction and structural design. If the Zoning Administrator deems it
necessary, he may also require that a licensed engineer furnish information
concerning structural design of the sign and the proposed attachments. No
sign permit shall be issued until the appropriate fees have been paid.
3. 
Issuance of Permit: Upon the filing of an application for a sign permit, the
Zoning Administrator or designate shall examine such plans and
specifications, along with the premises upon which it is proposed to erect
the sign, and other pertinent data, to determine if the provisions of the Sign
Regulations of Seward County, Kansas, are complied with. If all such
requirements are met, the permit shall be issued. If the work authorized by
such permit is not started within 90 days from the date of its issuance, such
permit shall become null and void. The issuance of the Sign Permit as
required by these Regulations shall not act in lieu of any other permits or fees
required by any other provisions of these Regulations or any other rules or
regulations applicable to such sign and its placement.
4. 
Permit Revocation: If the Zoning Administrator shall find that any sign subject
to this Article is unsafe or structurally unsound, is a menace to the public, or
has been constructed or erected or is being maintained in violation of the
provisions of this Article, written notice shall be given to the owner,
occupant, or person-in-charge, specifying the problem. If such person fails
to remove or alter the sign so as to comply with the provisions of this Article
within thirty (30) days of such notice, the Zoning Administrator may cause
such sign to be removed or altered to comply with this Article.
5. 
Sign Removal:
A. 
All abandoned signs and their supports shall be removed within thirty
(30) days from the date of notification of abandonment by the Zoning
Administrator. The Zoning Administrator may grant a time extension
not exceeding an additional thirty (30) days for an abandoned, non-
damaged sign. All signs structurally damaged shall be repaired or
removed within thirty (30) days of the date of notification by the Zoning
Administrator.
B. 
If the owner, occupant, or person-in-charge, after due notice, fails or
refuses to correct a violation of this Article, the Zoning Administrator
29
PDF page 30

Open original PDF at page 30

shall cause such signs and their supports to be demolished and
removed. If such sign cannot be demolished because it is painted on
a building or other non-sign structure, such sign shall be painted over
or removed by sandblasting.
C. 
When in the opinion of the Zoning Administrator any sign is in such
condition as to constitute an imminent hazard requiring immediate
action to protect the public, he may erect barricades or cause the sign
to be taken down, repaired, shored, or otherwise made safe without
delay. Such action, under such circumstances, may be taken without
prior notice to or hearing of the owner, agents, leinholders, and
occupants.
D. 
Any cost incurred by the County or City associated with the
demolition, removal or repair of any sign under the provisions of this
Code shall be levied, certified, and collected as a special assessment
against the lot or tract of ground upon which the sign was located.
Said assessment, if not paid when due, shall be certified to the
County or City Clerk for collection with other special assessments.
6. 
Exemptions From Permits: The following signs shall be exempt from paying
fees and obtaining a sign permit; however such signs shall be subject to the
Sign Regulations. (This exemption shall not be construed as relieving the
owner of the sign from the responsibility for its meeting the structural and
maintenance requirements as specified in these Regulations):
a. 
Real estate sign advertising the sale, rental or lease of the premises on
which the sign is displayed, with the following limitations: One (1)
unlighted sign per street frontage per listing, provided that a maximum
of six (6) real estate signs be permitted on a zoning lot.
b. 
Real estate directional sign not exceeding six (6) square feet in area.
c. 
Advertising decoration signs, and any indoor signs, even though such
signs may be visible from the outside of the building.
d. 
No more than two (2) temporary on-site signs placed in or upon
windows of a commercial or industrial building, whether painted or
attached.
e. 
Nonelectrical nameplates not exceeding two (2) square feet in area.
f. 
Nonelectrical construction signs denoting the architect, engineer or
contractor when placed upon work under construction, and not
exceeding thirty two (32) square feet in area.
g. 
Nonelectrical identification signs.
h. 
Nonelectrical arch nameplate signs.
i. 
Nonelectrical memorial signs or tablets giving names of persons or
buildings and date of erection not to exceed twenty-five (25) square feet
in size.
30
PDF page 31

Open original PDF at page 31

j. 
Project title signs for subdivision identification, both on-site and off-
site, subject to the following conditions:
(1) 
On-site signs shall be allowed as long as lots remain vacant
within the subdivision. Off-site signs shall be allowed for a
maximum of two (2) years; however the Zoning Administrator
may grant six (6) month extensions until the subdivision is
seventy percent (70%) sold to either a builder or an individual
buyer.
(2) 
On-site and off-site signs shall be unlighted; shall be neither
reflective nor fluorescent; and shall be used exclusively for the
purpose of advertising the subdivision.
(3) 
No sign shall be authorized until the final subdivision plat has
been duly recorded.
(4) 
On-site signs shall be located at or near entrances to the
portion of the subdivision under construction, and not more
than two (2) sign structures shall be maintained in any one (1)
subdivision less than forty (40) acres in
size. For each additional forty (40) acres or fraction thereof, one (1)
additional sign may be erected.
(5) 
Off-site signs shall be located on the most direct routes from
the major road network to the location of the subdivision.
However, when said off-site sign is located along a highway
that is regulated by the billboard provisions of this Article, the
location of such off-site sign shall be subject to the billboard
provisions of this Article.
(6) 
The maximum area shall be one hundred twenty eight (128)
square feet for each sign.
(7) 
The maximum length of any sign shall be sixteen (16) feet.
k. 
Signs of a duly constituted governmental body, including directional
signs for public buildings and uses, traffic or similar regulatory devices,
legal notices, warnings at railroad crossings, and other instructional or
regulatory signs having to do with health, hazards, parking, swimming,
dumping and other similar signs.
l. 
Advertising decorations, temporarily displayed during special event
periods only, such as grand openings, holidays, carnivals and the like,
with a limit of twelve (12) such events and a total time limitation of eight
(8) weeks within any calendar year for any business or institution.
m. Auction signs placed along roads and highways on private property
advertising auctions off said roads or highways; provided, said signs
shall not be placed more than thirty (30) days prior to said auction and
shall be removed within seven (7) days of the completion of said
31
PDF page 32

Open original PDF at page 32

auction or sale. Said signs shall not be more than thirty two (32) square
feet in area and shall not be illuminated.
n. 
Political signs, when located on private property with the permission of
the owner or tenants, provided that not more than four (4) signs shall be
allowed for each street frontage per zoning lot. Total area of all signs
shall not exceed sixty-four (64) square feet per zoning lot. All signs shall
be removed within seven (7) days following the election in which the
candidate is elected to office or is eliminated from further participation
in the election as a candidate, of after a ballot question has been
decided.
o. 
Flags or emblems of a government or of a political, civic, philanthropic,
educational or religious organization, displayed on private property, but
only if the flag or emblem is used solely as an identifying symbol and
does not include advertising language.
p. 
Address numerals and other signs required to be maintained by law or
governmental order, rule or regulation, provided that the content and
size of the sign do not exceed the requirements of such law, order, rule
or regulation.
q. 
Such additional signs as "No Hunting," "No Fishing," "No Trespassing"
and other like signs.
7. 
Exemption From Fees: The signs listed below shall be exempt from paying
fees; however, a permit shall be obtained and they shall be subject to the
Sign Regulations. This exemption shall not be construed as relieving the
owner of the sign from the responsibility for its meeting the structural and
maintenance requirements as specified in these Regulations.
a. 
Nonelectrical bulletin boards not exceeding thirty two (32) square feet
in area for public, educational, charitable, fraternal or religious
institutions when such sign is located on the premises of such
institution.
b. 
Directional and special signs.
24-106 Design and Construction Standards: The design and construction of signs and sign
structures shall be subject to the following standards:
1. 
Ground Signs:
a. 
Letters, Materials to be Secured: All letters, figures, characters, or
representations in cutout or irregular form maintained in conjunction
with, attached to, or superimposed upon any ground sign shall be safely
and securely built or attached to the sign's structure.
32
PDF page 33

Open original PDF at page 33

2. 
Projecting Signs: The following provisions shall apply only within the City of
Kismet, Kansas.
a. 
Removable Parts to be Secured: Any removable parts of projecting
signs, such as a cover of a service opening, shall be securely fastened
by safety chains or hinges.
b. 
Location: The horizontal clearance between a projecting sign and the
curb line shall be not less than two (2) feet. A projecting sign projecting
more than two-thirds of the distance from the property line to the curb
line shall be not less than ten (10) feet above the ground or pavement
below. A projecting sign projecting less than two-thirds of the distance
from the property line to the curb line shall be not less than eight (8) feet
above the ground or pavement below.
c. 
Awnings: Awnings, whether used as a sign or not, may extend over
public property not more than seven (7) feet from the face of a
supporting building but no portion shall extend nearer than two (2) feet
to the face of the nearest curb line measured horizontally. In no case
shall the awning extend over public property greater than two-thirds of
the distance from the property line to the nearest curb in front of the
building site.
24-107 District Regulations:
1. 
Seward County Agricultural and Single-Family Residential Districts: The
following types of signs, along with applicable size, height, and setback
requirements in districts zoned "AG", “AR”, "RR", "SR", "R-1" and "V-1", are
permitted:
a. 
Functional Types:
(1) 
Advertising Decoration Sign.
(2) 
Bulletin Board Sign, except for single-family dwellings.
(3) 
Business Sign for permitted home occupation.
(4) 
Construction Sign.
(5) 
Directional Sign, except for single-family dwellings.
(6) 
First Amendment Sign.
(7) 
Identification Sign.
(8) 
Nameplate Sign.
(9) 
Official Sign.
(10) 
Political Sign.
(11) 
Project Directory Sign.
(12) 
Project Title Sign.
(13) 
Real Estate Sign.
(14) 
Real Estate Directional Sign.
33
PDF page 34

Open original PDF at page 34

(15) 
Special Sign.
(16) 
Temporary Sign.
b. 
Structural Types:
(1) 
Arch Sign.
(2) 
Ground Sign.
(3) 
Wall Sign.
c. 
Number of Signs Permitted: No more than one (1) ground sign and one
(1) wall sign shall be permitted for each zoning lot having frontage on a
public right-of-way, regardless of the functional type of sign; provided,
however, that project title signs shall be permitted as authorized by
Article 24-105(6)(j) of these Regulations in addition to the sign
restrictions listed above.
d. 
Maximum Gross Surface Area:
(1) 
Advertising Decoration Sign: Eight (8) square feet per sign.
(2) 
Bulletin Board Sign: Twenty-five (25) square feet per sign.
(3) 
Business Sign: Eight (8) square feet per sign.
(4) 
Construction Sign: Thirty-two (32) square feet per sign.
(5) 
Directional Sign: Eight (8) square feet per sign.
(6) 
First Amendment Sign: Thirty-two (32) square feet per sign.
(7) 
Identification Sign: Eight (8) square feet per sign.
(8) 
Nameplate Sign: Four (4) square feet per sign.
(9) 
Official Sign: One hundred (100) square feet per sign.
(10) 
Political Sign: Thirty-two (32) square feet per sign.
(11) 
Project Directory Sign: Sixty-four (64) square feet per sign.
(12) 
Project Title Sign: One hundred twenty eight (128) square feet
per sign.
(13) 
Real Estate Sign: Eight (8) square feet per sign.
(14) 
Real Estate Directional Sign: Eight (8) square feet per sign.
(15) 
Special Sign: The maximum size of the sign at those locations
subject to the Highway Beautification Act of Kansas shall
conform to the “Rural Business Directional Sign Policy” of the
Kansas Department of Transportation. For all other locations,
the maximum size of the sign shall be eight (8) square feet per
sign.
(16) 
Temporary Sign: Eight (8) square feet per sign.
d. 
Maximum Height:
(1) 
For Arch Signs: Fifteen (15) feet.
34
PDF page 35

Open original PDF at page 35

(2) 
For Ground Signs: Six (6) feet.
(3) 
For Wall Signs: Not higher than the height of the top or ends of
the wall section to which the sign is attached or affixed. In no
case shall the sign be permitted to be placed on the roof.
e. 
Required Setback: Unless otherwise provided within this Article, no
sign shall project beyond the property line of the lot on which it is
located along all street frontages; nor closer than ten (10) feet from any
side or rear property line.
f. 
Illumination: No sign shall be illuminated, except that Bulletin Board
and Identification signs may be lighted indirectly with incandescent or
fluorescent lights.
2. 
City of Kismet Residential Districts: The following types of signs, along with
applicable size, height, and setback requirements in districts zoned "R-1A", “R-1B”
and “RP-2” are permitted:
a. 
Functional Types:
(1) 
Advertising Decoration Sign.
(2) 
Bulletin Board Sign, except for single-family dwellings.
(3) 
Business Sign for permitted home occupation.
(4) 
Construction Sign.
(5) 
Directional Sign, except for single-family dwellings.
(6) 
First Amendment Sign.
(7) 
Identification Sign.
(8) 
Nameplate Sign.
(9) 
Official Sign.
(10) 
Political Sign.
(11) 
Project Directory Sign.
(12) 
Project Title Sign.
(13) 
Real Estate Sign.
(14) 
Real Estate Directional Sign.
(15) 
Special Sign.
(16) 
Temporary Sign.
b. 
Structural Types:
(1) 
Ground Sign.
(2) 
Wall Sign.
c. 
Number of Signs Permitted: No more than one (1) ground sign and one
(1) wall sign shall be permitted for each zoning lot having frontage on a
public right-of-way, regardless of the functional type of sign; provided,
35
PDF page 36

Open original PDF at page 36

however, that project title signs shall be permitted as authorized by
Article 24-105(6)(j) of these Regulations in addition to the sign
restrictions listed above.
d. 
Maximum Gross Surface Area:
(1) 
Advertising Decoration Sign: Eight (8) square feet per sign.
(2) 
Bulletin Board Sign: Twenty-five (25) square feet per sign.
(3) 
Business Sign: Eight (8) square feet per sign.
(4) 
Construction Sign: Thirty-two (32) square feet per sign.
(5) 
Directional Sign: Eight (8) square feet per sign.
(6) 
First Amendment Sign: Thirty-two (32) square feet per sign.
(7) 
Identification Sign: Eight (8) square feet per sign.
(8) 
Nameplate Sign: Four (4) square feet per sign.
(9) 
Official Sign: One hundred (100) square feet per sign.
(10) 
Political Sign: Thirty-two (32) square feet per sign.
(11) 
Project Directory Sign: Sixty-four (64) square feet per sign.
(12) 
Project Title Sign: One hundred twenty eight (128) square feet
per sign.
(13) 
Real Estate Sign: Eight (8) square feet per sign.
(14) 
Real Estate Directional Sign: Eight (8) square feet per sign.
(15) 
Special Sign: The maximum size of the sign at those locations
subject to the Highway Beautification Act of Kansas shall
conform to the “Rural Business Directional Sign Policy” of the
Kansas Department of Transportation. For all other locations,
the maximum size of the sign shall be eight (8) square feet per
sign.
(16) 
Temporary Sign: Eight (8) square feet per sign.
d. 
Maximum Height:
(1) 
For Ground Signs: Six (6) feet.
(2) 
For Wall Signs: Not higher than the height of the top or ends of
the wall section to which the sign is attached or affixed. In no
case shall the sign be permitted to be placed on the roof.
e. 
Required Setback: Unless otherwise provided within this Article, no
sign shall project beyond the property line of the lot on which it is
located along all street frontages; nor closer than five (5) feet from any
side or rear property line.
f. 
Illumination: No sign shall be illuminated, except that Bulletin Board
and Identification signs may be lighted indirectly with incandescent or
fluorescent lights.
36
PDF page 37

Open original PDF at page 37

3. 
City of Kismet Commercial Office District: The following types of signs, along with
applicable size, height, and setback requirements in the district zoned "CP-0”, are
permitted:
a. 
Functional Types:
(1) 
Advertising or Billboard Sign, subject to the provisions of
Section 24-107(9) herein.
(2) 
Advertising Decoration Sign.
(3) 
Bulletin Board Sign.
(4) 
Business Sign.
(5) 
Construction Sign.
(6) 
Directional Sign.
(7) 
First Amendment Sign.
(8) 
Identification Sign.
(9) 
Nameplate Sign.
(10) 
Official Sign.
(11) 
Political Sign.
(12) 
Project Directory Sign.
(13) 
Project Title Sign.
(14) 
Real Estate Sign.
(15) 
Real Estate Directional Sign.
(16) 
Special Sign.
(17) 
Temporary Sign.
b. 
Structural Types:
(1) 
Awning and Canopy Sign.
(2) 
Commercial Balloon Sign.
(3) 
Ground Sign.
(4) 
Pole Sign.
(5) 
Projecting Sign.
(6) 
Wall Sign.
c. 
Number of Signs Permitted: The following standards shall apply.
(1) 
Awning and Canopy Signs, Projecting Signs, and Wall Signs: No
limit on the number of individual signs allowed on each
building elevation having street frontage or fronting on a
parking area; however the total area covered shall not be
greater than twenty percent (20%) of each building elevation or
more than two hundred (200) square feet in area, which ever is
less.
37
PDF page 38

Open original PDF at page 38

(2) 
Advertising or Billboard Signs: See section 24-107(9) of this
Article.
(3) 
Commercial Balloon Signs: See section 24-107(8) of this
Article.
(4) 
Ground Signs and Pole Signs: Lots with 200 feet or less of
public street frontage shall be permitted one sign. Lots with
more than 200 feet of public street frontage shall be permitted
more than one sign provided that a minimum separation of 150
feet shall be maintained between ground or pole signs on the
same zoning lot. Further, a minimum separation of 50 feet shall
be maintained between ground or pole signs on adjoining lots
along the same public street frontage.
(5) 
Project Title Signs: Shall be permitted as authorized by Section
24- 105(6)(j) of this Code.
d. 
Maximum Gross Surface Area: The combined area of all signs shall not
exceed two (2) square feet of area for each lineal frontage foot on the
zoning lot, provided no single sign shall exceed a gross surface area of
two hundred (200) square feet. In addition, the maximum size of the
sign at those locations subject to the Highway Beautification Act of
Kansas shall conform to the “Rural Business Directional Sign Policy” of
the Kansas Department of Transportation. For all other locations, the
maximum size of the sign shall be eight (8) square feet per sign.
e. 
Maximum Height: No sign shall exceed twenty-five (25) feet in height,
except for the following conditions:
(1) 
For Wall Signs: Not higher than the height of the top or ends of
the wall section to which the sign is attached or affixed. In no
case shall the sign be permitted to be placed on the roof.
f. 
Required Setback: Unless otherwise provided within this Article, no
sign shall project beyond the property line of the lot on which it is
located along all street frontages; nor closer than five (5) feet from any
side or rear property line.
g. 
Illumination: Illuminated shall be permitted.
4. 
City of Kismet General Commercial Districts: The following types of signs, along
with applicable size, height, and setback requirements in districts zoned "CP-1",
"CP-2" and "CP-3", are permitted:
a. 
Functional Types:
(1) 
Advertising or Billboard Sign, subject to the provisions of
Section 24-107(9) herein.
38
PDF page 39

Open original PDF at page 39

(2) 
Advertising Decoration Sign.
(3) 
Bulletin Board Sign.
(4) 
Business Sign.
(5) 
Construction Sign.
(6) 
Directional Sign.
(7) 
First Amendment Sign.
(8) 
Identification Sign.
(9) 
Nameplate Sign.
(10) 
Official Sign.
(11) 
Political Sign.
(12) 
Project Directory Sign.
(13) 
Project Title Sign.
(14) 
Real Estate Sign.
(15) 
Real Estate Directional Sign.
(16) 
Special Sign.
(17) 
Temporary Sign.
b. 
Structural Types:
(1) 
Awning and Canopy Sign.
(2) 
Commercial Balloon Sign.
(3) 
Ground Sign.
(4) 
Pole Sign.
(5) 
Projecting Sign.
(6) 
Wall Sign.
c. 
Number of Signs Permitted: The following standards shall apply.
(1) 
Awning and Canopy Signs, Projecting Signs, and Wall Signs: No
limit on the number of individual signs allowed on each
building elevation having street frontage or fronting on a
parking area; however the total area covered shall not be
greater than twenty percent (20%) of each building elevation or
more than two hundred (200) square feet in area, which ever is
less.
(2) 
Advertising or Billboard Signs: See section 24-107(9) of this
Article.
(3) 
Commercial Balloon Signs: See section 24-107(8) of this
Article.
(4) 
Ground Signs and Pole Signs: Lots with 200 feet or less of
public street frontage shall be permitted one sign. Lots with
more than 200 feet of public street frontage shall be permitted
more than one sign provided that a minimum separation of 150
feet shall be maintained between ground or pole signs on the
39
PDF page 40

Open original PDF at page 40

same zoning lot. Further, a minimum separation of 50 feet shall
be maintained between ground or pole signs on adjoining lots
along the same public street frontage.
(5) 
Project Title Signs: Shall be permitted as authorized by Section
24-105(6)(j) of this Code.
d. 
Maximum Gross Surface Area: The combined area of all signs shall not
exceed two (2) square feet of area for each lineal frontage foot on the
zoning lot, provided no single sign shall exceed a gross surface area of
two hundred (200) square feet. In addition, the maximum size of the
sign at those locations subject to the Highway Beautification Act of
Kansas shall conform to the “Rural Business Directional Sign Policy” of
the Kansas Department of Transportation. For all other locations, the
maximum size of the sign shall be eight (8) square feet per sign.
e. 
Maximum Height: No sign shall exceed thirty-five (35) feet in height,
except for the following conditions:
(1) 
For Wall Signs: Not higher than the height of the top or ends of
the wall section to which the sign is attached or affixed. In no
case shall the sign be permitted to be placed on the roof.
f. 
Required Setback: Unless otherwise provided within this Article, no
sign shall project beyond the property line of the lot on which it is
located along all street frontages; nor closer than five (5) feet from any
side or rear property line.
g. 
Illumination: Illuminated shall be permitted.
5. 
City of Kismet Industrial Districts: The following types of signs, along with applicable
size, height, and setback requirements in districts zoned "IP-1" and "IP-2" are
permitted:
a. 
Functional Types:
(1) 
Advertising or Billboard Sign, subject to the provisions of
Section 24-107(9) herein.
(2) 
Advertising Decoration Sign.
(3) 
Bulletin Board Sign.
(4) 
Business Sign.
(5) 
Construction Sign.
(6) 
Directional Sign.
(7) 
First Amendment Sign.
(8) 
Identification Sign.
(9) 
Nameplate Sign.
40
PDF page 41

Open original PDF at page 41

(10) 
Official Sign.
(11) 
Political Sign.
(12) 
Project Directory Sign.
(13) 
Project Title Sign.
(14) 
Real Estate Sign.
(15) 
Real Estate Directional Sign.
(16) 
Special Sign.
(17) 
Temporary Sign.
b. 
Structural Types:
(1) 
Awning and Canopy Sign.
(2) 
Commercial Balloon Sign.
(3) 
Ground Sign.
(4) 
Pole Sign.
(5) 
Projecting Sign.
(6) 
Wall Sign.
c. 
Number of Signs Permitted: The following standards shall apply.
(1) 
Awning and Canopy Signs, Projecting Signs, and Wall Signs: No
limit on the number of individual signs allowed on each
building elevation having street frontage or fronting on a
parking area; however the total area covered shall not be
greater than twenty percent (20%) of each building elevation or
more than three hundred (300) square feet in area, which ever
is less.
(2) 
Advertising or Billboard Signs: See section 24-107(9) of this
Article.
(3) 
Commercial Balloon Signs: See section 24-107(8) of this
Article.
(4) 
Ground Signs and Pole Signs: Lots with 200 feet or less of
public street frontage shall be permitted one sign. Lots with
more than 200 feet of public street frontage shall be permitted
more than one sign provided that a minimum separation of 150
feet shall be maintained between ground or pole signs on the
same zoning lot. Further, a minimum separation of 50 feet shall
be maintained between ground or pole signs on adjoining lots
along the same public street frontage.
(5) 
Project Title Signs: Shall be permitted as authorized by Section
24-105(6)(j) of this Code.
d. 
Maximum Gross Surface Area: The combined area of all signs shall not
exceed two (2) square feet of area for each lineal frontage foot on the
41
PDF page 42

Open original PDF at page 42

zoning lot, provided no single sign shall exceed a gross surface area of
three hundred (300) square feet. In addition, the maximum size of the
sign at those locations subject to the Highway Beautification Act of
Kansas shall conform to the “Rural Business Directional Sign Policy” of
the Kansas Department of Transportation. For all other locations, the
maximum size of the sign shall be eight (8) square feet per sign.
e. 
Maximum Height: No sign shall exceed thirty-five (35) feet in height,
except for the following conditions:
(1) 
For Wall Signs: Not higher than the height of the top or ends of
the wall section to which the sign is attached or affixed. In no
case shall the sign be permitted to be placed on the roof.
f. 
Required Setback: Unless otherwise provided within this Article, no
sign shall project beyond the property line of the lot on which it is
located along all street frontages; nor closer than ten (10) feet from any
side or rear property line.
g. 
Illumination: Illuminated shall be permitted.
6. 
Planned Unit Developments and Conditional Uses: All signs permitted within this
Article shall be available within any property zoned as a Planned Unit Development,
or subject to a Conditional Use Permit; provided that alternative or additional
requirements concerning the type, size, height and location of any signs may be
established on specific sites upon the approval of the Planned Unit Development or
the Conditional Use Permit by the governing body having jurisdiction.
7. 
Portable Signs: Portable signs shall conform to the following regulations:
A. 
Portable signs shall only be permitted in any zoning district within the
unincorporated portion of Seward County, subject to the provisions of C.
below.
B. 
Portable signs shall only be permitted in the "CP-1", "CP-2", "CP-3", "IP-1", and
"IP-2" districts within the City of Kismet, Kansas.
C. 
Portable signs shall be setback a minimum of five (5) feet as measured from
the curb or roadway line to the nearest extremities of the sign, and shall not
be located so as to hinder visibility or interfere with the free and safe
movement of traffic.
8. 
Commercial Balloon Signs: Where permitted, commercial balloon signs shall be
subject to the following provisions:
A. 
Commercial balloon signs shall be limited to one balloon sign per zoning lot
at any given time.
42
PDF page 43

Open original PDF at page 43

B. 
Commercial balloon signs shall be limited to a maximum of 160 square feet
in area as measured at the largest cross section.
C. 
Commercial balloon signs shall be limited to seven (7) day permits issued no
more than four (4) times per calendar year.
D. 
Commercial balloon signs shall be limited in height to a maximum of forty-
five (45) feet above grade when mounted or tethered on a roof or structure,
and to twenty-five (25) feet above grade when mounted on or tethered to the
ground.
E. 
Commercial balloon signs shall be located no closer than one hundred (100)
feet to the nearest lot line of any “RR”, “SR”, “R-1”, “V-1”, “R-1A”, “R-1B” or
“RP-2” zoning district.
F. 
Commercial balloon signs must be anchored and/or tethered in accordance
with the commercial balloon sign manufacturer’s recommendations.
G. 
Commercial balloon signs must be deflated and properly secured when wind
speeds exceed forty (40) miles per hour or the manufacturer’s maximum
wind speed, whichever is less.
H. 
Commercial balloon signs shall be located no closer than five hundred (500)
feet to any hospital helicopter landing pad.
I. 
Commercial balloon signs shall be located in accordance with all applicable
Federal Aviation Administration regulations.
J. 
Any gas used in commercial balloon signs must be non-combustible.
K. 
Commercial balloon signs shall be fire retardant.
L. 
Commercial balloon signs shall be located no closer than the height of the
commercial balloon sign plus ten (10) feet from any electric power
transmission line.
9. 
Billboard Signs: Advertising or billboard signs shall be permitted only on property in
the unincorporated portion of Seward County when said sign is identified on an
approved development plan associated with a Conditional Use Permit, or within the
City of Kismet on property zoned “CP-0”, “CP-1”, “CP-2”, “CP-3”, “IP-1” or “IP-2”.
A. 
All advertising or billboard signs shall conform to the following requirements:
(1) 
Advertising or billboard signs shall be located a minimum of seventy-
five (75) feet from a residential structure.
(2) 
Advertising or billboard signs shall be erected so that all elements of
the sign and its structure remain on or over the lot on which the sign is
constructed. No portion of any billboard sign shall encroach upon or
over, or project over any public right-of-way.
(3) 
Advertising or billboard signs shall have a maximum height of thirty-
five (35) feet.
(4) 
All lighting of advertising or billboard signs shall be so shielded as not
to produce intensive or excessive light or glare on adjacent property or
roadways.
43
PDF page 44

Open original PDF at page 44

(5) 
All advertising or billboard signs shall be free-standing structures only.
(6) 
All advertising or billboards signs shall be limited to one advertising
face per direction.
B. 
In addition to the requirements of 24-107(9)(A) above, advertising or billboard
signs erected along or intended to be viewed from US 51, US 54, US 56, US
83, US 160 or K190 shall be subject to the following additional requirements:
(1) 
The gross surface area of any advertising or billboard sign shall not
exceed 800 square feet, not including cut-outs and embellishments,
which may not exceed ten percent (10%) of the face area of the
advertising or billboard. In addition, the maximum vertical dimension
of an advertising or billboard sign shall be twenty (20) feet and the
maximum horizontal dimension of an advertising or billboard sign
shall be sixty (60) feet, including cut-outs and embellishments.
(2) 
There shall be a minimum separation of 500 feet between all
advertising or billboard signs erected along or facing all of US 51, US
54, US 56, US 83 or US 160.
(3) 
There shall be a minimum separation of 300 feet between all
advertising or billboard signs erected along or facing all of K190.
C. 
In addition to the requirements of 24-107(9)(A) above, advertising or billboard
signs erected along or intended to be viewed from the rural major collector
and/or rural minor collector roads in the unincorporated portion of Seward
County shall be subject to the following additional requirements.
(1) 
The gross surface area of any advertising or billboard sign shall not
exceed one hundred sixty (160) square feet, not including cut-outs
and embellishments, which may not exceed twenty-five percent
(25%) of the face area of the advertising or billboard. In addition, the
maximum vertical dimension of an advertising or billboard sign shall
be ten (10) feet and the maximum horizontal dimension of an
advertising or billboard sign shall be twenty (20) feet. The total
maximum height of the structure shall not exceed twenty-five (25)
feet.
(2) 
There shall be a minimum separation of 1,320 feet between all
advertising or billboard signs along the paved roads on the County
Highway System.
(3) 
Advertising or billboard signs may be located on property in any
zoning district by the approval of a Conditional Use, provided the
zoning lot on which it is located is at least forty (40) acres in size.
D. 
Advertising or billboard signs proposed to be erected along or intended to be
viewed from rural local roads shall be allowed only upon approval of a
44
PDF page 45

Open original PDF at page 45

Conditional Use Permit for such advertising or billboard sign following the
procedures for Conditional Use Permit approval contained within these
Regulations.
24-108 Nonconforming Signs: Every sign in existence at the time these Sign Regulations
become effective may continue in existence subject to the following:
1. 
It shall not be altered structurally or moved unless it is made to comply with
the provisions of these Regulations. However, the changing of the movable
parts of an existing sign that is designed for such changes, or the repainting
or changing of display matter shall not be deemed a structural alteration.
2. 
The lawful use of a sign existing on the effective date of these Regulations,
although such sign does not conform to the provisions hereof, may continue;
but if usage of such sign is discontinued for a period of six months, any future
use of such sign shall be in conformity with the provisions of these
Regulations.
3. 
No sign which has been damaged by fire, wind, explosion, or act of God to
the extent that 50 percent or more of the sign is destroyed, shall be restored
except in conformity with these Regulations. Any sign which has been
damaged to an extent less than 50 percent may be restored to its condition
which existed as a nonconforming use prior to its damage.
45
PDF page 46

Open original PDF at page 46

EXHIBIT B THRESHER DEVELOPMENT PLAN
CU2025-02 Thresher Wind Project Development Plan Terms
(based on September 16, 2025 application to Seward County and approved February 23, 2026 
by the Seward County Planning Commission )
This document provides (below in bold) the text from the Seward County Zoning Regulations Articles 
20 and 27 (“Regulations”), of required Development Plan (“DP”) terms. Under each Regulations 
requirement is text denoted as “Thresher Response” and sometimes as “Pertinent Text”, which text is 
the applicable portion of the Thresher Wind Project’s (“Thresher”) Wind Energy Conversion System 
Conditional Use Permit and Development Plan Application (“Application”) that the Zoning 
Administrator found answering to that respective DP requirement.
This document constitutes the entire Thresher Wind Project Development Plan text approved by the 
Planning Commission, meaning no other DP rights, terms, or changes, are approved by the Planning 
Commission at this time. All DP rights and terms remain subject to all other applicable Seward 
County Zoning Regulations, as well as applicable federal and state laws and regulations (collectively, 
“Laws”). If any conflict between any Law or this DP or the CUP relying on this DP, the most 
favorable to the County or most restrictive to Thresher will apply. The DP assumes the Application 
accuracy and completeness of all required information without any independent verification by 
Seward County, and the County may elect in its sole discretion to void any pertinent term of this DP 
that in part was based on any inaccurate or incomplete portion of the Application. Because several 
required DP elements are missing from the Application, the DP must be updated pursuant to 
Regulation 20-105 before any improvement or other site work or grading of land included in this DP 
may occur, which DP updates are subject to Planning Commission approval (the updates are not 
minor adjustments subject only to Zoning Administrator review).
Section 20-103 Development Plan Requirements
(“The development plan shall include and/or display the following information:”)
1. A topographic survey indicating the legal description, property boundary, existing
contours, existing utilities and easements, and natural and manmade features of the property.
Thresher Response: Appendix F to Application, which is attached and incorporated into this DP 
(“Appendix F”). See also Appendix A for legal description information.
The boundaries of the wind project are shown in red. Existing easement areas were not included, 
so the DP requires those easements to be identified as part of any application to construct any 
improvement or other site work or grading of land included in this DP.
2. A Development Plan, drawn to the same scale as the topographic survey, indicating:
Thresher Response: Appendix F.
a. Existing contours (shown as dashed lines);
Thresher Response: Appendix F
b. Proposed contours (shown as solid lines);
Page 1 of 6
46
PDF page 47

Open original PDF at page 47

No proposed contour changes included in the Application, so the DP does not 
grant any contour changes.
c. Location and orientation of all existing and proposed buildings;
Thresher Response: Appendix F as to existing structures.
No proposed buildings included in the Application, so the DP does not grant any 
rights to construct new buildings.
d. Areas to be used for parking, including the number and arrangement of stalls;
Pertinent Text from Application: “In addition, parking will be restricted to 
designated areas and signs posted in strategic locations to provide information 
related to fire risks, emergency response procedures and contact numbers for fire 
emergencies.” Application Section 2.4, Page 14.
But, no parking stall count or arrangement was included as required by the 
Regulations, so the DP does not grant any parking rights.
e. Areas to be developed for screening, including the location of plant materials,
and screening structures and features;
Thresher Response: Not Applicable.
Thus, the DP does not include any screening.
f. Pedestrian and vehicular circulation, and their relationship to existing streets,
alleys, or public right-of-way;
Thresher Response: Application Section 3.2; Appendix F. Pertinent Text from 
Application: “County and township roads that run coincident with section lines 
characterize the majority of the existing roadway infrastructure in and around the 
Project area. County and township roads that run coincident with section lines 
characterize the majority of the existing roadway infrastructure in and around the 
Project area. US-83 extends north-south to the west of the Project area and Highway 
160 extends east-west to the south of the Project area. Turbine components will be 
transported to the Project area via US-56 and US-83, and/or State Route 160. 
County roads will then be used within the Project area. The project will construct 
access roads on private land to connect the turbine sites to the nearest public road.” 
Section 3.2., Page 17.
The DP includes the access roads on private land and their relationship to existing 
roads as shown in light blue in Appendix F. The DP does not include any other 
pedestrian or vehicular rights to access public roads or right-of-way.
g. Points of ingress and egress;
47
PDF page 48

Open original PDF at page 48

h. Location of all existing and proposed utilities (sanitary sewage systems water
systems, storm drainage systems, gas lines, telephone lines and electrical 
power lines);
Thresher Response: Appendix F.
No proposed utilities included in the Application, so the DP does not grant any 
rights to construct utilities. Utilities are not interpreted to include the Project’s 
private collection lines that only connect turbines to substations. Note that 
collection lines within public land, roads or ROW are regulated elsewhere in this 
DP or its related CUP.
i. Drainage controls (retention or detention ponds);
Thresher Response: Appendix F
Existing drainage controls were not included, so the DP requires drainage controls to 
be identified as part of any application to construct any improvement or other site work 
or grading of land included in this DP. No proposed drainage controls 
included in the Application, so the DP does not grant any rights to construct 
drainage controls.
j. Location, size and characteristics of identification and business signs;
Pertinent Text from Application: “Warning signs will be placed at the base of each 
wind tower, electrical equipment, Project substation, and Project entrances. A 
visible warning sign concerning voltage will be placed on all electrical equipment.” 
Application Section 2.3, Page 13.
No other identification or business signs were included, so the DP does not include 
any other signage rights.
k. Lighting layout, appurtenances, and intensity of illumination;
Thresher Response: Application Section 2.8; Appendix F. Pertinent Text from
Application: “Final turbine lighting will comply with current FAA lighting 
regulations.” Application Section 2.8, Page 16.
No other lighting information was included in the Application, so the DP does not 
grant any rights to construct lighting other than the described turbine lighting, and 
the DP requires any other wind project lighting information to be identified as part 
of any application to construct any improvement or other site work or grading of 
land included in this DP.
l. Proposed finished floor elevations of all buildings and structures.
48
PDF page 49

Open original PDF at page 49

No other floor elevation information was included in the Application, so the DP 
requires floor elevation information to be identified as part of any application 
to construct any building or structure on land included in this DP.
3. A statement of intent shall accompany the preliminary development plan to explain
the measures used to achieve compatibility of the proposed development with surrounding 
properties through the planning of the site and the location and design of structures.
Thresher Response: Application Section 1.5. Pertinent Text from Application:
“Thresher has designed the Project to meet all Seward County Zoning Regulations in a way that is 
harmonious with surrounding properties and aligns with industry’s best practices. The Project is sited 
across 12,000 acres of agricultural property. The total land area impacted by the project is estimated to 
be less than 1% of the overall Project properties, and approximately 0.02% of land in Seward County. 
This includes turbines, access roads, turbine foundations, and associated pad-mounted transformers. 
Due to the small surface footprint of a wind project, agricultural activities can continue in close 
proximity to the base of each turbine tower. Any land disturbed during construction will be 
substantially restored to its original condition by loosening compacted soil, replacing native topsoil, 
and/or re-seeding as needed. As a result, the Project aligns with Seward County's goal of preserving 
agricultural land while supporting its continued use for farming activities, as outlined in the 
Comprehensive Plan.”
“In order to ensure compatibility, Thresher has worked closely with the community. Since Invenergy 
acquired the project in 2019, Thresher has been developing meaningful relationships with over 415 
landowners across Seward, Meade, and Gray Counties who have voluntarily signed into contracts to 
participate in the project. Thresher has also been in close communication with local school districts, 
local government officials, and many additional Seward County residents and organizations to ensure 
the project is in alignment with the values of the local community.”
“Thresher will rely on the extensive experience of Invenergy. Invenergy has developed 33GW 
worldwide and owns and operates two wind projects in Kansas while working in the state for over 
a decade. Locally, Invenergy operates several local project offices in Greensburg, Sublette, Meade, 
and Hugoton that are staffed with local employees.”
“As demonstrated by the wind projects operating nearby, this area of Kansas has a world class 
wind resource and land use that is compatible with the operation of a wind project. The success 
and community benefits of wind projects have been proven locally.”
Section 27-104.8(C) Development Plan Requirements
(“The Development Plan required by the Regulations shall contain the following
information:”)
1. A legal description of the perimeter boundaries of the proposed project including 
lease agreements or other satisfactory evidence that the applicant is the owner of the 
property or has written permission of the owner/s to make such application.
Thresher Response: Application Appendix A, which is attached and incorporated into this 
DP.
Page 4 of 6
49
PDF page 50

Open original PDF at page 50

The land included within this DP is both (1) described in Appendix A and also (2) shown 
in red in Appendix F. No other land is included within this DP.
2. The nature and scope of the project, including a plot and development plan showing the 
location of the project, scale and north arrow, acreage of the site, physical dimensions and 
project boundaries, ingress and egress locations, location of the proposed road crossings or 
right-of-way encroachments, stormwater management and erosion control including 100-year 
floodplain boundaries.
Thresher Response: Appendix F.
Appendix F is missing stormwater management and erosion control information, so the DP 
requires the missing information to be identified as part of any application to construct any 
improvement or other site work or grading of land included in this DP.
3. Location of all existing buildings, structures, homes within 1/2 mile of the project 
boundary, electrical transmission lines and facilities, and utilities, utility easements, 
underground pipelines and underground utilities within the project boundary; property lines 
for each property under separate ownership included within the proposed CWECS or CSECS 
boundaries with key identifying each owner; location of all collectors, turbines, substations 
connecting power lines and other structures to be used as part of the operation.
Thresher Response: Appendix F.
Appendix F does not include any substations or other structures to be used as part of the 
operation beyond wind turbines and underground collection lines, so no other wind project 
or operation improvements are included in this DP.
4. For CWECS provide information detailing the type, size, maximum and minimum 
height, rotor size, rotor material, color, rated power output, performance, safety and noise 
characteristics of each proposed wind turbine model, tower, and electrical transmission 
equipment. Provide tower/turbine details that assure the tower shall not be lattice/type or 
other design that provide perches.
Thresher Response: Section 1.4, Appendix F (Application typo on page 5 says “G” instead 
of “F”). Pertinent Text from Application: “Turbine Specifications: While a wind turbine 
model has not been definitively selected for the project, approximate specifications are as 
follows:
Type: Steel tube
Size:
o Maximum Height: 185.5 m / 609ft
o Minimum Height: 185.5 m / 609ft
o Rotor Diameter: 163m / 535ft
o Rotor Material: Fiberglass and structural elements 
o Hub Height: 104m / 341ft
o Total Height (Ground to Tip): 185.5m / 609ft
50
PDF page 51

Open original PDF at page 51

Color: White or off-white
Rated Power Output: 4,500 kW
Ground Clearance: 22.5m / 73ft
Performance: Outstanding performance as a leader in wind turbine manufacturing 
Safety: Aerodynamic braking through full blade feathering with 3 pitch cylinders 
Noise: Low noise blade design.
Primary Turbine Sites: 22 in Seward County”
The above turbine specifications are approved and incorporated into the DP. No changes to these 
specifications are approved or incorporated info the DP. No electrical transmission equipment 
information was provided in the Application other than proposed routes of underground collection lines 
in Appendix F, so the DP requires the missing electrical transmission equipment information to be 
identified as part of any application to construct any improvement or other site work or grading of land 
included in this DP.
Page 6 of 6
51
PDF page 52

Open original PDF at page 52

Thresher
RENE WABLE ENERGY 
CENTER
lnvenergy
Appendix A
Lease Agreement Documentation
Recorded Memos
23
.i �
�
52
PDF page 53

Open original PDF at page 53

LANDOWNER NAME LANDOWNER ADDRESS
WKSPCW0008 Angell Family Trust  c/o Layne Angell PO Box 249,  Kismet, KS 67859 0172500000002000 ROAD X SATANTA KS 67870 25 31 31 SEWARD TOWNSHIP,  ACRES 153.9,  NW4 LESS R/WSECTION 25 TOWNSHIP 31
WKSPCW0008 Angell Family Trust  c/o Layne Angell PO Box 249,  Kismet, KS 67859 0172500000003000 ROAD X SATANTA KS 67870 25 31 31 SEWARD TOWNSHIP,  ACRES 163.6,  SW4 LESS R/WSECTION 25 TOWNSHIP 31
WKSPCW0013 Aubrey G. Linville Revocable Family Trust 124 S. Oakdale Ave Apt# A8, Salina,  KS 67401 0161400000002000 ROAD W SATANTA KS 67870 14 31 31 S14,  T31,  R31,  ACRES 155.4,  NW4 LESS R/W
WKSPCW0007 Ball Family Farms LLC 602 Ark Ave, Liberal,  KS 67901 0130500000003000 ROAD T SATANTA KS 67870 5 31 31 SEWARD TOWNSHIP,  ACRES 79.5,  N2 SW4 LESS R/W SECTION 05 TOWNSHIP 31
WKSPCW0007 0130500000003010 ROAD T SATANTA KS 67870 5 31 31 S05,  T31,  R31,  ACRES 78.4,  S2 OF SW4
Ball Family Farms LLC 602 Ark Ave, Liberal,  KS 67901
WKSPCW0007 0120900000004010 ROAD 26 SATANTA KS 67870 9 31 31 S09,  T31,  R31,  ACRES 163.0,  SE4 LESS BEG SECOR SE4 TH W714.33'; N52.55';
Ball Family Farms LLC 602 Ark Ave, Liberal,  KS 67901 NELY364.82'; NELY587.72'; S30'; S697' TO POB& LESS ROW.
WKSPCW0007 Ball Family Farms LLC 602 Ark Ave,  Liberal,  KS 67901 0151600000001020 ROAD 26 SATANTA KS 67870 16 31 31 S16, T31,  R31,  NW4 LESS BEG NE COR NW4 TH S1430'; NWLY57.3'; N114.61';
WKSPCW0007 Ball Family Farms LLC 602 Ark Ave,  Liberal,  KS 67901 0151600000003000 ROAD V SATANTA KS 67870 16 31 31 SEWARD TOWNSHIP,  ACRES 156.9,  SE4 LESS R/WSECTION 16 TOWNSHIP 31
WKSPCW0039 BNB Farms LLC 608 Glen Oak Cir,  Nixa,  MO 65714 0162300000001000 ROAD 25 SATANTA KS 67870 23 31 31 S23,  T31,  R31,  ACRES 472.6,  E2 & E2•W2 LESS R/W
WKSPCW0094 Borth Farms Inc. 7126 Road L, Plains,  KS 67869 0173600000001000 ROAD Y SATANTA KS 67870 36 31 31 S36,  T31,  R31,  ACRES 160.3,  NE4
WKSPCW0058 Circle F Land LLC PO Box 279,  Plains,  KS 67869 0161300000002000 25689 ROAD X SATANTA KS 67870 13 31 31 S13,  T31,  R31,  ACRES 313.6,  W2 LESS R/W
WKSPCW0586 Clayton & Sharon Befort 1177 Commerce Pkwy,  Hays,  KS 67601 0811100000001000 HIGHWAY 160 SATANTA KS 67870 11 32 31 SEWARD TOWNSHIP,  ACRES 628.3,  ALL LESS R/W SECTION 11 TOWNSHIP 32
WKSPCW0009 0121000000003000 ROAD VSATANTA KS 67870 10 31 31 S10,  T31,  R31,  ACRES 161.8,  SW4 LESS R/W
Darryl& Shlrtey Ball 2970 N Anderson Rd,  Garden City, KS 67846
WKSPCW0009 Darryl& Shlrtey Ball 2970 N Anderson Rd,  Garden City,  KS 67846 0151600000001000 ROAD 26 SATANTA KS 67870 16 31 31 SEWARD TOWNSHIP,  ACRES 155.7,  NE4 LESS ROW SECTION 16 TOWNSHIP 31
WKSPCW0048 Debra K. Eakes Revocable Trust 13204 2 Road,  Plains,  KS 67869 0810100000004000 ROAD 21 PLAINS KS 67869 1 32 31 SEWARD TOWNSHIP,  ACRES 158.6,  SE4 LESS R/WSECTION 01 TOWNSHIP 32
WKSPCW0204 Debra K. Eakes Revocable Trust 13204 2 Road,  Plains,  KS67869 0810100000003000 ROAD 21 PLAINS KS 67869 1 32 31 S01 ,  T32 ,  R31,  ACRES 155.2,  SW4 LESSR/W
WKSPCW0204 Debra K. Eakes Revocable Trust 13204 2 Road,  Plains,  KS 67869 0811200000001000 ROAD 21 SATANTA KS 67870 12 32 31 SEWARD TOWNSHIP,  ACRES 157.7,  NE4 LESS R/WSECTION 12 TOWNSHIP 32
WKSPCW0204 Debra K. Eakes Revocable Trust 13204 2 Road,  Plains,  KS 67869 0173500000003000 ROAD 22 SATANTA KS 67870 35 31 31 S35 ,  T31,  R31,  ACRES 162.4,  SW4 LESS R/W
WKSPCW0204 Debra K. Eakes Revocable Trust 13204 2 Road,  Plains,  KS 67869 0173500000004000 ROAD 22 SATANTA KS 67870 35 31 31 S35 ,  T31,  R31,  ACRES 158.7 ,  SE4 LESS R/W
WKSPCW0646 Donna Marie Walker Trust 17450 Road 17, Kismet, KS 67859 0130600000003000 ROAD T SATANTA KS 67870 6 31 31 SEWARD TOWNSHIP,  ACRES 161.5,  SE4 LESS R/WSECTION 06 TOWNSHIP 31
WKSPCW0091 Douglas D. Langhofer; Debra Dlance Bartel 20960 Road W, Plains,  KS 67869 0810200000002000 ROAD 21 SA TANT A KS 67870 2 32 31 S02,  T32,  R31,  ACRES 160.5,  SW4 LESS R/W
WKSPCW0409 Douglas Fredendall; Webst er Family Trust; Joseph Freden 256 Stearns Ave, Haysville,  KS 67060 0811200000002000 HIGHWAY 160 SATANTA KS 67870 12 32 31 SEWARD TOWNSHIP,  ACRES 156.2,  SE4 LESS R/WSECTION 12 TOWNSHIP 32
WKSPCW0049 Eakes Farm Inc. 13204 2 Road,  Plains,  KS 67869 0810200000003000 ROAD 21 SATANTA KS 67870 2 32 31 SEWARD TOWNSHIP,  ACRES 147.8,  SE4 LESS BEG 30'W NE COR s ec  TH  W1017'
WKSPCW0049 Eakes Farm Inc. 13204 2 Road,  Plains,  KS 67869 0810200000004000 21074 ROAD X PLAINS KS 67869 2 32 31 S02 ,  T32 ,  R31,  ACRES 4.2,  BEG 30'N& 30W  SE COR SE4 TH
WKSPCW0098 Grainfield LP Dean Walt er Richards on PO Box 596,  Plains,  KS 67869 0811200000002010 HIGHWAY 160 SATANTA KS 67870 12 32 31 S12,  T32,  R31,  ACRES 314.0,  W2 LESS ROW
WKSPCW0202 0172600000002000 ROAD X SATANTA KS 67870 26 31 31 SEWARD TOWNSHIP,  ACRES 321.8,  W2 SECTION 26 TOWNSHIP 31 RANGE 31
JAC Enterpris e LLC PO Box 903,  Johns on, KS 67855
WKSPCW0202 0182700000001000 ROAD V SATANTA KS 67870 27 31 31 SEWARD TOWNSHIP,  ACRES 318.8,  E2 SECTION 27 TOWNSHIP 31 RANGE 31
JAC Enterpris e LLC PO Box 903,  Johns on, KS 67855
WKSPCW0099 Jack M. Dulleld Trust 1949 N Webster Ave, Liberal, KS 67901 0173500000001000 ROAD X SATANTA KS 67870 35 31 31 S35,  T31,  R31,  ACRES 153.8,  NE4 LESS R/W& EXC BEG NECOR TH
WKSPCW0099 Jack M. Dulield Trust 1949 N Webst er Ave, Liberal,  KS 67901 0173500000002000 ROAD X SATANTA KS 67870 35 31 31 SEWARD TOWNSHIP,  ACRES 163.0,  NW4 SECTION 35 TOWNSHIP 31 RANGE 31
WKSPCW0099 Jack M. Dufield Trust 1949 N Webster Ave, Liberal, KS 67901 0173600000003000 ROAD X SATANTA KS 67870 36 31 31 S36 ,  T31,  R31,  ACRES 156.3,  SW4 LESS R/W
WKSPCW0067A Jeffrey & Sharleen Unruh 3051 Road A, Copeland,  KS 67837 0162400000002000 ROAD X SATANTA KS 67870 24 31 31 S24,  T31,  R31,  ACRES 157.5,  NW4 LESS R/W
WKSPCW0055A Joan K. Unruh PO Box 125,  Copeland,  KS 67837 0182700000002000 23507 ROAD V SATANTA KS 67870 27 31 31 S27 ,  T31,  R31,  ACRES 156.9,  NW4 LESS R/W
WKSPCW0055B Joan K. Unruh PO Box 125,  Copeland,  KS 67838 0182700000004000 ROAD V SATANTA KS 67870 27 31 31 S27,  T31,  R31,  ACRES 74.2,  N2 SW4 LESS R/W LESS BEG NW CO R NW4 E30' POB
WKSPCW0055C Joan K. Unruh PO Box 125,  Copeland,  KS 67839 0182700000005000 ROAD V SATANTA KS 67870 27 31 31 S27 ,  T31,  R31,  ACRES 80.8,  S2 SW4 LESS R/W
WKSPCW0055C Joan K. Unruh PO Box 125,  Copeland,  KS 67840 0183400000001000 ROAD V SATANTA KS 67870 34 31 31 S34,  T31,  R31,  ACRES 161.1,  NE4
WKSPCW0040 John & Janes e Barnhardt  Revocable Trust 608 Glen Oak Cir,  Nixa,  MO 65714 0130600000001000 ROAD T SATANTA KS 67870 6 31 31 SOS,  T31,  R31,  ACRES 157.5,  NE4 LESS R/W
WKSPCW0644 LCB Poppe Fields LLC At tn: Lyn Briggs 18610 Kevins View,  Peyton, c o  80831 0130800000002000 ROAD 26 SATANTA KS 67870 8 31 31 S08,  T31,  R31,  ACRES 159.1,  SW4 LESS BEG 1192.6'E& 30'N S WCOR SW4,  TH
WKSPCW0644 LCB Poppe Fields LLC At tn: Lyn Briggs 18610 Kevins View,  Peyton, c o  80831 0120900000003000 ROAD 26 SATANTA KS 67870 9 31 31 SEWARD TOWNSHIP,  ACRES 163.3,  SW4 LESS R/WSECTION 09 TOWNSHIP 31
WKSPCW0605 Lee Paul Living Trust 12701 Briar,  Leawood,  KS 66209 0810100000002000 ROAD W PLAINS KS 67869 1 32 31 S01 ,  T32 ,  R31,  ACRES 155.9,  NW4 LESS R/W
WKSPCW0010 Leslie& Gertrude Unruh Trust PO Box 187,  Copeland,  KS 67837 0162400000003000 ROAD X SATANTA KS 67870 24 31 31 SEWARD TOWNSHIP,  ACRES 156.0,  SW4 LESS R/WSECTION 24 TOWNSHIP 31
RANGE31
WKSPCW0041 LRB Farms LLC 608 Glen Oak Cir,  Nixa,  MO 65714 0810200000001000 ROAD 22 SATANTA KS 67870 2 32 31 S02,  T32,  R31,  ACRES 311.7,  N2 LESS R/W
WKSPCW0104 Lynn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0120900000001000 ROAD V SATANTA KS 67870 9 31 31 S09,  T31,  R31,  ACRES 162.4,  NE4 LESS R/W
WKSPCW0104 Lynn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0151500000001010 ROAD W SATANTA KS 67870 15 31 31 S15,  T31,  R31,  ACRES 158.1,  SE4 LESS R/W
WKSPCW0104 Lynn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0151500000003000 ROAD V SATANTA KS 67870 15 31 31 S15,  T31,  R31,  ACRES 156.3,  SW4 LESS R/W
WKSPCW0104 L nn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0152200000001000 ROAD 25 SATANTA KS 67870 22 31 31 S22 T31 R31 ACRES 161.8 NE4 LESS R/W
WKSPCW0104 Lynn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0152200000003010 ROAD V SATANTA KS 67870 22 31 31 S22,  T31,  R31,  ACRES 227.85,  S2 NW4 & SW4 LESS R/W& LESS BEG 30'E& 309'5
WKSPCW0104 Lynn Land & Cattle LLC 24629 Road V,  Plains,  KS 67969 0162300000002000 ROAD 25 SATANTA KS 67870 23 31 31 S23 ,  T31,  R31,  ACRES 161.5,  W2-W2 LESS R/W
WKSPCW0080 M& D Nichols LLC 17378 Road 20, Sublette,  KS 67877 0161400000004000 25504 ROAD X SATANTA KS 67870 14 31 31 SEWARD TOWNSHIP,  ACRES 161.2,  SE4 LESS R/WSECTION 14 TOWNSHIP 31
WKSPCW0005 0183400000002000 ROAD V SATANTA KS 67870 34 31 31 S34,  T31,  R31,  ACRES 160.44,  NW4 LESS R/W
Marvin Scott Reiss Revocable Trust 22958 Hwy  160,  Plains,  KS67869
53
PDF page 54

Open original PDF at page 54

WKSPCW0025B Mary K. Amerin PO Box 772,  Plains,  KS 67869 0161400000001010 ROAD 26 SATANTA KS 67870 14 31 31 S14,  T31,  R31,  ACRES 150.6,  NE4 EXC BEG NE COR NE4;TH S105 O';W63.4';NW
WKSPCW0103 Matt N. Lynn Trust 24629 Road V,  Plains,  KS 67869 0152100000001000 ROAD V SATANTA KS 67870 21 31 31 S21,  T31,  R31,  ACRES 162.7,  NE4 LESS R/W
WKSPCW0103 Matt N. Lynn Trust 24629 Road V,  Plains,  KS 67869 0152200000002000 ROAD 25 SATANTA KS 67870 22 31 31 S22,  T31,  R31,  ACRES 80.4,  N2 NW4 LESS R/W
WKSPCW0622 Raphael L.& Jennifer K. Amerin Revocable Trust PO Box 670, Plains,  KS 67869 0121000000001000 ROAD 26 SATANTA KS 67870 10 31 31 S10,  T31,  R31,  ACRES 319.3,  E2 LESS R/W
WKSPCW0060 Ricky & Paula Correll 841 Clearlake Dr, Prosper, TX 75078 0152100000002000 ROAD 25 SATANTA KS 67870 21 31 31 S21,  T31,  R31,  ACRES 84.2,  N1402.5' NW4 LESS R/W
WKSPCW0060 Ricky & Paula Correll 841 Clearlake Dr, Prosper, TX 75078 0152100000002010 ROAD 25 SATANTA KS 67870 21 31 31 S21,  T31,  R31,  ACRES 75.0,  S1237.5' OF NW4
WKSPCW0012 Roger A. & Kelly D. Eakes 25543 Road V,  Plains,  KS 67869 0151500000002000 ROAD V SATANTA KS 67870 15 31 31 SEWARD TOWNSHIP , ACRES 76.7,  N2 NW4 LESS R/W SECTION 15 TOWNSHIP 31
RANGE31
WKSPCW0012 Roger A. & Kelly D. Eakes 25543 Road V,  Plains,  KS 67869 0151500000002010 25573 ROAD V SATANTA KS 67870 15 31 31 S15,  T31,  R31,  ACRES 78.3,  S2 NW4 LESS S200' OF W250' & LESS R/W
WKSPCW0641 Spring Poppe Fields LLC 2611 SW 17th St Ste# 223, Topeka,  KS 66604 0130800000003000 ROAD 26 SATANTA KS 67870 8 31 31 SEWARD TOWNSHIP,  ACRES 163.0,  SE4 LESS R/WSECTION 08 TOWNSHIP 31
WKSPCW0641 Spring Poppe Fields LLC 2611 SW 17th St Ste# 223, Topeka,  KS 66604 0151500000001000 ROAD W SATANTA KS 67870 15 31 31 S15,  T31,  R31,  ACRES 159.1,  NE LESS R/W
WKSPCW0037 Susan Jacobs 20500 Road 26, Plains,  KS 67869 0151600000004000 ROAD 25 SATANTA KS 67870 16 31 31 S16,  T31,  R31,  ACRES 156.0,  SW4 LESS R/W
WKSPCW0037 Sus an Jacobs 20500 Road 26, Plains,  KS 67869 0141700000003000 ROAD 25 SATANTA KS 67870 17 31 31 S17, T31,  R31, ACRES 297.54,  E2 LESS R/WLESS BEG NE COR NE4 S30' POB TH
WKSPCW0031 Warren C.& Arlen R. Lynn Revocable Trust 7420 Marie Ln, Lincoln, NE 68516 0130800000001000 ROAD T SATANTA KS 67870 8 31 31 SOB,  T31,  R31,  ACRES 322.0,  N2 LESS R/W
WKSPCW0031 Warren C.& Arlen R. Lynn Revocable Trust 7420 Marie Ln, Lincoln, NE 68516 0161400000003000 ROAD WSATANTA KS 67870 14 31 31 S14,  T31,  R31,  ACRES 159.6,  SW4 LESS R/W
WKSPCW0031 Warren C.& Arlen R. Lynn Revocable Trust 7420 Marie Ln, Lincoln, NE 68516 0152200000004000 ROAD VSATANTA KS 67870 22 31 31 S22,  T31,  R31,  ACRES 162.4,  SE4
54
PDF page 55

Open original PDF at page 55

Thresher
RENE WABLE ENERGY 
CENTER
lnvenergy
Appendix F 
Development Plan Map
Site Traffic Ingress-Egress Map
28
.i �
�
55
PDF page 56 - Project layout overview

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 84

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 84.

Project layout overview, as displayed on page 56 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 56. Open original PDF at page 56.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

\ll' WfltwO
a::oc:,c,c,o:,o 
37.300864 -100.680889 
37.3S2339 ·100.703n 3 
37.346321 ·100.699347 
37.300817 -100.673397 
37.3S288'1·100.6S983S 
37.346192 ·100.65S338 
37.346217 ·100.649896 
37.33293 ·100.686472 
37.33961< 1-100.6815"4 
37.341971 -100.676328 
37.34088 -100.667932 
37.330647 -100.6722S7 
7.302643 -100.6S59S2 
37.296S26 -100.647249 
37.366863 ·100,72235S 
37.366839 ·100.716871 
37.36'136 ·100,711404
o, �So Ce(, ): lld (2<1n�h riWorldlm1CervSn emap
A<<i med2025�U.S.Censu18 o1e;iu(2024).
3,200 Feet
Westwo od
'f ct ffw (88819 37-5150 we rtw o o dps.co m
Thresher Wind Project
Project Infrastructure and Public Utilities Overview
Legend
CJ  Project Area - 12,610.25 localRoad
Acres
Proposed Site Layout @ Turbine□ County Boundary
Seward County, Kansas
Exhibit 1
Underground Power
Oil& Gas
Sewage
Water
-
HaulRoute
- - MajorRoad
- - AccessRoad
Collection line
Existing Utilities
i=1i=10,c  Overhead Power
56
PDF page 57 - CUP Map Book - map 1

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 85

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 85.

CUP Map Book - map 1, as displayed on page 57 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 57. Open original PDF at page 57.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

(lelltDT.&I• 
Lea:end 
r:ZJ 
rz:::a 
tlOIOOd Stlftts 
(Acce,, Ar.c
AiA :111 West wo o ,
-
Thresher Wind Pr,
Seward County, Ki
CUP Ma
c:J  Property Une
Non-Parti cipati ng Parcel
LJ  Occupied Structure
- Unoccupied Structure
R ecorded Easement
- H aulR oute
Proposed Site Lr; out
- - AccessR oad
= = = = °  Collecti on Line
o verhead Uti lity - Turbine H eight+  
40 Feet( 649 ft )
PubllcR oadway - Turbine H eight+  
75 Feet( 684 ft )
Unleased Adjoining Property  
R otor Length+  500 Feet (767 ft:)
R esidence•  1000ft  
Setback sti n1 Uti llti es
�  Overhead Power
= Oll& Gas
All non-hatched parcels within the
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.s ., e11u1s8 ure1u(X12.-);USGS30EP{ essed2025}.
_J
r
,1:_,_:::·""::�:_:.·�§  :�::::�:•.••�
'�/
. /
./
bed<s
_
I
57
PDF page 58 - CUP Map Book - map 2

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 86

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 86.

CUP Map Book - map 2, as displayed on page 58 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 58. Open original PDF at page 58.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

tlOIOOd Stlftts 
(Acce,, Ar.c
We stwo o d
Thresher Wind Project 
Seward County, Kansas
CUP Map Book
Page 2
100-Year FloodplaJn
Local Road
- - - - t OftContour
2ft Contour
Project Infrastructure R oad 
Crossing/ ROW Encroachment
= = = ° Collection Line
All non-hatched parcels within the
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.s ., e11u1s8 ure1u(X12.-);USGS30EP{ essed2025}.
1,200 Feet
58
PDF page 59 - CUP Map Book - map 3

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 87

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 87.

CUP Map Book - map 3, as displayed on page 59 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 59. Open original PDF at page 59.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

-.5, ff'W:' 
-:::;
--., 
tlOIOOd Stlftts 
(Acce,, Ar.c
We stwo o d
Thresher Wind Project
Seward County, Kansas 
CUP Map Book
Page 3
·-�
�-
i. . . _________,
-- ·- · 10ft  Contour
* Project Infrastructure R oad Crossing/
R OW Encroachment
__. . ,.-�,,. -.. ),
. . ,-l e ?-\ �)
R esidence•  1000ft  
Setback ng Uti liti es
. /
l,1 ''\
______  j jjjf
. . ';
'( ,.,_
_l t·_
-�
\". .-, ._,,
'\
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.s ., e11u1s8 ure1u(X12.-);USGS30EP{ essed2025}.
1,200 Feet
�
·" ('�
,, �
!" "<t-� '
• •  " : •
,! '(,, _  • •  - • _. -.  - - - - , .  "..�- - :
I ' -- ;
,
 
;,
""
,
"'
\ 4
!,
,<
I
'i
.:f'
,
lfi
J = = = °  Collecti on Line
\  !;;�> /
,
 ;· '', ' l
 •• -
 
,
 .)•· r·, -
' ', /
 
� -.}>i "• 
_
:  
-
�
,.- ,?
_,,.,_"_ :I\.,  ·_"- • -
.
All non-hatched parcels within the
,_,,,.
I
,
· �1 ' �
\
' \
'--,·, -­
;,j
<f
'
.,.. � \ . ""9'.
"-";
t
,!"
'; ·,
59
PDF page 60 - CUP Map Book - map 4

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 88

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 88.

CUP Map Book - map 4, as displayed on page 60 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 60. Open original PDF at page 60.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

c::::I 
c:::J 
rz:::J 
1111 
iz::::::;;a 
Layout
lb:::::dl 
l!:=!lfeet(684ft) 
l"'""""""I 
..... 
c:::J 000ft
c::::,
tlOIOOd Stlftts 
(Acce,, Ar.c
We stwo o d
Thresher Wind Project
Seward County, Kansas 
CUP Map Book
Page4
� County Boundary
Property  line
Non-ParticipatingParcel
� OccupiedStructure
- - l OftContour
- �- 2 ttc ontour
Project InfrastructureR oad Crossing/ 
R OW Encroachment
ProposedSlte
:f - - AccessR oad
l  0 0 0 0  Collection line
/ @ Turbine
Setbacks
, ead Utility  -Turbine Height + 40
� �ev:;((649ftt)l
□  :�: �\ 684 ft)
ay -TurbineHeJght+ 75
Unle 1sedAdjoiningProperty -R otor 
Leng  h+ SOOFeet( 767ft )
� R eslc ence -1 Setback
ExllstlnJUtHlH, tles
C10  Overhead Power
Underground Power
= Oil& Gas
_ _ Sewage
All non-hatched parcels within the
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.S.Ce11u1s8 ure•u(X12.-);USGS30EP{ essed2025}.
�
-·
ProjectArea
.!
/
Feet 649f
:R oadw
'\
�, =
\ ,
,
\ \ /'
} ..... /
60
PDF page 61 - CUP Map Book - map 5

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 89

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 89.

CUP Map Book - map 5, as displayed on page 61 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 61. Open original PDF at page 61.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

lliO 
tlOIOOd Stlftts 
(Acce,, Ar.c
We stwo o d
1� 1�.i -... ��- �.. --I
_,,, ,,, ,.(
/ ' l . . ,.- ''-�-�m - 
-
I
\
Thresher Wind Project
Seward County, Kansas 
CUP Map Book
Page 5
1 00-YearFloodplaln
local Road
- - l OftContour
- �- 2 ttc ontour
'f.'
All non-hatched parcels within the
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.s ., e11u1s8 ure1u(X12.-);USGS30EP{ essed2025}.
1,200 Feet
nm..,__ �
\ (
� --
..  ,. --�, .
. - _r .
 
,�l�
J, ;
,f/ 4 -' '�'
J 
61
PDF page 62 - CUP Map Book - map 6

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 90

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 90.

CUP Map Book - map 6, as displayed on page 62 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 62. Open original PDF at page 62.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

tlOIOOd Stlftts 
(Acce,, Ar.c
We stwo o d
Thresher Wind Project 
Seward County, Kansas
CUP Map Book
Page 6
100-Year Floodplain
localRoad
--·- ·-·-- 10ft Contour
-- --· 2ft Contour
sting Utilities
Underground Power 
Oil& Gas
Water
All non-hatched parcels within the
project area are participating.
om  Source[t): Wes (20251; ESRI WMS World l lld WD!ld lmaaerv
8 n emap sed202Sl;U.s ., e11u1s8 ure1u(X12.-);USGS30EP{ essed2025}.
1,200 Feet
�
62
PDF page 63 - FEMA flood zone and public utilities overview

Map page: extracted text is unreliable. Use the image below to read this page. Some maps in the released CUP contain garbled labels or symbols; this image preserves those source defects. Keyword results may miss or misread map labels.

View this map in the application - clearer version, PDF page 91

That link opens the county-posted application in a new tab (internet required). It is a separate source, not a replacement for the CUP. If the PDF opens at the beginning, go to page 91.

FEMA flood zone and public utilities overview, as displayed on page 63 of the released CUP; source artifacts are preserved.
Image of released CUP PDF page 63. Open original PDF at page 63.
Show unreliable extracted text

This text is retained for reference and keyword searching. It does not preserve map layout and must not be used to interpret boundaries, labels, or setbacks.

\ll'Ce ""'l
c::,c::,c::,o 
• � ,  : • ' " wo rld l "f
;�;: df���m:!r�i��;:�= 1�(202'�FlM.AThresher Wind Project Seward County, Kansas
FEMA Flood Zone and Public Utilities Overview
□
'f ct ffw (88819 37•5150 we rtw o o dps.co m
County Boundary
l OOVear Floodplain
- - Major Road
Local Road
10ft Contour
2ft Contour
Existing Utilitfes
Overhead Power
- - Underground Power
= Oil& Gas
- - Sewage
- - Water
Westwo od
Acres
3,200 Feet
Legend
CJ  Project Area - 12,610.25
A.
Exhibit 2
63
PDF page 64

Open original PDF at page 64

DRAFT
CERTIFICATE OF LIABILITY INSURANCE
DATE(MM/DD/YYYY)
10/21/2026
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS 
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES 
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED 
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If 
SUBROGATION IS WAIVED, subject to   the terms and conditions of the policy, certain policies may require an endorsement. A statement on this 
certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Aon Risk Services Central, Inc.
Chicago IL Office
200 East Randolph
Chicago IL 60601 USA
INSURED
Thresher Wind LLC
One South Wacker Drive
Suite 1500
Chicago IL 60606 USA
COVERAGES CERTIFICATE NUMBER:
CONTACT
NAME:
PHONE
(A/C. No. Ext):
E-MAIL
ADDRESS:
(866) 283-7122 FAX
(A/C. No.):
REVISION NUMBER:
(800) 363-0105
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested
INSR
LTR
B
TYPE OF INSURANCE
X COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
PRO-POLICY LOC
OTHER:
AUTOMOBILE LIABILITY
ANY AUTO
OWNED
AUTOS ONLY
HIRED AUTOS
ONLY
UMBRELLA LIAB 
EXCESS LIAB
SCHEDULED
AUTOS
NON-OWNED
AUTOS ONLY
OCCUR
CLAIMS-MADE
DED RETENTION
WORKERS COMPENSATION AND 
EMPLOYERS' LIABILITY
ANY PROPRIETOR / PARTNER / EXECUTIVE 
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
Y / N
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
CERTIFICATE HOLDER
ACORD 25 (2016/03)
CANCELLATION
©1988-2015 ACORD CORPORATION. All rights reserved. 
The ACORD name and logo are registered marks of ACORD
INSURER(S) AFFORDING COVERAGE NAIC #
INSURER A: Ironshore Specialty Insurance Company 25445
INSURER B: Federal Insurance Company 20281
INSURER C:
INSURER D:
INSURER E:
INSURER F:
ADDL
INSD
SUBR
WVD POLICY NUMBER POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY) LIMITS
35848841 07/01/2026 07/01/2027 EACH OCCURRENCE $1,000,000
DAMAGE TO RENTED
PREMISES (Ea occurrence) $1,000,000
MED EXP (Any one person) $25,000
PERSONAL & ADV INJURY $2,000,000
GENERAL AGGREGATE $2,000,000
PRODUCTS - COMP/OP AGG $2,000,000
COMBINED SINGLE LIMIT
(Ea accident)
BODILY INJURY ( Per person)
BODILY INJURY (Per accident)
PROPERTY DAMAGE
(Per accident)
EACH OCCURRENCE
AGGREGATE
N / A
PER STATUTE OTH-
ER
E.L. EACH ACCIDENT
E.L. DISEASE-EA EMPLOYEE
E.L. DISEASE-POLICY LIMIT
X
X
JECT
Board of Seward County Commissioners
of Seward County, Kansas
515 N. Washington Avenue, Suite 207
Liberal KS 67901 USA
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE
POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
EXHIBIT C: CERTIFICATE OF LIABILITY INSURANCE
64
PDF page 65

Open original PDF at page 65

DRAFT
Page 1 of 11 
Exhibit D: County Agreement Minimum Terms 
CU2025-02 Contribution Agreement Minimum Terms 
1. Annual Payment.  Thresher will provide an annual payment to the County Treasurer in 
December each calendar year beginning December of the calendar year in which the Project 
COD, which shall not be less than $3,940/MW of nameplate installed wind generating capacity 
if COD occurs in 2028, escalating at a rate of 3% compounding cumulatively each subsequent 
calendar year  irrespective of whether COD occurs later than 2028, for a total of ten consecutive 
annual payments, and as illustrated below: 
Year December Payment 
2029 $4,058/MW 
2030 $4,180/MW 
2031 $4,305/MW 
2032 $4,434/MW 
2033 $4,567/MW 
2034 $4,704/MW 
2035 $4,845/MW 
2036 $4,991/MW 
2037 $5,141/MW 
2038 $5,295/MW 
In the event that after the execution date of this Agreement the Project becomes exempt from ad 
valorem property tax for years beyond year ten (10), Thresher shall continue making annual 
payments beginning in the amount of $5,295/MW of installed wind generating capacity if the 
Project commences commercial operation in 2028 or $5,454/MW of installed wind generating 
capacity if the Project commences commercial operation in 2029 and, in each case, escalating at a 
rate of 3% compounding cumulatively each subsequent calendar year, until the earlier of the date 
the Project is decommissioned and no longer in operation or the date that such ad valorem 
property tax exemption is terminated and the Project becomes subject to ad valorem property tax.  
In the event the Project becomes exempt from ad valorem property taxes for years beyond year ten 
(10) then payments shall be paid to the County Treasurer in December. 
The County may direct each Contribution to any taxing jurisdiction, general County fund, or 
specific fund or funds as may be directed by the County from time to time; provided, however, that 
the County hereby acknowledges and agrees that it is the County’s intent to distribute the 
Contributions hereunder in such a way as the County determines to be in the best interests of the 
residents of the County. 
 
2. Annual Payment Exceptions, Reduction . If any tax is imposed on Thresher by the State of 
Kansas  any of its governmental subdivisions, the amount of the payments due under this 
Agreement shall be reduced by the amount of tax imposed: (a) real or personal property tax due 
with respect to property located in Kansas, owned by Thresher Wind and associated with the 
operation of the facility; (b) any amount of Kansas sales or use tax due with respect to (i) 
65
PDF page 66

Open original PDF at page 66

DRAFT
Page 2 of 11 
property purchased for use in either the construction or enlargement of the facility or (ii) any 
purchase of machinery and/or equipment used either (x) as an integral or essential part of the 
integrated production operations of the facility or (y) for the handling, movement or storage of 
the output of the facility; (c) any Kansas state or local (other than Kansas income tax, the 
Kansas franchise tax or the Kansas sales and use tax) is imposed on the income, operations or 
property of the facility; (d) the Kansas statutes (or the regulations thereunder) are amended after 
the date of this Agreement so as to reduce the tax benefits available to Thresher Wind and/or the 
facility under K.S.A. 79 -32,160a; K.S.A. 74 -50,132; K.S.A. 79 -3606(cc); K.S.A. 74 -50,115; 
K.S.A. 79 -3606(kk); K.S.A. 79 -3606(fff) or K.S.A. 79 -201 (Eleventh); or (e) any mortgage 
registration tax. 
 
Notwithstanding any other provision herein, if in any one year between years 11 and 20 of the 
Project’s operation the amount of taxes levied for Seward County (excluding taxes levied for 
USD 483 and any other taxing entity) related to the Project are less than the amounts provided 
for in this Agreement, Thresher Wind shall pay to Seward County the difference between the 
amounts provided for in this Agreement and the amount of taxes levied for Seward County. This 
provision is contingent upon the Project being in operation 
3. Parity with Meade and Gray County.  If Thresher executes a Contribution Agreement or 
amends a Contribution Agreement with the Board of County commissioners of Meade County or 
Gray County, Kansas related to the construction of this Project where the annual, per -megawatt 
payment exceeds Annual Payment per -megawatt set forth in this Agreement, then the Parties 
hereby agree to amend this Agreement so that the payments set forth in Section 3 will match the 
annual, per -megawatt payment structure within the Contribution Agreement with Seward 
County, as applicable. 
 
4. Enforcement.  In the event of any dispute arising under this Agreement or claim of any 
breach or default under this Agreement, one Party will first send the other Party written notice of 
the claim or dispute. Within ten (10) days following the receipt of a written notice from either 
Party identifying such dispute or claim, the Parties shall meet, negotiate and attempt, in good 
faith, to resolve the dispute or claim quickly, informally and inexpensively. If the Parties are 
unable to resolve a dispute or claim arising here under within thirty (30) days of initiating such 
discussions, or within forty (40) days after notice of the dispute, either Party may seek any and 
all remedies available to it at law or in equity.   
 
CU2025-02 Decommissioning Agreement Minimum Terms 
1. Obligation of Thresher to Decommission the Project.  Thresher shall decommission 
individual wind turbines and the Project in accordance with all applicable laws and regulations 
(“Decommissioning”). Decommissioning with respect to each turbine shall include, among other 
activities, (i) removal of the turbine, nacelle and tower, (ii) removal of interconnection 
transmission poles, lines, and all electric equipment, (iii) removal of the tower foundation to a 
depth of at least four (4) feet below grade, and the bottom two feet of the foundation shall be 
replaced with subsoil composed of sand, silt, and clay materials and the top two feet with topsoil 
suitable for supporting vegetation, (iv) removal of all access roads and replacement with topsoil, 
unless otherwise requested by the landowner, (v) reseeding all disturbed areas, or as otherwise 
agreed to with the affected landowner, and (vi) removal of Project infrastructure and materials 
66
PDF page 67

Open original PDF at page 67

DRAFT
Page 3 of 11 
within the public right of way  up to a depth of six (6) feet , except for collection lines and 
underground borings , if said underground infrastructure or material was located at a depth 
required by the County.  All Project materials or infrastructure located within the public right of 
way must be marked and locatable on terms reasonably imposed by the County so that at any 
time County can verify the location of any such materials or infrastructure, and  also registered 
with Kansas 811. A reasonable estimated completion date, within twelve (12) months post -
commencement of Decommissioning shall be provided to the County. The decommissioning 
shall be acceptable to the affected landowners, which shall not be unreasonably withheld , 
conditioned, or delayed. 
The Decommissioning of individual wind turbines by Thresher shall commence within 
twelve (12) months immediately following the earliest to occur of (a) the termination of the land 
rights providing for the site upon which the individual turbine stands; (b) the expiration of the 
land rights term; or (c) failure to operate the turbine for a period of twelve (12) months for 
reasons other than Force Majeure unless a plan outlining the steps and schedule for returning the 
turbine to service is submitted and appro ved by the County within the twelve (12) month 
discontinuation period, which approval shall not be unreasonably withheld, conditioned, or 
delayed. If the request is denied the parties will submit the issue to mediation pursuant prior to 
proceeding with any formal court action. Within the timeline set forth above, the CWECS 
structures and components will be removed from the site . Additionally, all easements will be 
released. The land will be returned to its original condition and will be graded, top -soiled, and 
reseeded according to Natural Resource Conservation Service recommendations or similar best 
practices, unless otherwise agreed to with the affected landowner or otherwise detailed in the 
executed Decommissioning Agreement. 
“Force Majeure” shall mean an event beyond the control of the party affected such as: 
acts of God, war, civil commotion, riots or damage to work in progress by reason of fire or other 
casualty, strikes, lock outs or other labor disputes, delays in transportation, inability to secure 
labor or materials in the open market, war, terrorism, sabotage, civil strife or other violence, 
pandemic or other public health emergency, improper or unreasonable acts or failures to act by 
the County, the failure of any gover nmental authority to issue any permit, entitlement, approval 
or authorization within a reasonable period of time after a complete and valid application for the 
same has been submitted, the effect of any law, proclamation, action, demand or requirement of 
any government agency or utility, litigation, contesting all or any portion of the right, title and 
interest of County or Company under this Agreement, or any other unforeseen events or events 
over which the Company and/or Project has no control. Force Maje ure shall not excuse or delay 
any obligation to make payments, including without limitation amounts owed to the County or to 
any third party for financial security, insurance, or similar monetary obligations.   
 
2. Continuing Obligation; Forfeiture of CUP.  Thresher acknowledges its obligations under 
this Agreement are continuing in nature. The failure of Thresher to perform its decommissioning 
obligations under this Agreement shall be considered an Event of Default and shall result in the 
CUP being revoked. In addition to revoking the CUP, the County may seek any other legal 
remedies it may have resulting from Thresher’s failure to perform its obligations under this 
Agreement. An “Event of Default” shall mean a failure by Thresher Wind to commence or 
recommence (as the case may be) satisfying its Decommissioning obligations under this 
67
PDF page 68

Open original PDF at page 68

DRAFT
Page 4 of 11 
Agreement within sixty (60) days after written notice from the County (except to the extent that a 
cure cannot reasonably be completed in such 60 -day period, so long as Thresher Wind diligently 
pursue a cure to the default, subject to Force Majeure Delays).  
3. Release of Decommissioning Obligation.  Promptly following Thresher’s  delivery of 
documentation, acceptable to the County, evidencing Thresher’s  fulfillment of its 
Decommissioning obligations described herein, the County shall execute and deliver to Thresher 
a Certificate of Completion. Upon Thresher’s receipt of the Certificate of Completion, the 
Decommissioning Agreement shall terminate and be of no further effect. 
 
4. Verification of Accounting.  Thresher will represent to the County that Thresher has a 
requirement under Generally Accepted Accounting Principles (“GAAP”) to account for the 
future decommissioning obligations for project assets on leased property or property in which it 
has land rights. The Asset Retirement Obligation (“ARO”) will be reflected on Thresher’s books, 
records and financial statements. Thresher will annually provide the County with the amount of 
the portion of the aggregate that represents Thresher’s estimated decommissioni ng obligation to 
the County under this Agreement. 
 
5. Decommissioning Reserve.  Thresher represents to the County that it will account for the 
future Decommissioning obligations on its books, records and financial statements as required by 
GAAP or International Financial Reporting Standards (IFRS) based on Thresher’s then -current 
accounting standards (GAAP or IFRS). The ARO under GAAP or the substantively equivalent 
amount under IFRS will be reflected on  Thresher’s books, records and financial statements as 
required under GAAP or IFRS, as applicable. Thresher will annually provide the County with the 
amount of the portion of the aggregate that represents Thresher’s estimated Decommissioning 
obligation to the County under this Agreement. 
 
6.  Decommissioning Restoration Fund .  Upon commencement of construction of the Project , 
Thresher Wind shall establish a fund (“Restoration Fund”) at a federally chartered bank to secure 
Thresher Wind’s Decommissioning obligations, the documentation shall list the financial institution 
and County as parties.  In the event of a Default, the County may use the Restoration Fund to take 
steps necessary to fulfill the defaulter’s obligations. Thresher Wind shall contribute the estimated 
cost of its Decommissioning obligations to the County prior to the start of construction for each of 
the properties in the Project, net of any estimated salvage value of Thresher Wind’s equipment, 
facilities and improvements located on each of the Project properties (“Net Restoration Amount”), 
but that estimated salvage value will be increased by any amount reasonably estimated that the 
County might incur during the time period until the Restoration Fund amount is re-set as part of the 
County actually receiving the salvage proceeds (examples include costs to pay off liens, to acquire 
ownership of the assets, and to m anage the salvaging and Decommissioning process) .  T he Net 
Restoration Amount shall be re -set every seven (7) years after it is initially set, based on new 
estimates of the cost of removal and salvage value of Thresher Wind’s equipment, facilities and 
improvements located on the Project properties located within the County. The County shall have 
sixty (60) days to serve notice that it disagrees with the Net Restoration Amount determined by 
Thresher Wind. If the County serves such notice  then the Parties will mutually agree on an 
independent engineer with suitable experience in the wind industry (the “Independent Engineer”) to 
determine the Net Restoration Amount. The fees of the Independent Engineer shall be paid by 
68
PDF page 69

Open original PDF at page 69

DRAFT
Page 5 of 11 
Thresher Wind. In the Event of Default, the County may draw upon or otherwise access the 
Restoration Fund to complete or cause to be completed the decommissioning.   
 
7.  Mediation; Enforcement. The Parties will attempt in good faith to resolve all disputes under 
this Agreement promptly by negotiation. If a dispute cannot be resolved within sixty (60) days of 
the dispute arising through direct negotiations of the Parties, either Party may initiate mediation 
as provided herein. Such dispute shall be submitted to any mutually agreeable mediator prior to 
proceeding with any formal court action. If the parties are unable to agree, the American 
Arbitration Association shall appoint a mediator. The media tion shall take place at a neutral site. 
All negotiations and mediation procedures shall be treated as and considered as compromise and 
settlement negotiations for the purpose of the Federal Rules of Evidence and state rules of 
evidence. The Parties shall equally split the cost of the mediator. For costs of mediation, other 
than the cost of the mediator, each Party shall bear its own costs.   
 
CU2025-02 Road Use Agreement Minimum Terms 
1. Duties of Thresher. Thresher has or shall undertake the following activities in 
accordance with the terms of this Agreement: 
 
a.  Thresher and the County will identify representatives who will be present for the 
Construction Activities and the timeline in which those representatives will be identified. 
 
 b. Thresher will provide a preliminary site plan which will outline parts of the 
Project as applicable, such as haul routes, turbine locations, site access points, Road crossings, 
access roads, highway haul routes, county roads, local roads, dirt/unpaved roads, and US/State 
roads, the Project area. Thresher will provide a site plan prior to the construction of the Project 
with additional information as identified in the Road Use Agreement. 
c. The Road Use Agreement will designate the role and responsibilities of a County 
Consultant. The Consultant’s role may be covered from time -to-time as the County might 
designate, including by one or more people or businesses including different than the initial 
Consultant, and by County employees, provided at all times the County selects persons or 
businesses qualified for the role. 
d. All Road entrances, permanent or temporary, constructed for the purposes of the 
Project shall be installed in locations which provide adequate sight distances and where 
applicable, will have installed drainage structures adequately sized so as not to significantly 
change existing drainage. Culverts for entrances shall be sized by a Kansas Licensed 
Professional Engineer. All costs associated with construction of Project entrances shall be the 
sole responsibility of Thresher. 
e. Thresher shall be responsible for preserving or perpetuating all existing Public 
Land Survey System (“PLSS”) corner monuments, public right-of-way monuments, and property 
boundary monuments affected by the Project. Corner monuments found to be in danger of being 
disturbed during construction of the Project will have an endangerment report filed with Seward 
County and the Kansas State Historical Society by a Professional Land Surveyor licensed in 
69
PDF page 70

Open original PDF at page 70

DRAFT
Page 6 of 11 
Kansas (“PLS”). In areas where it appears that a monument location could be disturbed by 
Thresher construction activities, Thresher will be responsible to employ a PLS to search for 
existing monumentation in accordance with applicable Kansas State Statutes, any existing 
monuments which become disturbed or destroyed by Thresher construction activities are to be 
re-established in accordance with applicable Kansas State Statutes. 
f. Thresher shall notify the Consultant by email on Monday of each week in 
advance of all planned oversize transportation and crane movements along any Road, including 
perpendicular crossings to be performed during such week. Thresher shall provide to Consultant 
typical axle configurations with weight per axle for oversize  transportation movements at least 
thirty (30) calendar days prior to Construction Activities. All perpendicular crossings are to 
occur along the approved roads and repaired immediately if damaged as outlined in this 
agreement.  
g. Thresher shall transport or cause to be transported the turbine segments, other 
oversize loads, and construction equipment, materials, and supplies in a manner designed to 
minimize adverse impact on the local traffic. 
h. Thresher shall provide advance notice to the County when it is necessary for a 
Road to be scheduled for closure for more than 15 minutes due to a crane crossing or for any 
other reason relating to the construction of the Project. Notwithstanding the foregoing, Thresher 
shall provide no less than 24 -hour notice when practicable for any anticipated closure exceeding 
15 minutes and shall in all cases provide all materials and personnel necessary to close the Road 
safely. 
 i.  Thresher shall provide signage of all Road closures and work zones in compliance 
with the most current manual on Uniform Traffic Control Devices adopted by the State of 
Kansas. Thresher shall comply with all local, state, and federal requirements when removing or 
changing any signage. KDOT approval for removing the signs and/or sign replacement 
specifications shall be provided to the County and Consultant.  
j. Thresher shall provide dust control measures to prevent the surface and air transport of 
dust during Construction Activities, and the requirements Thresher must meet in providing dust 
control. 
k.  Prior to commencement of Construction Activities, Thresher shall construct, at its 
sole cost and expense, any improvements or repairs necessary to permit the safe and efficient use 
of the Road for Construction Activities (“Pre -Construction Improvements”). Thresher shall 
provide regular maintenance required to Roads damaged by the Project during the Project’s 
construction, including grading and repairing damaged areas along paved and unpaved Roads 
during Construction Activities. Appropriate maintenance techn iques and methods will be 
approved by Consultant, which approval shall not be unreasonably withheld , conditioned, or 
delayed. The County shall not be responsible for maintaining any road or project upgrades 
installed by or required for construction of the project. 
70
PDF page 71

Open original PDF at page 71

DRAFT
Page 7 of 11 
l. Upon completion of Construction Activities, Thresher shall purchase and install 
applicable road materials for repairs and perform and bear all costs to restore any Roads that are 
utilized by Thresher during the Construction Activities to a condition at least equal to that which 
existed immediately prior to the commencement of the Construction Activities and as identified 
in the Pre and Post-construction Inventories (as hereinafter defined). 
m. Thresher will make a reasonable effort to source materials for repairs required to 
construct the Roads pursuant to this Agreement in a manner that will not materially impact 
County’s ability to source materials for performance of County’s routine and regular 
maintenance obligations. All material used by Thresher for repairs to County property must be 
approved by Consultant, which approval shall not be unreasonably withheld , conditioned, or 
delayed. 
n. Provide terms that require emergency repairs to Roads damaged during 
construction of the Project.  
o. To the extent applicable to the Roads, Thresher shall comply with all federal, 
state, and local laws, statutes, ordinances, rules, regulations, judgments, and other valid orders of 
any governmental authority having jurisdiction over the Project, and obtain all permits and 
licenses required in connection with the use and repair of the Roads. 
p. Provide terms to deal with the requirement for County oversize or overweight 
permits and the associated fees so that at all times Roads remain passable by typical existing 
County traffic. 
q. Upon completion of the Project, Thresher may offer to donate to the County any 
surplus gravel, culverts, and other materials not including turbine components. If the County 
takes possession or gives notice of its intent to take control of the surplus materials, it shall be 
responsible for all costs and expenses related to removing or relocating the materials and shall do 
so within 120 calendar days of written notification. 
r. The Road Use Agreement will contain terms that require Thresher to reimburse 
the County for reasonable out -of-pocket expenses, including the cost of the Pre - and Post -
Construction Inventories, professional engineering fees and expenses for County’s Consultant. 
The reimbursement provision may contain a max allowance but will not be less than $175,000 in 
the aggregate plus $10,000 a month if construction takes longer than 12 months. 
s. The Road Use Agreement will contain terms regarding Thresher, its contractors, 
or its supplier’s use of County roads other than those designated for Project construction 
purposes and repair of damage caused by the use. 
2. Obligations of County. The County, in accordance with the terms of the Agreement, 
agrees that it has or shall: 
 a. The County will provide Thresher with contact information of a representative. 
The Road Use Agreement will specify the details of the notification.  
71
PDF page 72

Open original PDF at page 72

DRAFT
Page 8 of 11 
b. The Road Use Agreement will contain a provision regarding notifications to 
Thresher of routine and regular County maintenance of the Roads. 
d. The County will authorize Thresher and its contractors engaged in the 
construction, operation  and maintenance of the Project to travel over the Roads with loads 
exceeding the weight limits set by County, if any. 
3. Approvals, Process and Appeals.  The Parties, in accordance with the terms of this 
Agreement, agree that each has or shall: 
3.1   Acknowledge that the County has approval and permitting authority with respect to 
the subject matter of this Agreement pursuant to state law. 
3.2   Acknowledge that the County’s Consultant has been engaged to assist the County in 
reviewing and evaluating the implementation of this Agreement and that the County has 
granted such approvals, permits, surveys, evaluations or the like (the “Consultant 
Activities”) as are required to facilitate the matters covered by this Agreement. 
3.3   County acknowledges it has directed the Consultant to consult and cooperate, and 
Thresher acknowledges that it shall consult and cooperate, in good faith and in a 
commercially reasonable manner, with respect to Construction Activities and 
Consultant’s Activities to conduct their respective activities hereunder in such a manner 
as to facilitate the efficient, economic, safe and timely construction and operation of the 
Project. County shall not be liable to Thresher for any failure, breach or omission o f 
Consultant; provided, however, that Thresher is entitled to rely on approvals, 
representations and decisions (collectively “Consultant’s Approvals”) made or directed 
by the Consultant on behalf of the County, unless such Consultant’s Approvals are 
overturned or countermanded in writing by the Road and Bridge Director before Thresher 
has undertaken Construction Activities in reasonable reliance upon such Consultant’s 
Approvals. 
3.4   In the event of an issue or disagreement between Thresher and Consultant regarding 
the nature of scope of Consultant’s Activities or the implementation of this Agreement 
cannot be mutually resolved to the satisfaction of Thresher and the Consultant, such 
matter may be presented to the Road and Bridge Director for mediation and 
determination. If either Thresher or the Consultant disagrees with such determination of 
the Road and Bridge Director, such matter may be appealed  to the Board of County 
Commissioners for presentation and final determination. 
3.5    In the performance of this Agreement and unless otherwise specifically provided 
herein, as between the Consultant and the Road and Bridge Director, the Road and Bridge 
Director shall be the final decision-maker on behalf of the County and Thresher may rely 
on the Road and Bridge Director in acting on any such decisions.  
4. Pre-Construction Inventory . Prior to commencement of Construction Activities, the 
Consultant will perform a survey and evaluation to record, document, and report on the existing 
condition of the Roads (the “Pre-Construction Inventory”). 
72
PDF page 73

Open original PDF at page 73

DRAFT
Page 9 of 11 
5. Pre-Construction Improvements . Thresher will provide an Action Plan  detailing any 
improvements or repairs to Roads, sub-surfaces, grades, ditches, traffic control, bridges, culverts, 
pipes, crane crossings, or any other drainage structures on roads necessary for, or related to, the 
Project shall be presented to the County and Consultant by Thresher for approval by the County 
or Consultant prior to initiating the desired improvements or repairs. Prior to commencement 
Construction Activities, inclusive of the construction, reconstruction, and/or decommissioning 
phases of the Project, Thresher shall construct, at its sole cost and expense, any improvements or 
repairs necessary to permit the safe and efficient use of the Roads for Construction Activities.  
No jump spans shall be used to temporarily cross bridges or culverts.  All costs to replace or 
modify bridges and culverts to support construction loads shall be paid by Thresher.  All 
concrete trucks must comply with Kansas legal loads and when loaded, haul with the tag and 
bridge axles down.  Construction vehicles must keep speeds to less than 35 mph.  All unpaved 
haul routes must have a minimum of 4 inches of gravel installed prior to use by Project. 
Consultant or County may request additional gravel placed along stretches of Roads that are soft, 
failing, or show additional signs of wear and tear from construction usage with additional gravel 
installed within 48 hours of demand. All gravel weight tickets must be provided to Consultant for 
review. No construction equipment is allowed to be loaded, unloaded, or parked within County 
rights-of-way or on County roads. 
6. Construction Activities Inventory. The Consultant will serve as a liaison between the Parties 
to this Agreement. During the Construction Activities, the Consultant is expected to inspect the 
Roads being used by Construction Activities on a regular basis, unless otherwise directed by the 
County, and report to Thresher and County regarding the conditions of such Roads. All costs and 
expenses to the County with respect to the Consultant’s responsibilities under this section shall 
be reimbursed to the County by Thresher. 
7. Post-Construction Inventory . The Road Use Agreement will require a post -construction 
inventory following the completion of construction of the Project and will detail the 
requirements and duties of the inventory. 
8. Repairs and Restoration . Following the Post -Construction Inventory and evaluation of the 
damage, Thresher shall, at its sole expense, restore the Roads to a condition not less than the 
condition that existed as demonstrated by the Pre -Construction Inventory in accordance with the 
results of the Consultant’s Post-Construction Inventory. 
9. Emergency Repairs . Thresher shall, as soon as reasonably possible and not later than 24 
hours after becoming aware of any emergency or hazardous conditions on the Roads, notify the 
Consultant and Road and Bridge Director of any such conditions and, unless directed otherwise 
by Consultant or Road and Bridge Director, shall repair or restore such conditions at Thresher’s 
sole expense if such condition arises out of Thresher’s use of the Roads, with respect to whether 
such condition also results from deferred maintenance by the  County during the course of 
Thresher’s use of the Roads. If any such condition is not corrected by Thresher within such 24 
hours period after Thresher’s receipt of such notice, the County may cause emergency road and 
bridge repair to be performed by County personnel or qualified contractors, and Thresher shall, 
73
PDF page 74

Open original PDF at page 74

DRAFT
Page 10 of 11 
within 30 days following receipt of an itemized invoice for the costs of said repairs, reimburse 
the County for all reasonable repair costs, including overtime for County personnel, incurred by 
the County for said repairs. 
10. Security Required . Prior to commencement of Construction Activities on the Roads, 
Thresher shall provide security to the County in the amount not less than $2,000,000 and in the 
form of a performance and payment bond, Parent Guaranty or letter of credit (the “Security”). 
11. Costs. All costs and expenses of maintaining the Security, including the fees and expenses of 
the Security, and the costs and expenses of making distributions out of the Security, shall be 
borne by Thresher. 
12. Term of the Security . The Security shall continue until the delivery by Thresher to the 
County of written notice certifying that the Project is commercially operational, that all 
obligations incurred by Thresher in the performance of this Agreement have been paid, and that 
the County has no outstanding claims for payments or reimbursements arising from this 
Agreement, and the Road and Bridge Director’s approval of such certification, which shall not be 
unreasonably withheld, conditioned or delayed. 
13. Separate Agreement . All other terms and conditions concerning the Security, and the 
provisions for making claims against the Security, shall be negotiated in good faith between the 
County and Thresher. 
14. Required Insurance . Thresher shall, upon CCD of the Project and for the period of 
construction of the Project, maintain in full force and effect, commercial general liability 
insurance naming Seward County and the Consultant as additional insureds in the aggregate 
amount not less than $7,000,000.00.   
15 .Disputed Costs. In the event Thresher Wind challenges all or part of an amount invoiced or 
for which the County otherwise seeks reimbursement, Thresher Wind shall provide a written 
notice of any amount disputed and the basis for such dispute to the County. The County and 
Thresher Wind shall then meet and confer in good faith and in a reasonable manner to analyze, 
discuss and resolve the dispute. Thresher Wind shall not dispute any cost with respect to any 
activity with respect to the Thresher Wind project of which Threshe r Wind had knowledge at the 
time it was ongoing or included within this Agreement unless Thresher Wind immediately 
brought the dispute to the attention of the County and, unless directed by Road and Bridge 
Director otherwise, Thresher Wind suspended all construction activities to which the cost related.  
In the event Thresher Wind disputes its liability for any cost, such dispute shall be resolved by 
the Seward County Commission after providing Thresher Wind a reasonable opportunity to 
present the reasons for the dispute. Thresher Wind shall pay any disputed amount determined by 
the Seward County Board of Commissioners to be due within 10 days of such determination. 
16. Remedies and Enforcement. The Parties acknowledge that money damages would not be an 
adequate remedy for any breach or threatened breach of this Agreement. Each of the Parties 
hereto covenant and agree that in the event of default of any of the terms, provisions or 
conditions of this Agreement by any Party (the “Defaulting Party”), which default is not caused 
74
PDF page 75

Open original PDF at page 75

DRAFT
Page 11 of 11 
by the Party seeking to enforce said provisions (the “Non -Defaulting Party”), and after notice 
and reasonable opportunity to cure has been provided to the Defaulting Party, then in such an 
event, the Non -Defaulting Party shall have the right to seek specific performance and/or 
injunctive relief to remedy or prevent any breach or threatened breach of this Agreement. The 
remedies of specific performance and/or injunctive relief shall be exclusive of any other remedy 
available at law or equity.  
CU2025-02 All County Agreements Minimum Terms 
Except as otherwise provided in CUP §II 1 -3 which terms control if any conflict with this 
paragraph: , Thresher Wind shall reimburse the County’s reasonable attorney fees in the event a 
formal court action is brought for the enforcement or defense of this Agreement: (1) because of a 
default or dispute between the Parties, and the County is the prevailing party; or (2) due to a third 
party claim, only to the extent such action arises directly from Thresher Wind’s breach of this 
Agreement or wrongful act or omissions. 
 
 
75
PDF page 76

Open original PDF at page 76

DRAFT
 1 
108183989.1 
Exhibit E: Good Neighbor Agreement Form 
 
 
After recording return to: 
Thresher Wind LLC 
One South Wacker Drive 
Suite 1500 
Chicago, Illinois 60606 
ATTN: Land Administration 
 
 (SPACE ABOVE THIS LINE FOR RECORDER’S USE ONLY) 
 
NEIGHBOR AGREEMENT 
 
THIS NEIGHBOR AGREEMENT (this “Agreement”) is made, dated and effective as of 
[  , 20__] (the “Effective Date”) by and between [_____________________] residing 
at [___________________________], and its/their successors and assigns ( collectively, 
“Owner”), and Thresher Wind LLC , a Delaware limited liability company (“ Developer”).  
Owner and Developer may hereafter be referred to herein individually as a “ Party” and together 
as the “Parties”. 
 
RECITALS 
 
A. Owner owns the real property legally described on Exhibit A attached hereto and made a 
part hereof (the “Owner’s Property”) and such Property is not part of the Wind Project (as defined 
below). 
 
B. Developer is developing an electric -generating wind power project (“ Wind Project ”) 
located in a portion of _____________ County, Kansas (“Wind Project Property”).  Developer 
expects that some of the wind turbine generators, including associated towers, foundations, and 
support structures (collectively the “Generating Units”) of the Wind Project will be installed on 
land adjacent to or near Owner’s Property. 
 
AGREEMENT 
 
1. Construction Impact .  Developer recognizes that Owner due to its location next to 
construction areas may be inconvenienced by construction noise and activities.  Owner 
acknowledges Developer has informed Owner of the potential impacts of construction and agrees 
the compensation provided in this Agreement is adequate for the impacts described. 
 
2. Payments.  In consideration of this Agreement and the rights granted herein, Developer 
shall pay to Owner a fee in the amount and at the times as described in Exhibit B attached hereto..   
 
3. Term.  The term of this Agreement (the “ Term”) shall commence upon the Operations 
Date and shall end on the date that is fifty (50) years following the date on which the Wind Project 
reaches the Operations Date.  “ Operations Date” shall mean the date on which Developer first 
produces wind energy in commercial quantities from Generating Units located on the Wind Project 
76
PDF page 77

Open original PDF at page 77

DRAFT
 2 
108183989.1 
Property.  Upon termination, Developer shall file a termination of this Agreement  in the public 
records.  If the operation of the constructed Wind Project ceases for a continuous period of five (5) 
years, and Developer and any successors or assigns have abandoned the development or operation 
of the Wind Project, then Owner may request by written notice to Developer to termina te and 
quitclaim this Agreement, and Developer shall deliver a termination and quitclaim of this 
Agreement in recordable form within forty-five (45) days of any such request. 
 
4. Assignment.  Developer shall have the right without Owner’s consent to sell, convey, lease, 
or assign all or any portion of this Agreement to one or more persons or entities (collectively, 
“Assignees”).  Under no circumstances shall any Lender or Assignee have any greater rights of 
ownership or use of the Easements than the rights granted to Developer in this Agreement.  Any 
member or partner of Developer or an Assignee shall have the right without Ow ner’s consent to 
transfer any membership or partnership interest in Developer or such Assignee to one or more 
persons or entities. 
 
5. Covenants Running With the Land.  The Parties hereby agree that all of the covenants and 
agreements contained in this Agreement touch and concern the real estate described in this 
Agreement and are expressly intended to, and shall, be covenants running with the land and shall 
be binding  and a burden upon Owner’s Property and each Parties’ present or future estate or 
interest therein and upon each of the Parties, their respective heirs, administrators, executors, legal 
representatives, successors and assigns as holders of an estate or interest in Owner’s Property 
(including without limitation, any lender or other person acquiring title from any such person upon 
foreclosure or by deed in lieu of foreclosure), and shall benefit Developer and its respective heirs, 
administrators, executors, legal representatives, successors and assigns and the Wind Project 
Property. 
 
6. Entire Agreement.  This Agreement constitutes the entire agreement between Owner and 
Developer and no promises or representations, express or implied, either written or oral, not herein 
set forth shall be binding upon or inure to the benefit of Owner and Developer.  This Agreement 
shall not be modified by any oral agreement, either express or implied, and all modifications hereof 
shall be in writing and signed by both Owner and Developer. 
 
7. Remedies.  If Developer violates the terms or conditions of this Agreement, Owner shall 
be entitled to any remedy available under applicable law or equity.  If Owner violates the terms or 
conditions of this Agreement, Developer shall be entitled to any remedy available under applicable 
law or equity.   
 
8. Notices.  Any notice to be given hereunder or which either Party wishes to give to the other 
shall be in writing and may be delivered personally to the other or given by mailing by depositing 
the same in the U.S. Mail, with all postage and certification charges t hereon prepaid, in a sealed 
envelope and sent by registered or certified mail with return receipt requested, addressed as 
follows: 
 
If to Owner: [Landowner] 
 [Address] 
 
77
PDF page 78

Open original PDF at page 78

DRAFT
 3 
108183989.1 
If to Developer: Thresher Wind LLC 
Attn: General Counsel 
1 S. Wacker Drive, Suite 1500 
Chicago, IL 60606 
               
or to such other address as either Party shall hereafter specify by written notice to the other.  Any 
notice shall be deemed delivered three days after deposit in the mail in accordance with the 
foregoing provision. 
 
9. Governing Law.  This Agreement shall be governed by and construed in accordance with 
the laws of the State of Kansas. 
 
10. Partial Invalidity . S hould any provision of this Agreement be held, in a final and 
unappealable decision by a court of competent jurisdiction, to be either invalid, void or 
unenforceable, the remaining provisions hereof shall remain in full force and effect, unimpaired 
by the holding.   
 
11. Counterparts. This Agreement may be executed in counterparts, each of which shall be 
deemed an original and all of which when taken together shall constitute one and the same 
document 
 
[NTD: executed agreement will attach signatures, acknowledgements, and Exhibit A Property 
legal, and otherwise be sufficient for Register of Deeds recording] 
 
DO NOT RECORD THIS PAGE 
 
EXHIBIT B 
Payment Terms 
In consideration for the rights provided to the Developer under the Agreement, Developer agrees 
to make payments to the Owner as follows: 
1. Operating Fees.  Upon commencement of the Operations Date, and for each year during 
the Term of this Agreement (each an “Operations Term Year”), Developer shall pay to Owner a 
fee of $500.00 Dollars ($500.00). The first Operating Fee shall be paid within sixty (60) calendar 
days of the Operations Date. All subsequent Operating Fees shall be paid by the anniversary of the 
Operations Date.  
3. IRS Form W-9.  Notwithstanding anything in this Agreement to the contrary, Developer 
shall have no obligation to make any payment to Owner otherwise required under this Agreement 
until Owner has returned to Developer a completed Internal Revenue Service Form W-9, such W-
9 form to either (i) have been provided by Developer to Owner prior to execution of this Agreement 
or (ii) be provided by Developer to Owner promptly upon execution of this Agreement. 
DO NOT RECORD THIS PAGE 
78